Unincorporated Daggett County building inspections

Inspection sequence, scheduling, and re-inspection fees for building permits in Unincorporated Daggett County, Utah.

Reviewed 2026-07-08 · Source

How to schedule

Inspections are requested through the building department below.

Address
Daggett County Courthouse, 95 North 100 West (also listed as 95 North 1st West), P.O. Box 219, Manila, UT 84046
Phone
435-784-3218 ext. 230 (Planning & Zoning — Carrie Poulsen); 435-784-3222 ext. 230 (alternate listing); Building Inspector Matt Tate: 435-219-7545 / 435-247-2799
Office hours
Monday–Wednesday, 9:00 AM–1:00 PM and 1:00 PM–5:00 PM (closed holidays), per Daggett County Planning and Zoning page

Published scheduling rules

  • Contact the Building Inspector (Matt Tate, 435-219-7545 or 435-247-2799) directly to schedule inspections — at least 24 hours notice is required, and it is the permit holder's responsibility to schedule all necessary inspections. (Residential Building Permit)

Inspection sequence

Applies to: Commercial Building Permit

  1. 1

    Foundation

    Before concrete placement — footings, forms, reinforcing steel

  2. 2

    Rough-In (MEP)

    Plumbing, mechanical, and electrical rough-in before concealment

  3. 3

    Framing

    After framing and fire-resistance-rated construction elements are in place

  4. 4

    Final

    After all permitted work is complete, prior to occupancy/Certificate of Occupancy

Applies to: Commercial Tenant Improvement / Tenant Finish Permit

  1. 1

    Foundation

    Before concrete placement — footings, forms, reinforcing steel (if the tenant-finish scope includes any foundation/slab work)

  2. 2

    Rough-In (MEP)

    Plumbing, mechanical, and electrical rough-in before concealment

  3. 3

    Framing

    After framing and fire-resistance-rated construction elements are in place

  4. 4

    Final

    After all permitted work is complete, prior to occupancy/Certificate of Occupancy

Applies to: Residential Building Permit

  1. 1

    Foundation

    After piers/poles set or trenches/basement areas excavated, forms erected, and reinforcing steel placed and supported — prior to placing concrete (2015 IRC R109.1.1, reproduced in county packet)

  2. 2

    Plumbing, Mechanical, Gas, and Electrical Rough-In

    Prior to covering/concealment, before fixtures or appliances are set, and prior to framing inspection (2015 IRC R109.1.2)

  3. 3

    Frame and Masonry

    After roof, masonry, framing, fire stopping, draft stopping, and bracing are in place, and after plumbing/mechanical/electrical rough inspections are approved (2015 IRC R109.1.4)

  4. 4

    Final

    After all permitted work is complete and prior to occupancy (2015 IRC R109.1.6)

Applies to: Accessory / Outbuilding Building Permit

  1. 1

    Foundation

    Before concrete pour, if applicable

  2. 2

    Framing

    Structure and MEP rough-in, if applicable

  3. 3

    Final

    Completed structure

Applies to: Solar / Solar PV Permit

  1. 1

    Foundation/Footings (ground-mount only)

    Before concrete pour, if the ground-mount array requires footings — applicable only when an Accessory/Outbuilding Building Permit is required

  2. 2

    Electrical Rough-In

    PV circuit, inverter, and interconnection wiring inspected before covering or concealment

  3. 3

    Final

    After work complete, before use/interconnection is energized

Applies to: Demolition Permit

  1. 1

    Pre-Demolition

    Confirm utility disconnects and asbestos clearance

  2. 2

    Final

    Site cleared, foundation/debris removed, basement/crawl space filled with off-site material, scheduled with the Building Department

Applies to: Electrical, Mechanical, and Plumbing Permit

  1. 1

    Rough-In

    Before covering or concealment

  2. 2

    Final

    After work complete, before use/occupancy

Applies to: EV Charger / EVSE Permit

  1. 1

    Rough-In

    Before covering or concealment.

  2. 2

    Final

    After work complete, before use/occupancy.

Applies to: Fire Sprinkler / Fire Alarm Permit

  1. 1

    Fire Chief Plan Review

    County Fire Chief reviews and stamps the fire-separation/fire-resistant construction detail and smoke detector/fire alarm plan pages before the Building Official will issue the Commercial Building Permit.

  2. 2

    Final Fire/Life-Safety Inspection

    Verified as part of the Commercial Building Permit's Final inspection, after all permitted work is complete and prior to Certificate of Occupancy.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Daggett County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Unincorporated Daggett County building permits

Get alerts for Unincorporated Daggett County

We'll email you when Unincorporated Daggett County's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.