Solar PV / Solar Panel Installation Permit in Holladay, Utah
Holladay does not publish a distinct solar/solar-PV permit, application, checklist, or fee. The city's official Building FAQs page lists 'Alternative energy/heating (Solar panels, battery backup, ground source heat/cooling, etc.)' as its own itemized category under 'What Work Requires A Permit?', confirming a permit is required for solar installations, but the Building Division's Construction Submittal Requirements page publishes no solar-specific plan-submittal category or checklist PDF (only residential single-family, supplemental residential, and commercial/multi-family categories are listed), and neither the Consolidated Fee Schedule ordinance nor the Building Permit application form itemize a solar-specific fee line. As with EV chargers, a solar installation is instead billed using the general fee architecture already on the office-use fee breakdown: the Building Permit Fee (Based on Valuation, for any structural roof-mounting/racking work) and/or the Electrical Fee (for PV wiring and grid interconnection), per project. No evidence was found that Holladay participates in SolarAPP+ (the national automated instant-permitting platform for residential solar) — SolarAPP+'s own public materials list no Utah jurisdictions as participants as of this verification.
Verified 2026-07-21 · Source
When you need this permit
- Installation of a rooftop or ground-mounted solar photovoltaic (PV) system, or a battery backup / alternative-energy system, at a residential or commercial property — listed as its own 'Alternative energy/heating' category requiring a permit on the city's official Building FAQs page
- Online application via the city's iWorq Building Permit Application portal (holladay.portal.iworq.net) — the city does not accept applications without accompanying plans
- Work regulated by the current statewide-adopted codes (2024 IBC/IRC structural and electrical provisions, 2023 NEC) per Utah Code § 15A-2-103; Holladay's own Inspection Guidelines & Codes page has not been updated to the 2024/2023 editions as of live-check 2026-07-16, but the statute controls
- Roof-mounted systems: per the city's official Building FAQs page design-criteria note, 'At locations where roof snow load exceeds 30psf include 20% of the roof snow load in the effective seismic weight of the structure' — relevant to structural review of rooftop-mounted panel arrays
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Power to Panel (Clearance)
Electrical service/interconnection clearance inspection, per the city's official Inspection Checklist (published for residential permits; no separate solar-specific inspection sequence is published).
- 2
Final
Final inspection, requested online at holladay.portal.iworq.net/HOLLADAY/permits/600, 24 hours in advance prior to 4:00 pm; a contractor access code is required.
See the full Holladay inspection guide — scheduling & re-inspection fees →
Tips
- Holladay has not published a distinct solar/solar-PV permit application, checklist, or fee — confirmed by checking the Building Division page, Building FAQs page, Construction Submittal Requirements page, the Building Permit application form, and the Consolidated Fee Schedule PDF. 'Alternative energy/heating (Solar panels...)' is listed only as a category requiring a permit, not as a separate process.
- Budget for both a Building B.O.V. fee component (for any roof-mounting/structural work) and an Electrical fee component (for PV wiring/interconnection) — call the Building Division (801-527-3890) for a project-specific quote, since no flat-dollar figure is published for either.
- No evidence was found that Holladay participates in SolarAPP+, the national automated instant-permitting platform for residential solar — SolarAPP+'s own public jurisdiction materials list no Utah jurisdictions as of this verification, so solar permits go through the same iWorq portal and manual review as any other building/electrical permit.
- Roof-mounted arrays trigger the same site-specific structural design factors as any other roof work in Holladay (Seismic Design Category D-2; snow load 30-40 psf base, 43-57 psf for drifting) — the city's FAQs page specifically flags adding 20% of roof snow load to the effective seismic weight where snow load exceeds 30 psf.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-21.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Holladay building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Holladay
Solar PV / Solar Panel Installation Permit in other cities
Compare solar pv / solar panel installation permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Holladay project checklist
Describe your project once and get every permit, document, and fee it triggers in Holladay — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →