Electrical / Mechanical / Plumbing / Stucco Permit in Unincorporated Millard County, Utah

Required for electrical, mechanical, plumbing, and stucco work in unincorporated Millard County, per the county's combined Electrical/Mechanical/Plumbing/Stucco permit application form. EV charger/EVSE installation is electrical work and falls under this general Electrical permit line; Millard County's permit application form does not publish a separate EV-specific fee item.

Verified 2026-07-08 · Source

When you need this permit

  • Electrical work (residential or commercial/pivot)
  • Mechanical (HVAC) installation or replacement
  • Plumbing installation or alteration
  • Stucco application (including after-the-fact stucco permits)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical Permit (Residential)Millard County Building Permit Application — Electrical/Mechanical/Plumbing/Stucco form (millardcounty.gov)
$45.00
Electrical Permit (Commercial or Pivot)Millard County Building Permit Application — Electrical/Mechanical/Plumbing/Stucco form
$75.00
Mechanical PermitMillard County Building Permit Application — Electrical/Mechanical/Plumbing/Stucco form
$45.00
Plumbing PermitMillard County Building Permit Application — Electrical/Mechanical/Plumbing/Stucco form
$45.00
Stucco PermitMillard County Building Permit Application — Electrical/Mechanical/Plumbing/Stucco form
$75.00
Stucco Permit (After the Fact)Millard County Building Permit Application — Electrical/Mechanical/Plumbing/Stucco form; charged when stucco was applied before a permit was obtained
$100.00

Review timeline

Plan reviewTypical estimate — confirm current times with the Unincorporated Millard County building department
~3–14 business days

How long did your Electrical / Mechanical / Plumbing / Stucco Permit permit actually take in Unincorporated Millard County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    After wiring, piping, or ductwork installed, before walls closed

  2. 2

    Final

    All work complete and operational

See the full Unincorporated Millard County inspection guide — scheduling & re-inspection fees →

Tips

  • A re-inspection fee may be charged if the project is not ready for inspection at the time the inspection is ordered, per the permit application form.
  • Commercial and pivot (agricultural irrigation) electrical work is charged at the higher $75 commercial rate versus $45 for standard residential electrical work.
  • Stucco applied without a permit is subject to a higher $100 after-the-fact fee versus the standard $75 stucco permit fee.
  • EV charger (EVSE) installation is treated as standard electrical work — pulled under the $45 residential (or $75 commercial/pivot) Electrical line item; Millard County does not publish a distinct EV-charger permit or fee.
  • Solar PV installation is likewise treated as standard electrical work — the Millard County combined Electrical/Mechanical/Plumbing/Stucco permit form has no distinct solar line item, so a rooftop solar install falls under the same $45 residential (or $75 commercial) Electrical Permit fee.

Frequently asked questions

Unincorporated Millard County requires an electrical / mechanical / plumbing / stucco permit for: Electrical work (residential or commercial/pivot); Mechanical (HVAC) installation or replacement; Plumbing installation or alteration; Stucco application (including after-the-fact stucco permits). If your project isn't listed, confirm with Millard County Building Department at (435) 864-1400 before starting work.

Per the Millard County combined Electrical/Mechanical/Plumbing/Stucco permit application form: Electrical is $45 residential ($75 commercial/pivot), Mechanical is $45, Plumbing is $45, and Stucco is $75 ($100 if applied without a permit first).

Plan review for an electrical / mechanical / plumbing / stucco permit in Unincorporated Millard County typically runs 3–14 business days. This is an estimate, not a published figure — confirm current review times with Millard County Building Department at (435) 864-1400.

You'll need: Millard County Building Permit Application — Electrical/Mechanical/Plumbing/Stucco. Depending on your project, Unincorporated Millard County may also ask for: Contractor License Number. See the required-documents checklist on this page for details on each.

Unincorporated Millard County requires 2 inspection(s) for an electrical / mechanical / plumbing / stucco permit, in order: Rough-In, Final. Schedule each through Millard County Building Department ((435) 864-1400).

Apply through Millard County Building Department at 71 South 200 West, PO Box 854, Delta, UT 84624. Phone: (435) 864-1400, email: buildingofficial@millardcounty.org. Office hours: Monday–Thursday 8:00 AM – 5:30 PM; Friday 8:00 AM – 12:00 PM. Official information: https://millardcounty.gov/your-government/county-departments/building-inspection/.

Unincorporated Millard County, Utah has adopted: 2021 International Residential Code (IRC) with State of Utah Amendments — per Utah Code § 15A-2-103(1)(b); unchanged by the July 1, 2026 statewide update. Millard County Building Inspection Department page (adopted codes list) also lists 2021 IRC — live-checked 2026-07-16, page unchanged since last check.; 2024 International Building Code (IBC) with State of Utah Amendments — per Utah Code § 15A-2-103(1)(a), effective since July 1, 2026, superseding the 2021 IBC. NOTE (2026-07-16, live-checked): the Millard County Building Inspection Department page still lists 2021 IBC — the county page is lagging the statewide statutory update by 15+ days; the statute is controlling.; 2024 International Plumbing Code (IPC) with State of Utah Amendments — per Utah Code § 15A-2-103(1)(d), effective since July 1, 2026, superseding the 2021 IPC. NOTE (2026-07-16, live-checked): the county page still lists 2021 IPC — page lag, statute controls.; 2024 International Mechanical Code (IMC) with State of Utah Amendments — per Utah Code § 15A-2-103(1)(e), effective since July 1, 2026, superseding the 2021 IMC. NOTE (2026-07-16, live-checked): the county page still lists 2021 IMC — page lag, statute controls.; 2023 National Electrical Code (NEC) per Utah Code § 15A-2-103(1)(g), statewide in force and NOT changed by the July 1, 2026 update — NOTE: this is a separate, pre-existing discrepancy: Millard County's own Building Inspection page lists 2020 NEC (live-checked again 2026-07-16, page still shows 2020 NEC, unrelated to the 2021→2024 code-edition transition affecting the other codes below). Contractors/homeowners should confirm current applicability with the Building Official as the county page lags the statewide amendment.; 2024 International Fuel Gas Code (IFGC) with State of Utah Amendments — per Utah Code § 15A-2-103(1)(f), effective since July 1, 2026, superseding the 2021 IFGC. NOTE (2026-07-16, live-checked): the county page still lists 2021 IFGC — page lag, statute controls.; 2024 International Energy Conservation Code (IECC), Residential & Commercial — per Utah Code § 15A-2-103(1)(h), effective since July 1, 2026, superseding the 2021 IECC. The statute adopts a single IECC edition with no residential/commercial split (this file's existing single combined line already reflects that — no split to collapse). NOTE (2026-07-16, live-checked): the county page still lists 2021 IECC — page lag, statute controls.; 2024 International Existing Building Code (IEBC) — per Utah Code § 15A-2-103(1)(i), effective since July 1, 2026. Not separately listed on the Millard County Building Inspection Department page (live-checked 2026-07-16, page has no IEBC entry at all) — added here because § 15A-2-103 adopts it statewide regardless of the county page's omission.; 2024 residential provisions of the International Swimming Pool and Spa Code (ISPSC) — per Utah Code § 15A-2-103(1)(n), effective since July 1, 2026. Not separately listed on the Millard County Building Inspection Department page (live-checked 2026-07-16, page has no ISPSC entry at all) — added here because § 15A-2-103 adopts it statewide regardless of the county page's omission.; Utah Wildland Urban Interface Code; NOTE (updated 2026-07-16): The July 1, 2026 statewide code-edition transition (2024 IBC/IPC/IMC/IFGC/IECC replacing 2021 editions, per Utah Code § 15A-2-103 version effective 7/1/2026, superseded 1/1/2027) took effect 15 days ago; the next statute version's editions were diffed and confirmed identical, so this should not go stale again around 1/1/2027. 2021 IRC is unchanged by this transition. The International Fire Code is NOT adopted by § 15A-2-103 (it is addressed separately in Title 15A Chapter 5) and is not otherwise referenced in this file..

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Millard County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.