Electrical, Mechanical & Plumbing Permit in Holladay, Utah
Covers standalone or combined electrical, mechanical, and plumbing work in Holladay. The city's official Building Permit application form lists these as separate itemized fee lines assessed alongside the Building B.O.V. Fee, but no public flat-dollar or percentage figure is published for these trade fees. EV charger/EVSE installation is electrical work and falls under this general Electrical fee line; the city has not published a distinct EV-specific permit, fee, or process. Rooftop solar panel installation is likewise not a distinct permit type in Holladay: the city's official Building FAQs page lists 'Electrical (service upgrade, meter change, new branch circuits, backup power; generator, solar, all new exterior lighting etc.)' and, separately, 'Alternative energy/heating (Solar panels, battery backup, ground source heat/cooling, etc.)' among the work categories requiring a permit, with no separate solar fee line or process published anywhere on the Building Division, FAQs, or Construction Submittal Requirements pages — solar installs are budgeted using the same Electrical Fee line as other electrical work.
Verified 2026-07-19 · Source
When you need this permit
- Electrical, mechanical, or plumbing work regulated statewide by the 2024 IPC / 2024 IMC / 2024 IFGC (Utah Code § 15A-2-103(1)(d)/(e)/(f), effective 7/1/2026) and the 2023 NEC (§ 15A-2-103(1)(g), unchanged); Holladay's own Inspection Guidelines & Codes page still lists the 2021 IPC/IMC/IFGC and 2020 NEC as of live-check 2026-07-16, but the statute controls
- Online application via the city's iWorq Building Permit Application portal
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Subrough Plumbing / Electrical / Mechanical / Radiant
Combined subrough trade inspection line, per the city's official Inspection Checklist. Requested online at holladay.portal.iworq.net/HOLLADAY/permits/600, 24 hours in advance prior to 4:00 pm.
- 2
Final
Final inspection, per the official Inspection Checklist.
See the full Holladay inspection guide — scheduling & re-inspection fees →
Tips
- No public flat-dollar fee table exists for standalone electrical/mechanical/plumbing permits in Holladay (unlike Murray's published flat $100 fees for each trade) — call the Building Division (801-527-3890) for a project-specific quote.
- The city's Inspection Guidelines & Codes page notes: tinted primer is required on all HVAC PVC joints — a specific local inspection requirement shared with neighboring Cottonwood Heights.
- Installing a home EV charger (Level 2 / 240V) is treated as standard electrical work under this permit — Holladay has not published a distinct EV-charger fee line or checklist, so budget for a project-specific quote from the Building Division as with any other electrical work.
- Rooftop solar panel installation is treated as standard electrical/alternative-energy work under this permit — Holladay's official Building FAQs page lists both 'Electrical (... generator, solar, ...)' and 'Alternative energy/heating (Solar panels, battery backup, ...)' among the categories of work requiring a permit, but publishes no distinct solar fee line or checklist. Budget for a project-specific quote from the Building Division, as with any other electrical work.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Holladay building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Holladay
Electrical, Mechanical & Plumbing Permit in other cities
Compare electrical, mechanical & plumbing permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Holladay project checklist
Describe your project once and get every permit, document, and fee it triggers in Holladay — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →