Residential Building Permit (New Construction) in Winslow, Arizona
Required for new single-family and two-family dwelling construction in the City of Winslow. Reviewed against the 2018 International Residential Code (including Appendix Q and Appendix K) as adopted and amended by the City of Winslow (Winslow Municipal Code § 15.04.040(B)). Applications are submitted to the Community Development Department.
Verified 2026-07-13 · Source
When you need this permit
- Building permit required for new single-family and two-family dwelling construction within Winslow city limits
- Plans must comply with the 2018 IRC and City of Winslow Climatic and Geographic Design Criteria (30 psf ground snow load; 115 mph wind speed, Exposure C; 18-inch frost depth; Seismic Zone B)
- For projects exceeding 3,000 sq ft, exceeding 20-person occupancy, or with any structural member over 14 feet, construction documents must be prepared and sealed by an Arizona Registered Design Professional
- Application must include a completed Building Permit Application, a copy of the completed septic permit where applicable, and three (3) complete sets of scaled plans and specifications (site plan, foundation detail, floor plan, framing detail/cross sections, roof detail, truss specifications and layout, electrical/plumbing/mechanical plans, elevations)
- A residential fire sprinkler system may be installed but cannot be mandated by the City per A.R.S. § 9-807
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation/Footing
Before concrete pour
- 2
Framing
Structural framing, connections, and egress per 2018 IRC and City design criteria
- 3
Rough Electrical/Plumbing/Mechanical
Combined rough-in inspection before wall closure
- 4
Final
All work complete per approved plans; inspections must be called in 24 hours in advance (no same-day inspections except emergencies)
See the full Winslow inspection guide — scheduling & re-inspection fees →
Tips
- The City of Winslow's own Community Development page states plan review will take approximately 15 working days, after which one set of reviewed plans is returned to the applicant; no additions, alterations, or modifications to approved plans are permitted without the Building Official's written approval.
- A $100 residential plan review deposit is due at submission and applied toward the final plan review fee, which totals 65% of the building permit fee for up to three review sessions.
- Registered Design Professional sign-off is required only above specific thresholds (3,000 sq ft, 20-person occupancy, or a 14-foot structural member) — many standard single-family homes may fall under these thresholds depending on scope.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Winslow building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Winslow
Residential Building Permit (New Construction) in other cities
Compare residential building permit (new construction) fees across Arizona →
Look up this fee in a different city →