Solar / Solar PV Installation Permit — Unincorporated Millard County, Utah · Requirements sheet
Verified 2026-07-21 · Source: https://millardcounty.gov/wp-content/uploads/2017/04/Mechanical_Electrical_Plumbing_Permit.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Solar / Solar PV Installation Permit in Unincorporated Millard County, Utah
Millard County does not publish a distinct residential or commercial rooftop/building-mounted solar or solar photovoltaic (PV) installation permit, application, or fee. An exhaustive search of the county's Building Inspection Department page, its Forms page, and the county's combined Electrical/Mechanical/Plumbing/Stucco building permit application found no separate solar-specific line item — rooftop/building-mounted solar PV installation is electrical work and is billed under the same general Electrical Permit line item used for all other electrical work ($45.00 residential, $75.00 commercial/pivot), the identical pattern already documented on this file's EV Charger/EVSE Permit entry. This entry covers customer-sited (rooftop or ground-mount, building-connected) solar PV installation only — it is distinct from the large-scale utility solar generation facilities sited in Millard County (e.g., ECG Utah Solar 1, Pavant Solar), which go through the county's separate land-use/zoning Conditional Use Permit process for major solar energy generation facilities, not the building permit process documented in this file.
Verified 2026-07-21 · Source
When you need this permit
- Installation of a rooftop or building-mounted solar photovoltaic (PV) system at a residential or commercial property
- New or modified electrical circuit, inverter, and/or panel/service capacity to interconnect the PV system, covered under the general Electrical line item
- Compliance with the 2023 National Electrical Code (NEC) per Utah Code § 15A-2-103(1)(g)
- Structural adequacy of the roof or mounting structure to support the PV array, per the adopted 2024 IBC/2021 IRC as applicable
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
After PV wiring, conduit, and interconnection equipment installed, before walls closed (where applicable)
- 2
Final
All work complete and operational, including utility interconnection sign-off where required
See the full Unincorporated Millard County inspection guide — scheduling & re-inspection fees →
Tips
- Millard County does not have a separate solar or solar PV permit — rooftop/building-mounted solar PV installation is treated as standard electrical work, pulled under the $45 residential (or $75 commercial/pivot) Electrical line item on the county's combined Electrical/Mechanical/Plumbing/Stucco permit form, the same treatment already documented for EV charger installations in this file.
- This is separate from Millard County's large-scale utility solar generation facilities (e.g., ECG Utah Solar 1, Pavant Solar I/II/III) — those go through the county's zoning/land-use Conditional Use Permit process for major solar energy systems, not the building-permit Electrical line item covered by this entry.
- A re-inspection fee may be charged if the project is not ready for inspection at the time the inspection is ordered, per the permit application form.
- Confirm utility interconnection requirements (e.g., Rocky Mountain Power net-metering application) separately with the electric utility — this is not administered by Millard County Building Department.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-21.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Millard County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Millard County
Solar / Solar PV Installation Permit in other cities
Compare solar / solar pv installation permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Unincorporated Millard County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Millard County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →