Manufactured Home Installation Permit in Taylor, Arizona
Required for placement of a manufactured home in the Town of Taylor. Only multi-section manufactured homes are a permitted use under the Town's Zoning Code; single-wide homes require a Conditional Use Permit and are allowed only on agricultural-zoned property. Both a Town of Taylor building permit and a State of Arizona Office of Manufactured Housing (OMH) installation permit are required.
Verified 2026-07-07 · Source
When you need this permit
- Only multi-section manufactured homes are a permitted use Town-wide; single-wide (SW) homes are allowed only on agricultural-zoned property as a Conditional Use, requiring a Conditional Use Permit (CUP) and a mandatory public hearing before the Planning and Zoning Commission
- Minimum 1,100 square feet
- Home's tongue must be removed
- Masonry block skirting on an appropriate foundation required, subject to Arizona Office of Manufactured Housing (OMH) approval of skirting plans
- Special venting requirements apply in Special Flood Hazard Areas
- For homes placed on privately owned lots outside a manufactured-home rental community, an affidavit of affixture (converting the home to real property) must be filed before a Certificate of Occupancy is issued
- All Arizona OMH laws and rules must be complied with; Arizona no longer permits Owner-Builder permits for manufactured home installation — a licensed installer must apply for the permit Owner-builder
- Home should be oriented with its wide side parallel to the front lot line; roof pitch not less than 3:12 with eaves of 6 inches or greater (Spanish-style architecture exempt from the eave rule); home must be securely anchored with an approved OMH anchoring system
- Each exterior door must have a completed porch or deck of at least 32 sq ft before a Certificate of Occupancy will be issued
- New and pre-owned home exteriors must be completely finished and in like-new condition; any garage, carport, or room addition must match the home's exterior material and roofing as closely as practicable
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 4 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation/Anchoring
Verify masonry block skirting foundation and OMH-approved anchoring system before enclosure
- 2
Final
Porch/deck (32 sq ft minimum per exterior door), exterior finish condition, and garage/carport/addition material match verified before Certificate of Occupancy
See the full Taylor inspection guide — scheduling & re-inspection fees →
Tips
- Confirmed gap: no Town-published fee line item specific to 'Manufactured Home Installation' was found distinct from the general Building Permit Fee (75% valuation modifier); the standard residential building-permit fee structure is applied here as the best-available governing figure after an exhaustive check of the Town's current (2025) Fee Schedule, which itemizes Homes, Garage, Portable Sheds/Containers/Carports, Fences, and Plan Review but does not separately list manufactured homes.
- This is a two-permit process: a Town of Taylor building permit AND a separate Arizona Office of Manufactured Housing (OMH) state installation permit are both required — the Town's own handout is explicit that OMH governs the technical installation/anchoring standards while the Town governs zoning, placement, and the local aesthetic-parity requirements (matching exterior material, roof pitch, porch/deck requirement).
- Single-wide manufactured homes are geographically restricted: allowed ONLY on agricultural-zoned property via a discretionary Conditional Use Permit with a public hearing — they are not a permitted use anywhere else in Town.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Taylor building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Taylor
Manufactured Home Installation Permit in other cities
Compare manufactured home installation permit fees across Arizona →
Look up this fee in a different city →
Now live
Build your Taylor project checklist
Describe your project once and get every permit, document, and fee it triggers in Taylor — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →