Sign Permit — Holladay, Utah · Requirements sheet
Verified 2026-07-21 · Source: https://www.holladayut.gov/departments/community_development/building_division/faqs.php
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Sign Permit in Holladay, Utah
Holladay does not publish a distinct sign permit application, checklist, or fee. The city's official Building FAQs page lists 'Signs (wall, monument, pole and billboard)' as its own itemized category under 'What Work Requires A Permit?', confirming a permit is required, but the Building Division's Construction Submittal Requirements page publishes no sign-specific plan-submittal category (only residential single-family, supplemental residential, and commercial/multi-family categories are listed), and neither the Consolidated Fee Schedule ordinance nor the Building Permit application form itemize a sign-specific fee line. Sign design, placement, size, and quantity standards are separately governed by Holladay City Code Chapter 13.82 (Signs), referenced via the city's official code index at codelibrary.amlegal.com/codes/holladayut — full ordinance text could not be rendered directly (codelibrary.amlegal.com returned HTTP 403 to automated fetch, consistent with the same block already noted for § 13.08.100 elsewhere in this file), so only the chapter's existence and title are asserted here, not its full text. Sign work is instead billed using the same general fee architecture already on the office-use fee breakdown: the Building Permit Fee (Based on Valuation, per the 1997 Uniform Administrative Code Table 3-A) for structural sign work (e.g., monument/pole sign foundations), and/or the Electrical Fee for illuminated signs, per project.
Verified 2026-07-21 · Source
When you need this permit
- Erection or installation of a wall, monument, pole, or billboard sign — listed as its own 'Signs (wall, monument, pole and billboard)' category requiring a permit on the city's official Building FAQs page
- Online application via the city's iWorq Building Permit Application portal (holladay.portal.iworq.net) — the city does not accept applications without accompanying plans
- Design, placement, size, and quantity of the sign must conform to Holladay City Code Chapter 13.82 (Signs), referenced by the city's official AmLegal code index (full text not independently verified here due to a 403 response from automated fetch)
- Illuminated or electrically-connected signs are also subject to the general electrical permit/inspection requirements applicable to any electrical work in the city
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final
Final inspection, per the city's official Inspection Checklist (published for residential/commercial building permits generally; no separate sign-specific inspection sequence is published). Requested online at holladay.portal.iworq.net/HOLLADAY/permits/600, 24 hours in advance prior to 4:00 pm; a contractor access code is required.
See the full Holladay inspection guide — scheduling & re-inspection fees →
Tips
- Holladay has not published a distinct sign permit application, checklist, or fee — confirmed by checking the Building Division page, Building FAQs page, Construction Submittal Requirements page, the Building Permit application form, and the Consolidated Fee Schedule PDF. 'Signs (wall, monument, pole and billboard)' is listed only as a category requiring a permit, not as a separate process.
- Sign design, placement, size, and quantity standards are set by Holladay City Code Chapter 13.82 (Signs) — the ordinance's full text could not be independently retrieved here (codelibrary.amlegal.com returned HTTP 403 to automated fetch); confirm current sign standards directly with the Building Division (801-527-3890) or Planning Division (801-527-3890 / planning@holladayut.gov) before submitting.
- Budget for a Building B.O.V. fee component (for any structural sign-mounting work) and, for illuminated signs, an Electrical fee component — call the Building Division (801-527-3890) for a project-specific quote, since no flat-dollar figure is published for either.
- Apply through the same iWorq portal (holladay.portal.iworq.net) used for building, electrical, and other permit types — there is no separate sign-permit portal or form.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-21.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Holladay building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Holladay
Sign Permit in other cities
Compare sign permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Holladay project checklist
Describe your project once and get every permit, document, and fee it triggers in Holladay — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →