Winslow building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Winslow, Arizona.
Verified 2026-07-13 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 102 E. Third Street, Winslow, AZ 86047 (2025 AZBO Directory lists the department's own address as 21 Williamson Avenue, Winslow, AZ 86047; the City's live website header lists City Hall at 102 E. Third Street — both are cited here as the City has not published a single reconciled address)
- Phone
- 928-289-1476
- Office hours
- Not separately published by the Community Development Department; general City Hall contact is Monday-Friday per the City's main Contact page (102 E. Third Street, phone 928-289-2422, fax 928-289-3742). Building-permit-specific questions are directed to 928-289-1476 or comdevelopment@winslowaz.gov, per the City's Community Development page.
- Website
- Official site
Inspection sequence
Applies to: Residential Building Permit (New Construction)
- 1
Foundation/Footing
Before concrete pour
- 2
Framing
Structural framing, connections, and egress per 2018 IRC and City design criteria
- 3
Rough Electrical/Plumbing/Mechanical
Combined rough-in inspection before wall closure
- 4
Final
All work complete per approved plans; inspections must be called in 24 hours in advance (no same-day inspections except emergencies)
Applies to: Manufactured/Mobile Home and Factory-Built Building Installation Permit
- 1
Set-up/Foundation
Verifies foundation and tie-down/anchoring prior to occupancy
- 2
Utility Connections
Electrical, plumbing, and gas connections
- 3
Final
Completed installation verified; up to 3 inspections included in the base fee for most categories
Applies to: Plumbing Permit
- 1
Underground/Slab
Before concrete pour or backfill — verify pipe slope, materials, tracer wire, cleanouts
- 2
Rough-In
After pipes installed, before walls closed
- 3
Final
Fixtures connected, drainage/vent air test verified per 2018 IPC (5 psi or 10-inch mercury column, held 15 minutes minimum)
Applies to: Residential Addition / Remodel Permit
- 1
Foundation/Footing
Required before concrete pour for additions
- 2
Framing
Structural connections to the existing structure
- 3
Final
Completed work verified against approved plans
Applies to: Electrical Permit
- 1
Rough Electrical
Wiring, box placement, and panel connections before walls are closed
- 2
Final
Devices installed, panel labeled, hi-pot test completed for 1,000A+ equipment, protections verified per 2017 NEC
Applies to: EV Charger Installation Permit
- 1
Rough Electrical
Charger circuit wiring, box placement, and panel connections before walls are closed, where applicable
- 2
Final
Charger installed, hi-pot test completed for 1,000A+ equipment, protections verified per 2017 NEC
Applies to: Mechanical / HVAC Permit
- 1
Rough-In
Ductwork and equipment placement before walls closed
- 2
Final
Equipment operational, clearances and combustion air verified
Applies to: Solar Photovoltaic (PV) Permit
- 1
Rough Electrical
Conduit runs, wire sizing, and disconnect placement before cover
- 2
Final
Racking, roof penetrations, and electrical connections verified
Final inspection only: Demolition Permit, Fence Permit and Inspection, Re-Roofing Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Winslow building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Winslow building permits
Get alerts for Winslow
We'll email you when Winslow's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.