Residential/Commercial Solar Photovoltaic (PV) System Permit in Taylor, Arizona

Required for installation of a rooftop or ground-mounted solar photovoltaic system in the Town of Taylor. Solar PV Systems have their own dedicated, published flat fee line under the Town's current Fee Schedule (effective April 5, 2025) — $200.00, listed separately from the general $50 combined Electrical-Mechanical-Plumbing trade-permit fee — confirming solar is a real, distinct billed category rather than folded into the general electrical fee. Arizona statute A.R.S. § 9-468 independently governs solar permit standards and caps whatever fee is actually charged at the Town's actual cost of issuing the permit.

Verified 2026-07-20 · Source

When you need this permit

  • Building/electrical permit required for solar PV installation within Taylor town limits, submitted via the Town's Building Permit Application (Building/Zoning Department, Taylor Town Hall, 425 Papermill Road)
  • Governed by the 2015 IBC/IRC (structural mounting) and 2014 NEC (electrical interconnection) as adopted and amended by the Town — see codesAdopted
  • Per A.R.S. § 9-468(A), the Town may not require a professional engineer's stamp on a standard residential rooftop PV system absent a written, installation-specific finding of necessity
  • Per A.R.S. § 9-468(D), any fee the Town assesses for a solar PV permit 'shall not exceed the actual cost of issuing the permit' — an independent statewide statutory ceiling that applies on top of, and could in principle constrain, the Town's own published $200.00 flat fee
  • Contractor must hold a valid Arizona ROC license, or the applicant must be the bona fide property owner (owner-builder), per the same requirement documented in this file's Residential Building Permit entry Owner-builderContractor

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Solar PV SystemsTown of Taylor Fee Schedule, effective April 5, 2025 (tayloraz.gov/wp-content/uploads/2025/04/2025-Fee-Schedule.pdf) — listed as its own dedicated line item under Building > Other Fees, distinct from the general $50.00 combined Electrical-Mechanical-Plumbing trade-permit fee documented in this file's Electrical/Mechanical/Plumbing Permit entry.
$200.00
Green TagTown of Taylor Fee Schedule, effective April 5, 2025 — temporary power/final utility release tag, applicable to a new interconnection the same as other electrical work.
$25.00
Re-InspectionTown of Taylor Fee Schedule, effective April 5, 2025.
$75.00

Review timeline

Plan reviewTaylor’s published plan-review target
10–10 business days

How long did your Residential/Commercial Solar Photovoltaic (PV) System Permit permit actually take in Taylor?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical / Interconnection

    Wiring, disconnect placement, and conduit verified before closure and utility interconnection.

  2. 2

    Final

    Panel/array wiring complete, disconnect labeled, Green Tag issued for utility interconnection.

See the full Taylor inspection guide — scheduling & re-inspection fees →

Tips

  • Taylor is one of the few jurisdictions in this batch of solar-coverage additions to publish an actual, dedicated $200 flat solar fee line rather than folding solar into the general electrical trade-permit fee — confirmed directly from the Town's current (April 2025) Fee Schedule.
  • This $200 fee is separate from, and in addition to, the Green Tag ($25) and any Re-Inspection ($75) fees documented elsewhere in this file.
  • Arizona's statewide A.R.S. § 9-468 independently caps whatever the Town actually charges at its actual cost of issuing the permit and bars a mandatory PE stamp absent written, project-specific justification — worth raising if the $200 fee appears disproportionate to a specific small residential installation's actual review cost.

Frequently asked questions

Taylor requires a residential/commercial solar photovoltaic (pv) system permit for: Building/electrical permit required for solar PV installation within Taylor town limits, submitted via the Town's Building Permit Application (Building/Zoning Department, Taylor Town Hall, 425 Papermill Road); Governed by the 2015 IBC/IRC (structural mounting) and 2014 NEC (electrical interconnection) as adopted and amended by the Town — see codesAdopted; Per A.R.S. § 9-468(A), the Town may not require a professional engineer's stamp on a standard residential rooftop PV system absent a written, installation-specific finding of necessity; Per A.R.S. § 9-468(D), any fee the Town assesses for a solar PV permit 'shall not exceed the actual cost of issuing the permit' — an independent statewide statutory ceiling that applies on top of, and could in principle constrain, the Town's own published $200.00 flat fee; Contractor must hold a valid Arizona ROC license, or the applicant must be the bona fide property owner (owner-builder), per the same requirement documented in this file's Residential Building Permit entry. If your project isn't listed, confirm with Town of Taylor Building / Zoning Department (Development Services Department) at 928-536-7366 before starting work.

$200.00 flat, per the Town of Taylor Fee Schedule effective April 5, 2025 — listed as its own dedicated 'Solar PV Systems' line item, separate from the general $50.00 combined Electrical-Mechanical-Plumbing trade-permit fee.

Taylor's published plan-review target for a residential/commercial solar photovoltaic (pv) system permit is 10–10 business days.

You'll need: Building Permit Application; Site/Plot Plan. See the required-documents checklist on this page for details on each.

Taylor requires 2 inspection(s) for a residential/commercial solar photovoltaic (pv) system permit, in order: Rough Electrical / Interconnection, Final. Schedule each through Town of Taylor Building / Zoning Department (Development Services Department) (928-536-7366).

Apply through Town of Taylor Building / Zoning Department (Development Services Department) at Taylor Town Hall, 425 Papermill Road (P.O. Box 158), Taylor, AZ 85939. Phone: 928-536-7366, email: geri@tayloraz.gov. Office hours: Town Hall is currently open Monday - Thursday, 7:30 a.m. - 5:30 p.m. (closed Fridays and all major holidays), per the Town's current live website. An older (2014) Town of Taylor 'Homeowner's Guide to Permits' handout lists Development Services Department hours as Monday - Friday, 8:30 a.m. - 5:00 p.m.; the Town Hall-wide 4-day/10-hour schedule on the current tayloraz.gov site is treated as the more current figure for permit-counter purposes. The single Building Official/Zoning Administrator position (reporting directly to the Town Manager as part of the executive leadership team, per the Town's 2024 AZBO job posting) administers both building permits and zoning/planning for the Town.. Official information: https://www.tayloraz.gov/departments/building/.

Taylor, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/town authority under state enabling statutes (A.R.S. Title 9). The Town of Taylor independently adopts and administers its own construction codes through its own Building/Zoning Department (Development Services Department) at Taylor Town Hall; it does not defer building permitting to Navajo County. Verified independence: Taylor maintains its own Municipal Code Chapter 15.05 (Building and Construction Codes), its own Fee Schedule (effective April 5, 2025), its own Building Permit Application, and a dedicated Building Official/Zoning Administrator position reporting to the Town Manager. The Town shares only Fire/EMS (Taylor-Snowflake Fire) and Police (Snowflake-Taylor Police Department) with the adjacent Town of Snowflake — building/zoning permitting is NOT a shared program between the two towns. Source: Town of Taylor Municipal Code § 15.05 (codepublishing.com/AZ/Taylor/html/Taylor15/Taylor1505.html); tayloraz.gov Building Department and Permits pages; Town of Taylor Fee Schedule effective 4/5/2025; Town of Taylor Building Official/Zoning Administrator job posting (AZBO, 2024).; 2015 International Building Code (IBC), published by the International Code Council, adopted by reference with Appendices C and I, as amended by the Town of Taylor (Taylor Municipal Code § 15.05). Source: Town of Taylor Municipal Code § 15.05.040 (codepublishing.com/AZ/Taylor/html/Taylor15/Taylor1505.html).; 2015 International Residential Code (IRC) for One- and Two-Family Dwellings, adopted by reference with Appendices A, B, H, M, N, R, and S, as amended by the Town of Taylor. Source: Town of Taylor Municipal Code § 15.05.; 2015 International Plumbing Code (IPC), adopted by reference, as amended by the Town of Taylor. Source: Town of Taylor Municipal Code § 15.05.; 2015 International Mechanical Code (IMC), adopted by reference, as amended by the Town of Taylor. Source: Town of Taylor Municipal Code § 15.05.; 2015 International Fuel Gas Code (IFGC), adopted by reference with Appendices A, B, and C, as amended by the Town of Taylor. Source: Town of Taylor Municipal Code § 15.05.; 2009 International Energy Conservation Code (IECC) — notably one code family behind the Town's otherwise-2015 ICC set. Source: Town of Taylor Municipal Code § 15.05.; 2015 International Existing Building Code (IEBC), adopted by reference, as amended by the Town of Taylor. Source: Town of Taylor Municipal Code § 15.05.; 2015 International Fire Code (IFC), adopted by reference as the Town's uniform fire code, as amended by the Town of Taylor. Source: Town of Taylor Municipal Code § 15.05.; 2014 National Electrical Code (NEC/NFPA 70), published by the National Fire Protection Association, adopted by reference, as amended by the Town of Taylor — one edition behind the otherwise-2015 ICC family set (the same one-cycle-behind pattern seen in other Navajo County towns, e.g. Show Low's 2017 NEC alongside 2018 ICC codes). Source: Town of Taylor Municipal Code § 15.05.; Residential fire sprinklers: IRC Section R313 is deleted in its entirety and replaced with a cross-reference directing compliance to Arizona Revised Statute § 9-807 (the state statute governing municipal authority to require or not require residential fire sprinklers) rather than the model code's own prescriptive sprinkler trigger. Source: Town of Taylor Municipal Code § 15.05 (IRC Chapter 3 amendment).; Manufactured homes, mobile homes, and factory-built buildings: construction/installation standards are regulated directly by the State of Arizona (Arizona Department of Housing, Office of Manufactured Housing (OMH); A.R.S. § 41-4001 et seq.). The Town of Taylor's own Building/Zoning Department governs on-site placement, foundation/tie-down, and zoning compliance, and imposes its own additional zoning-based requirements (see localAmendments). As of the Town's published guidance, Arizona no longer allows Owner-Builder permits for manufactured home installation — a licensed installer must apply for the permit. Source: Town of Taylor 'Manufactured Homes Requirements in Taylor AZ' handout (Taylor Building/Zoning Department); A.R.S. § 41-4001 et seq.. Local amendments apply — see the Taylor overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Taylor building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.