Electrical / Mechanical / Plumbing (Trade) Permit in Taylor, Arizona

Combined flat-fee permit category for electrical, mechanical, and plumbing installation, alteration, or repair work in the Town of Taylor, governed by the 2014 NEC, 2015 IMC, and 2015 IPC as adopted and amended by the Town. Trade permits can be applied for individually or as a combined 'M.P.E. COMBO' on the Town's Building Permit Application.

Verified 2026-07-07 · Source

When you need this permit

  • Permit required to install or alter any permanent wiring or electrical device (homeowners may replace existing devices without a permit)
  • Permit required for water heater replacement, altered piping within walls/ceilings/floors, and new plumbing installations (ordinary minor repairs to accessible fixtures do not require a permit)
  • Permit required for heating, cooling, and ventilation system work, including wood stoves, bath vents, and gas piping (including gas line sizing per the Town's published Natural Gas Line Sizer worksheet)
  • Governed by the 2014 NEC, 2015 IMC, 2015 IPC, and 2015 IFGC as adopted by the Town of Taylor
  • Town's Building Permit Application supports 'ELECTRICAL', 'PLUMBING', 'MECHANICAL' as separate checkboxes, or 'M.P.E. COMBO' for combined trade work
  • Generator installations require compliance with the Town's published Generator Use & Safety guidance

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical-Mechanical-Plumbing (combined trade permit category)Town of Taylor Fee Schedule, effective April 5, 2025 (Building > Other Fees); supersedes the older 2014 Homeowner's Guide figure of a $25 minimum based on number of fixtures/units/circuits installed
$50.00
Solar PV SystemsTown of Taylor Fee Schedule, effective April 5, 2025 — listed as its own line item under Building > Other Fees, distinct from the general electrical trade fee
$200.00
Green TagTown of Taylor Fee Schedule, effective April 5, 2025 — temporary power/utility release tag
$25.00
Re-InspectionTown of Taylor Fee Schedule, effective April 5, 2025
$75.00

Review timeline

Plan reviewTaylor’s published plan-review target
10–10 business days

How long did your Electrical / Mechanical / Plumbing (Trade) Permit permit actually take in Taylor?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Wiring, piping, or ductwork verification before closure

  2. 2

    Service/Meter (electrical only)

    Service entrance and panel verification prior to utility connection

  3. 3

    Final

    Devices/fixtures/equipment installed and operational, code-compliant

See the full Taylor inspection guide — scheduling & re-inspection fees →

Tips

  • The Town's current (2025) Fee Schedule lists a single flat $50 line item covering 'Electrical-Mechanical-Plumbing' rather than itemizing per-fixture/per-circuit charges — this supersedes the older 2014 Homeowner's Guide description of a per-item fee structure with a $25 minimum.
  • No dedicated same-day or expedited review track for trade permits was found published by the Town; the general 'up to two weeks' plan-review figure from the Permits page is applied here as the governing published timeframe, though minor trade work is often issued over the counter in practice per the older Homeowner's Guide ('Generally plans are not required for minor plumbing, electrical or mechanical work') — this file conservatively cites the Town's own stated maximum rather than assuming same-day issuance, since no separate written same-day commitment was found.
  • Solar PV Systems have their own dedicated $200 fee line, separate from the general $50 electrical-mechanical-plumbing fee.

Frequently asked questions

Taylor requires an electrical / mechanical / plumbing (trade) permit for: Permit required to install or alter any permanent wiring or electrical device (homeowners may replace existing devices without a permit); Permit required for water heater replacement, altered piping within walls/ceilings/floors, and new plumbing installations (ordinary minor repairs to accessible fixtures do not require a permit); Permit required for heating, cooling, and ventilation system work, including wood stoves, bath vents, and gas piping (including gas line sizing per the Town's published Natural Gas Line Sizer worksheet); Governed by the 2014 NEC, 2015 IMC, 2015 IPC, and 2015 IFGC as adopted by the Town of Taylor; Town's Building Permit Application supports 'ELECTRICAL', 'PLUMBING', 'MECHANICAL' as separate checkboxes, or 'M.P.E. COMBO' for combined trade work; Generator installations require compliance with the Town's published Generator Use & Safety guidance. If your project isn't listed, confirm with Town of Taylor Building / Zoning Department (Development Services Department) at 928-536-7366 before starting work.

A flat $50 fee covers the combined Electrical-Mechanical-Plumbing trade permit category, per the Town of Taylor Fee Schedule effective April 5, 2025. Solar PV systems have their own separate $200 fee.

Taylor's published plan-review target for an electrical / mechanical / plumbing (trade) permit is 10–10 business days.

You'll need: Building Permit Application. Depending on your project, Taylor may also ask for: APS Overhead Service / APS Underground Service Requirements; Natural Gas Line Sizer Worksheet. See the required-documents checklist on this page for details on each.

Taylor requires 3 inspection(s) for an electrical / mechanical / plumbing (trade) permit, in order: Rough-In, Service/Meter (electrical only), Final. Schedule each through Town of Taylor Building / Zoning Department (Development Services Department) (928-536-7366).

Apply through Town of Taylor Building / Zoning Department (Development Services Department) at Taylor Town Hall, 425 Papermill Road (P.O. Box 158), Taylor, AZ 85939. Phone: 928-536-7366, email: geri@tayloraz.gov. Office hours: Town Hall is currently open Monday - Thursday, 7:30 a.m. - 5:30 p.m. (closed Fridays and all major holidays), per the Town's current live website. An older (2014) Town of Taylor 'Homeowner's Guide to Permits' handout lists Development Services Department hours as Monday - Friday, 8:30 a.m. - 5:00 p.m.; the Town Hall-wide 4-day/10-hour schedule on the current tayloraz.gov site is treated as the more current figure for permit-counter purposes. The single Building Official/Zoning Administrator position (reporting directly to the Town Manager as part of the executive leadership team, per the Town's 2024 AZBO job posting) administers both building permits and zoning/planning for the Town.. Official information: https://www.tayloraz.gov/departments/building/.

Taylor, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/town authority under state enabling statutes (A.R.S. Title 9). The Town of Taylor independently adopts and administers its own construction codes through its own Building/Zoning Department (Development Services Department) at Taylor Town Hall; it does not defer building permitting to Navajo County. Verified independence: Taylor maintains its own Municipal Code Chapter 15.05 (Building and Construction Codes), its own Fee Schedule (effective April 5, 2025), its own Building Permit Application, and a dedicated Building Official/Zoning Administrator position reporting to the Town Manager. The Town shares only Fire/EMS (Taylor-Snowflake Fire) and Police (Snowflake-Taylor Police Department) with the adjacent Town of Snowflake — building/zoning permitting is NOT a shared program between the two towns. Source: Town of Taylor Municipal Code § 15.05 (codepublishing.com/AZ/Taylor/html/Taylor15/Taylor1505.html); tayloraz.gov Building Department and Permits pages; Town of Taylor Fee Schedule effective 4/5/2025; Town of Taylor Building Official/Zoning Administrator job posting (AZBO, 2024).; 2015 International Building Code (IBC), published by the International Code Council, adopted by reference with Appendices C and I, as amended by the Town of Taylor (Taylor Municipal Code § 15.05). Source: Town of Taylor Municipal Code § 15.05.040 (codepublishing.com/AZ/Taylor/html/Taylor15/Taylor1505.html).; 2015 International Residential Code (IRC) for One- and Two-Family Dwellings, adopted by reference with Appendices A, B, H, M, N, R, and S, as amended by the Town of Taylor. Source: Town of Taylor Municipal Code § 15.05.; 2015 International Plumbing Code (IPC), adopted by reference, as amended by the Town of Taylor. Source: Town of Taylor Municipal Code § 15.05.; 2015 International Mechanical Code (IMC), adopted by reference, as amended by the Town of Taylor. Source: Town of Taylor Municipal Code § 15.05.; 2015 International Fuel Gas Code (IFGC), adopted by reference with Appendices A, B, and C, as amended by the Town of Taylor. Source: Town of Taylor Municipal Code § 15.05.; 2009 International Energy Conservation Code (IECC) — notably one code family behind the Town's otherwise-2015 ICC set. Source: Town of Taylor Municipal Code § 15.05.; 2015 International Existing Building Code (IEBC), adopted by reference, as amended by the Town of Taylor. Source: Town of Taylor Municipal Code § 15.05.; 2015 International Fire Code (IFC), adopted by reference as the Town's uniform fire code, as amended by the Town of Taylor. Source: Town of Taylor Municipal Code § 15.05.; 2014 National Electrical Code (NEC/NFPA 70), published by the National Fire Protection Association, adopted by reference, as amended by the Town of Taylor — one edition behind the otherwise-2015 ICC family set (the same one-cycle-behind pattern seen in other Navajo County towns, e.g. Show Low's 2017 NEC alongside 2018 ICC codes). Source: Town of Taylor Municipal Code § 15.05.; Residential fire sprinklers: IRC Section R313 is deleted in its entirety and replaced with a cross-reference directing compliance to Arizona Revised Statute § 9-807 (the state statute governing municipal authority to require or not require residential fire sprinklers) rather than the model code's own prescriptive sprinkler trigger. Source: Town of Taylor Municipal Code § 15.05 (IRC Chapter 3 amendment).; Manufactured homes, mobile homes, and factory-built buildings: construction/installation standards are regulated directly by the State of Arizona (Arizona Department of Housing, Office of Manufactured Housing (OMH); A.R.S. § 41-4001 et seq.). The Town of Taylor's own Building/Zoning Department governs on-site placement, foundation/tie-down, and zoning compliance, and imposes its own additional zoning-based requirements (see localAmendments). As of the Town's published guidance, Arizona no longer allows Owner-Builder permits for manufactured home installation — a licensed installer must apply for the permit. Source: Town of Taylor 'Manufactured Homes Requirements in Taylor AZ' handout (Taylor Building/Zoning Department); A.R.S. § 41-4001 et seq.. Local amendments apply — see the Taylor overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Taylor building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.