Demolition Permit in Unincorporated Daggett County, Utah

Required for demolition of any structure in unincorporated Daggett County. Requires sign-off from utility providers, Tri County Health, and fire department, plus State of Utah Division of Air Quality asbestos notification if performed by a hired contractor.

Verified 2026-07-23 · Source

When you need this permit

  • Complete or partial demolition of any structure
  • Utility disconnect confirmation from electric provider (Bridger Valley Electric or Moon Lake Electric), Town of Manila Water/Sewer, Manila/Dutch John Fire Dept, propane company, and Tri County Health
  • Asbestos inspection required if demolition is performed by a hired contractor (private homeowners performing their own demolition are exempt under Utah House Bill 285, but are still regulated by the county for asbestos determination)
  • Two-week advance notification to the Utah DEQ Division of Air Quality is required regardless of asbestos findings
  • Road Department and Sheriff's Office approval required if any public road will be blocked

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Application Fee / DepositCounty Code § 8-3-4.A explicitly includes demolition within the general building-permit statute, and § 8-3-4.M ('Any fee charged for the issuance of building permits shall be based upon the current International Building Code as recommended therein'), live-fetched 2026-07-23 from codelibrary.amlegal.com (HTTP 200, not Wayback-only), establishes that any fee that IS charged for a Daggett County building permit is IBC-valuation-based rather than a flat county figure — but the demolition application itself requests no deposit at filing, a genuine distinction from the county's other permit forms. Verified-negative: no published demolition-specific fee or deposit requirement exists in the county's own application materials; confirm with Planning & Zoning (435-784-3218 ext. 230) whether any fee is assessed administratively at permit issuance.
None found — the Demolition Permit Application (direct PDF text extraction, re-fetched and confirmed 2026-07-23) contains no fee or deposit clause anywhere on the form, unlike every other Daggett County permit application in this dataset (residential, commercial, electrical/mechanical/plumbing, roofing/siding/window/deck, accessory), all of which state a deposit is required even where the dollar amount itself is left blank

Review timeline

Plan reviewTypical estimate — confirm current times with the Unincorporated Daggett County building department
~17–17 business days

How long did your Demolition Permit permit actually take in Unincorporated Daggett County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Pre-Demolition

    Confirm utility disconnects and asbestos clearance

  2. 2

    Final

    Site cleared, foundation/debris removed, basement/crawl space filled with off-site material, scheduled with the Building Department

See the full Unincorporated Daggett County inspection guide — scheduling & re-inspection fees →

Tips

  • Six separate sign-offs are required on the demolition application: Bridger Valley Electric or Moon Lake Electric, Town of Manila Water/Sewer, Manila/Dutch John Fire Dept, propane company (if applicable), and Tri County Health.
  • Contact Blue Stakes (1-800-662-4111) before any excavation, and the Road Department (435-784-3208) and Sheriff's Office (435-784-3255) before blocking any public road.
  • This permit shall become invalid unless work is commenced within 180 days of issuance or is suspended/abandoned for 180 days after commencing, the same expiration rule as other Daggett County permits.

Frequently asked questions

Yes. The Demolition Permit Application requires utility disconnect sign-offs, a Tri County Health sign-off, and — if a hired contractor performs the work — an asbestos inspection plus notification to the Utah DEQ Division of Air Quality at least two weeks before demolition.

In Unincorporated Daggett County, the published Application Fee / Deposit is: None found — the Demolition Permit Application (direct PDF text extraction, re-fetched and confirmed 2026-07-23) contains no fee or deposit clause anywhere on the form, unlike every other Daggett County permit application in this dataset (residential, commercial, electrical/mechanical/plumbing, roofing/siding/window/deck, accessory), all of which state a deposit is required even where the dollar amount itself is left blank. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for a demolition permit in Unincorporated Daggett County typically runs 17–17 business days. This is an estimate, not a published figure — confirm current review times with Daggett County Planning & Zoning / Building Department at 435-784-3218 ext. 230 (Planning & Zoning — Carrie Poulsen); 435-784-3222 ext. 230 (alternate listing); Building Inspector Matt Tate: 435-219-7545 / 435-247-2799.

You'll need: Demolition Permit Application; State Air Quality Demolition Notification. Depending on your project, Unincorporated Daggett County may also ask for: Asbestos Inspection. See the required-documents checklist on this page for details on each.

Unincorporated Daggett County requires 2 inspection(s) for a demolition permit, in order: Pre-Demolition, Final. Schedule each through Daggett County Planning & Zoning / Building Department (435-784-3218 ext. 230 (Planning & Zoning — Carrie Poulsen); 435-784-3222 ext. 230 (alternate listing); Building Inspector Matt Tate: 435-219-7545 / 435-247-2799).

Apply through Daggett County Planning & Zoning / Building Department at Daggett County Courthouse, 95 North 100 West (also listed as 95 North 1st West), P.O. Box 219, Manila, UT 84046. Phone: 435-784-3218 ext. 230 (Planning & Zoning — Carrie Poulsen); 435-784-3222 ext. 230 (alternate listing); Building Inspector Matt Tate: 435-219-7545 / 435-247-2799, email: cpoulsen@daggettcounty.gov. Office hours: Monday–Wednesday, 9:00 AM–1:00 PM and 1:00 PM–5:00 PM (closed holidays), per Daggett County Planning and Zoning page. Official information: https://www.daggettcounty.gov/496/Applications.

Unincorporated Daggett County, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — legally controlling in unincorporated Daggett County per Utah Code § 15A-2-103(1)(a), in force statewide since July 1, 2026 and binding on counties per § 15A-1-204. HISTORY / COUNTY LAG: Daggett County's own Commercial Building Permit plans checklist still expressly cites the long-superseded 2015 IBC by section ('Type of construction (required) IBC 2015 Chapter 6', 'Occupancy type (required) IBC 2015 Chapter 3', 'Occupant load (required) IBC 2015 Section 1004') — re-confirmed by direct PDF fetch 2026-07-16; see NOTE below.; 2021 International Residential Code (IRC), including Appendix AQ — legally controlling in unincorporated Daggett County per Utah Code § 15A-2-103(1)(b) and (1)(c); the IRC edition was NOT changed by the July 1, 2026 statewide amendment and remains the 2021 edition. HISTORY / COUNTY LAG: Daggett County's own Residential Building Permit packet still expressly cites the long-superseded 2015 IRC ('SECTION R109 OF THE 2015 INTERNATIONAL RESIDENTIAL CODE REQUIRES THAT YOU HAVE INSPECTION DURING CONSTRUCTION', with the full R109.1 series inspection text reproduced in the county's own packet) — see NOTE below.; NOTE: Utah Code § 15A-2-103 sets the statewide-adopted baseline: the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, and IEBC, plus the residential provisions of the 2024 ISPSC, are all currently in force statewide (effective July 1, 2026), alongside the 2021 IRC (unchanged) and 2023 NEC (unchanged). This statewide baseline binds counties as well as municipalities per § 15A-1-204. Daggett County's own public-facing permit packets (residential packet, commercial packet) still explicitly cite the 2015 IBC/IRC by section number — confirmed still true on re-check of the county's Commercial Building Permit Plans Checklist PDF on 2026-07-16, which additionally cites '2015 IMC' for mechanical design (IMC § 312) and duct sizing (IMC § 603), a pre-existing lag not previously captured here. This is analogous to other small Utah counties in this corpus (e.g., Cache, Rich) whose public materials lag the statewide-adopted edition. The statewide-adopted edition per § 15A-2-103 is the legally controlling one; Daggett County's own documentation has not been updated to reflect it.; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); statewide in force (Daggett County's own permit forms do not name a specific NEC edition). Local amendments apply — see the Unincorporated Daggett County overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Daggett County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.