Electrical, Mechanical, and Plumbing Permit in Unincorporated Daggett County, Utah

Required for electrical, mechanical, or plumbing work in unincorporated Daggett County, for residential, commercial, or agricultural improvements, issued via a single combined application form. EV charger/EVSE installation is electrical work and falls under this general combined permit; the county publishes no EV-specific application, fee, or process, and no separate fee schedule for this permit is published at all.

Verified 2026-07-23 · Source

When you need this permit

  • Electrical work (new service, rewiring, panel work)
  • Mechanical work (HVAC, furnace, ductwork)
  • Plumbing work (fixtures, water/gas lines)
  • Residential work may be self-performed by the owner ('SELF (IF RESIDENTIAL)' option on application); commercial/agricultural work requires a licensed contractor Contractor

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Application DepositConfirmed by direct PDF text extraction of the application (re-fetched and independently re-verified 2026-07-23 — genuine embedded text layer, not a scanned form). County Code § 8-3-4.M ('Fees: Any fee charged for the issuance of building permits shall be based upon the current International Building Code as recommended therein'), fetched LIVE 2026-07-23 from codelibrary.amlegal.com (HTTP 200, not Wayback-only), is the governing legal provision — it confirms Daggett County's building-permit fee mechanism is legally pegged to IBC valuation tables rather than an independently published flat dollar figure, the same treatment already used for the residential and commercial building permit 'Final Permit Fee' lines elsewhere in this dataset. Verified-negative: no separate, county-published electrical/mechanical/plumbing fee schedule exists; contact Planning & Zoning (435-784-3218 ext. 230) for a project-specific quote.
Required, but no dollar figure published — the county's own Electrical, Mechanical and Plumbing Building Permit Application states only 'Deposit amount paid at the time of application is nonrefundable but will be credited towards the final [cost]', with no number filled in or printed anywhere on the form
State SurchargeConsistent with the surcharge stated on the county's residential permit packet and applied county-wide to every other Daggett County permit type in this dataset; not separately restated on the electrical/mechanical/plumbing application but no evidence it differs.
1% of permit fee

Review timeline

Plan reviewTypical estimate — confirm current times with the Unincorporated Daggett County building department
~17–17 business days

How long did your Electrical, Mechanical, and Plumbing Permit permit actually take in Unincorporated Daggett County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Before covering or concealment

  2. 2

    Final

    After work complete, before use/occupancy

See the full Unincorporated Daggett County inspection guide — scheduling & re-inspection fees →

Tips

  • This permit covers electrical, mechanical, and plumbing work under one combined county application — check the applicable box(es) for the type(s) of work being done.
  • Homeowners may self-perform electrical/mechanical/plumbing work on their own residence but must still list themselves as 'SELF' and pass inspection. Owner-builder
  • A home EV charger install (new circuit) is covered under this combined Electrical, Mechanical, and Plumbing Permit — check the 'Electrical' box on the application. The county does not publish a distinct EV-charger permit or fee.
  • Solar panel (PV) installations are not listed among the roughly 20 permit application forms on the county's Applications page (re-checked 2026-07-19) — the electrical interconnection scope falls under this combined Electrical, Mechanical, and Plumbing Permit (check the 'Electrical' box), while any new roof or ground-mount racking structure would separately fall under the Residential Building Permit or the Accessory/Outbuilding Building Permit, depending on scope and whether the mount exceeds 200 sq ft. Daggett County publishes no distinct solar permit application, checklist, or fee line item; confirm the exact permit path with Planning & Zoning, 435-784-3218 ext. 230, before applying.

Frequently asked questions

Unincorporated Daggett County requires an electrical, mechanical, and plumbing permit for: Electrical work (new service, rewiring, panel work); Mechanical work (HVAC, furnace, ductwork); Plumbing work (fixtures, water/gas lines); Residential work may be self-performed by the owner ('SELF (IF RESIDENTIAL)' option on application); commercial/agricultural work requires a licensed contractor. If your project isn't listed, confirm with Daggett County Planning & Zoning / Building Department at 435-784-3218 ext. 230 (Planning & Zoning — Carrie Poulsen); 435-784-3222 ext. 230 (alternate listing); Building Inspector Matt Tate: 435-219-7545 / 435-247-2799 before starting work.

In Unincorporated Daggett County, the published Application Deposit is: Required, but no dollar figure published — the county's own Electrical, Mechanical and Plumbing Building Permit Application states only 'Deposit amount paid at the time of application is nonrefundable but will be credited towards the final [cost]', with no number filled in or printed anywhere on the form. Additional published fees: State Surcharge — 1% of permit fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for an electrical, mechanical, and plumbing permit in Unincorporated Daggett County typically runs 17–17 business days. This is an estimate, not a published figure — confirm current review times with Daggett County Planning & Zoning / Building Department at 435-784-3218 ext. 230 (Planning & Zoning — Carrie Poulsen); 435-784-3222 ext. 230 (alternate listing); Building Inspector Matt Tate: 435-219-7545 / 435-247-2799.

You'll need: Electrical, Mechanical and Plumbing Building Permit Application. Depending on your project, Unincorporated Daggett County may also ask for: Owner/Builder Certification and Agreement to Comply with Construction Trades Licensing Act. See the required-documents checklist on this page for details on each.

Unincorporated Daggett County requires 2 inspection(s) for an electrical, mechanical, and plumbing permit, in order: Rough-In, Final. Schedule each through Daggett County Planning & Zoning / Building Department (435-784-3218 ext. 230 (Planning & Zoning — Carrie Poulsen); 435-784-3222 ext. 230 (alternate listing); Building Inspector Matt Tate: 435-219-7545 / 435-247-2799).

Apply through Daggett County Planning & Zoning / Building Department at Daggett County Courthouse, 95 North 100 West (also listed as 95 North 1st West), P.O. Box 219, Manila, UT 84046. Phone: 435-784-3218 ext. 230 (Planning & Zoning — Carrie Poulsen); 435-784-3222 ext. 230 (alternate listing); Building Inspector Matt Tate: 435-219-7545 / 435-247-2799, email: cpoulsen@daggettcounty.gov. Office hours: Monday–Wednesday, 9:00 AM–1:00 PM and 1:00 PM–5:00 PM (closed holidays), per Daggett County Planning and Zoning page. Official information: https://www.daggettcounty.gov/496/Applications.

Unincorporated Daggett County, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — legally controlling in unincorporated Daggett County per Utah Code § 15A-2-103(1)(a), in force statewide since July 1, 2026 and binding on counties per § 15A-1-204. HISTORY / COUNTY LAG: Daggett County's own Commercial Building Permit plans checklist still expressly cites the long-superseded 2015 IBC by section ('Type of construction (required) IBC 2015 Chapter 6', 'Occupancy type (required) IBC 2015 Chapter 3', 'Occupant load (required) IBC 2015 Section 1004') — re-confirmed by direct PDF fetch 2026-07-16; see NOTE below.; 2021 International Residential Code (IRC), including Appendix AQ — legally controlling in unincorporated Daggett County per Utah Code § 15A-2-103(1)(b) and (1)(c); the IRC edition was NOT changed by the July 1, 2026 statewide amendment and remains the 2021 edition. HISTORY / COUNTY LAG: Daggett County's own Residential Building Permit packet still expressly cites the long-superseded 2015 IRC ('SECTION R109 OF THE 2015 INTERNATIONAL RESIDENTIAL CODE REQUIRES THAT YOU HAVE INSPECTION DURING CONSTRUCTION', with the full R109.1 series inspection text reproduced in the county's own packet) — see NOTE below.; NOTE: Utah Code § 15A-2-103 sets the statewide-adopted baseline: the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, and IEBC, plus the residential provisions of the 2024 ISPSC, are all currently in force statewide (effective July 1, 2026), alongside the 2021 IRC (unchanged) and 2023 NEC (unchanged). This statewide baseline binds counties as well as municipalities per § 15A-1-204. Daggett County's own public-facing permit packets (residential packet, commercial packet) still explicitly cite the 2015 IBC/IRC by section number — confirmed still true on re-check of the county's Commercial Building Permit Plans Checklist PDF on 2026-07-16, which additionally cites '2015 IMC' for mechanical design (IMC § 312) and duct sizing (IMC § 603), a pre-existing lag not previously captured here. This is analogous to other small Utah counties in this corpus (e.g., Cache, Rich) whose public materials lag the statewide-adopted edition. The statewide-adopted edition per § 15A-2-103 is the legally controlling one; Daggett County's own documentation has not been updated to reflect it.; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); statewide in force (Daggett County's own permit forms do not name a specific NEC edition). Local amendments apply — see the Unincorporated Daggett County overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Daggett County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.