EV Charger / EVSE Permit in Unincorporated Millard County, Utah

Millard County does not publish a distinct EV charger, EVSE, or electric vehicle charging station permit or fee. EV charger/EVSE installation is electrical work and falls under the county's combined Electrical/Mechanical/Plumbing/Stucco permit application, at the $45 residential (or $75 commercial/pivot) Electrical line item. The county's permit application form does not publish a separate EV-specific fee item.

Verified 2026-07-20 · Source

When you need this permit

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property
  • New dedicated electrical circuit and/or panel capacity to serve the charger, covered under the general Electrical line item
  • Compliance with the 2023 National Electrical Code (NEC) per Utah Code § 15A-2-103(1)(g)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical Permit (Residential)Millard County Building Permit Application — Electrical/Mechanical/Plumbing/Stucco form (millardcounty.gov). Same line item covers EV charger circuit installation; no distinct EV-specific fee is published.
$45.00
Electrical Permit (Commercial or Pivot)Millard County Building Permit Application — Electrical/Mechanical/Plumbing/Stucco form
$75.00

Review timeline

Plan reviewTypical estimate — confirm current times with the Unincorporated Millard County building department
~3–14 business days

How long did your EV Charger / EVSE Permit permit actually take in Unincorporated Millard County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    After wiring installed, before walls closed

  2. 2

    Final

    All work complete and operational

See the full Unincorporated Millard County inspection guide — scheduling & re-inspection fees →

Tips

  • Millard County does not have a separate EV-charger permit — EV charger (EVSE) installation is treated as standard electrical work, pulled under the $45 residential (or $75 commercial/pivot) Electrical line item on the county's combined Electrical/Mechanical/Plumbing/Stucco permit form.
  • A re-inspection fee may be charged if the project is not ready for inspection at the time the inspection is ordered, per the permit application form.

Frequently asked questions

Unincorporated Millard County requires an ev charger / evse permit for: Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property; New dedicated electrical circuit and/or panel capacity to serve the charger, covered under the general Electrical line item; Compliance with the 2023 National Electrical Code (NEC) per Utah Code § 15A-2-103(1)(g). If your project isn't listed, confirm with Millard County Building Department at (435) 864-1400 before starting work.

In Unincorporated Millard County, the published Electrical Permit (Residential) is: $45.00. Additional published fees: Electrical Permit (Commercial or Pivot) — $75.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for an ev charger / evse permit in Unincorporated Millard County typically runs 3–14 business days. This is an estimate, not a published figure — confirm current review times with Millard County Building Department at (435) 864-1400.

You'll need: Millard County Building Permit Application — Electrical/Mechanical/Plumbing/Stucco. Depending on your project, Unincorporated Millard County may also ask for: Contractor License Number. See the required-documents checklist on this page for details on each.

Unincorporated Millard County requires 2 inspection(s) for an ev charger / evse permit, in order: Rough-In, Final. Schedule each through Millard County Building Department ((435) 864-1400).

Apply through Millard County Building Department at 71 South 200 West, PO Box 854, Delta, UT 84624. Phone: (435) 864-1400, email: buildingofficial@millardcounty.org. Office hours: Monday–Thursday 8:00 AM – 5:30 PM; Friday 8:00 AM – 12:00 PM. Official information: https://millardcounty.gov/your-government/county-departments/building-inspection/.

Unincorporated Millard County, Utah has adopted: 2021 International Residential Code (IRC) with State of Utah Amendments — per Utah Code § 15A-2-103(1)(b); unchanged by the July 1, 2026 statewide update. Millard County Building Inspection Department page (adopted codes list) also lists 2021 IRC — live-checked 2026-07-16, page unchanged since last check.; 2024 International Building Code (IBC) with State of Utah Amendments — per Utah Code § 15A-2-103(1)(a), effective since July 1, 2026, superseding the 2021 IBC. NOTE (2026-07-16, live-checked): the Millard County Building Inspection Department page still lists 2021 IBC — the county page is lagging the statewide statutory update by 15+ days; the statute is controlling.; 2024 International Plumbing Code (IPC) with State of Utah Amendments — per Utah Code § 15A-2-103(1)(d), effective since July 1, 2026, superseding the 2021 IPC. NOTE (2026-07-16, live-checked): the county page still lists 2021 IPC — page lag, statute controls.; 2024 International Mechanical Code (IMC) with State of Utah Amendments — per Utah Code § 15A-2-103(1)(e), effective since July 1, 2026, superseding the 2021 IMC. NOTE (2026-07-16, live-checked): the county page still lists 2021 IMC — page lag, statute controls.; 2023 National Electrical Code (NEC) per Utah Code § 15A-2-103(1)(g), statewide in force and NOT changed by the July 1, 2026 update — NOTE: this is a separate, pre-existing discrepancy: Millard County's own Building Inspection page lists 2020 NEC (live-checked again 2026-07-16, page still shows 2020 NEC, unrelated to the 2021→2024 code-edition transition affecting the other codes below). Contractors/homeowners should confirm current applicability with the Building Official as the county page lags the statewide amendment.; 2024 International Fuel Gas Code (IFGC) with State of Utah Amendments — per Utah Code § 15A-2-103(1)(f), effective since July 1, 2026, superseding the 2021 IFGC. NOTE (2026-07-16, live-checked): the county page still lists 2021 IFGC — page lag, statute controls.; 2024 International Energy Conservation Code (IECC), Residential & Commercial — per Utah Code § 15A-2-103(1)(h), effective since July 1, 2026, superseding the 2021 IECC. The statute adopts a single IECC edition with no residential/commercial split (this file's existing single combined line already reflects that — no split to collapse). NOTE (2026-07-16, live-checked): the county page still lists 2021 IECC — page lag, statute controls.; 2024 International Existing Building Code (IEBC) — per Utah Code § 15A-2-103(1)(i), effective since July 1, 2026. Not separately listed on the Millard County Building Inspection Department page (live-checked 2026-07-16, page has no IEBC entry at all) — added here because § 15A-2-103 adopts it statewide regardless of the county page's omission.; 2024 residential provisions of the International Swimming Pool and Spa Code (ISPSC) — per Utah Code § 15A-2-103(1)(n), effective since July 1, 2026. Not separately listed on the Millard County Building Inspection Department page (live-checked 2026-07-16, page has no ISPSC entry at all) — added here because § 15A-2-103 adopts it statewide regardless of the county page's omission.; Utah Wildland Urban Interface Code; NOTE (updated 2026-07-16): The July 1, 2026 statewide code-edition transition (2024 IBC/IPC/IMC/IFGC/IECC replacing 2021 editions, per Utah Code § 15A-2-103 version effective 7/1/2026, superseded 1/1/2027) took effect 15 days ago; the next statute version's editions were diffed and confirmed identical, so this should not go stale again around 1/1/2027. 2021 IRC is unchanged by this transition. The International Fire Code is NOT adopted by § 15A-2-103 (it is addressed separately in Title 15A Chapter 5) and is not otherwise referenced in this file..

No. Millard County does not publish a distinct EV-charger or EVSE permit or fee. EV charger installation is billed as standard electrical work: $45 residential or $75 commercial/pivot, per the county's combined Electrical/Mechanical/Plumbing/Stucco permit application form.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Millard County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.