Permitted Use Permit (P-1 / P-2) — Change or Establishment of Land Use in Unincorporated Millard County, Utah

Millard County requires a Permitted Use Permit before a use may be established or changed on a property in unincorporated Millard County — including changing a building's occupancy/use without new construction (e.g., a use that differs from the property's prior permitted use). Per the P-1 application form itself: 'Only when the county planner/zoning administrator has approved the permitted P-1 use... and a building permit issued, as required, may any building, activity, construction, or occupancy be commenced.' Reviewed under Millard County Code Title 10, Chapter 8. Uses permitted outright in a zoning district go through the lower-tier P-1 process (reviewed administratively by the County Planner/Zoning Administrator); uses requiring more scrutiny go through the P-2 Conditional Use Permit process. This is a zoning-authority use-permitting mechanism, distinct from and required in addition to any building permit.

Verified 2026-07-20 · Source

When you need this permit

  • Property owner(s) of record (or an authorized agent with a signed affidavit) must submit the application
  • Proposed use must be a P-1 permitted use within the zoning district per Millard County Code Title 10, Section 10-25-1, Appendix A, Table of Uses (or a P-2 conditional use if the district's table designates it as such)
  • Site plan (up to 11" x 17") showing building/use locations, natural features, setbacks, streets, and easements
  • County Recorder's plat map(s) showing the subject property and all adjoining properties within 300 feet
  • List of names and mailing addresses of property owners within 300 feet of the subject property
  • Written permission from any lienholders, mortgage companies, or other parties with a material interest in the property, if different from the applicant
  • A building permit must still be obtained separately, as required, before any building, activity, construction, or occupancy commences

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

P-1 Permitted Use Permit — CommercialMillard County Land Use Fee Schedule, Planning and Zoning Department (millardcounty.gov/wp-content/uploads/departments/planning-zoning/pz-docs/land-use-fee-schedule-2009.pdf).
$85.00 (After the Fact: $170.00)
P-1 Permitted Use Permit — Residential Home Occupation (Major)Millard County Land Use Fee Schedule.
$40.00
P-1 Permitted Use Permit — Residential Home Occupation (Minor)Millard County Land Use Fee Schedule.
$20.00
P-1 Permitted Use Permit — Residential DwellingMillard County Land Use Fee Schedule.
$20.00
P-2 Permitted Use Permit (Conditional Use)Millard County Land Use Fee Schedule; also confirmed as '$130.00' fee-collected line printed directly on the P-2 Permitted Use Application form itself.
$130.00 (After the Fact: $260.00)

Review timeline

Plan review
Not published — contact the department

How long did your Permitted Use Permit (P-1 / P-2) — Change or Establishment of Land Use permit actually take in Unincorporated Millard County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Unincorporated Millard County inspection guide — scheduling & re-inspection fees →

    Tips

    • This is a ZONING use-authorization permit, separate from and required in addition to a building permit — per the P-1 form itself, occupancy may not commence until BOTH the P-1/P-2 use permit is approved AND a building permit (if required) is issued.
    • A use that is 'After the Fact' (i.e., already established without prior approval) is charged double the standard fee — $170.00 versus $85.00 for Commercial P-1, and $260.00 versus $130.00 for P-2 — per the Millard County Land Use Fee Schedule.
    • The same P-1 application form doubles as the county's Sign Permit application (see this file's sign-permit entry) — check the 'P-1 Use' or 'P-1 Sign' box at the top of the form depending on which is being applied for.
    • Whether a specific change of use requires the lower-tier P-1 (administrative approval by the County Planner/Zoning Administrator) or the higher-tier P-2 Conditional Use Permit depends on how that use is classified in the zoning district's Table of Uses (Title 10, Section 10-25-1, Appendix A) — confirm with Planning and Zoning, (435) 864-1400, before applying.

    Frequently asked questions

    Unincorporated Millard County requires a permitted use permit (p-1 / p-2) — change or establishment of land use for: Property owner(s) of record (or an authorized agent with a signed affidavit) must submit the application; Proposed use must be a P-1 permitted use within the zoning district per Millard County Code Title 10, Section 10-25-1, Appendix A, Table of Uses (or a P-2 conditional use if the district's table designates it as such); Site plan (up to 11" x 17") showing building/use locations, natural features, setbacks, streets, and easements; County Recorder's plat map(s) showing the subject property and all adjoining properties within 300 feet; List of names and mailing addresses of property owners within 300 feet of the subject property; Written permission from any lienholders, mortgage companies, or other parties with a material interest in the property, if different from the applicant; A building permit must still be obtained separately, as required, before any building, activity, construction, or occupancy commences. If your project isn't listed, confirm with Millard County Building Department at (435) 864-1400 before starting work.

    In Unincorporated Millard County, the published P-1 Permitted Use Permit — Commercial is: $85.00 (After the Fact: $170.00). Additional published fees: P-1 Permitted Use Permit — Residential Home Occupation (Major) — $40.00; P-1 Permitted Use Permit — Residential Home Occupation (Minor) — $20.00; P-1 Permitted Use Permit — Residential Dwelling — $20.00; P-2 Permitted Use Permit (Conditional Use) — $130.00 (After the Fact: $260.00). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    Unincorporated Millard County does not publish a plan-review timeline for this permit. Contact Millard County Building Department at (435) 864-1400 for current turnaround.

    You'll need: P-1 Permitted Use Application. Depending on your project, Unincorporated Millard County may also ask for: P-2 Permitted Use Application; Owner/Agent Agreement. See the required-documents checklist on this page for details on each.

    Apply through Millard County Building Department at 71 South 200 West, PO Box 854, Delta, UT 84624. Phone: (435) 864-1400, email: buildingofficial@millardcounty.org. Office hours: Monday–Thursday 8:00 AM – 5:30 PM; Friday 8:00 AM – 12:00 PM. Official information: https://millardcounty.gov/your-government/county-departments/building-inspection/.

    Unincorporated Millard County, Utah has adopted: 2021 International Residential Code (IRC) with State of Utah Amendments — per Utah Code § 15A-2-103(1)(b); unchanged by the July 1, 2026 statewide update. Millard County Building Inspection Department page (adopted codes list) also lists 2021 IRC — live-checked 2026-07-16, page unchanged since last check.; 2024 International Building Code (IBC) with State of Utah Amendments — per Utah Code § 15A-2-103(1)(a), effective since July 1, 2026, superseding the 2021 IBC. NOTE (2026-07-16, live-checked): the Millard County Building Inspection Department page still lists 2021 IBC — the county page is lagging the statewide statutory update by 15+ days; the statute is controlling.; 2024 International Plumbing Code (IPC) with State of Utah Amendments — per Utah Code § 15A-2-103(1)(d), effective since July 1, 2026, superseding the 2021 IPC. NOTE (2026-07-16, live-checked): the county page still lists 2021 IPC — page lag, statute controls.; 2024 International Mechanical Code (IMC) with State of Utah Amendments — per Utah Code § 15A-2-103(1)(e), effective since July 1, 2026, superseding the 2021 IMC. NOTE (2026-07-16, live-checked): the county page still lists 2021 IMC — page lag, statute controls.; 2023 National Electrical Code (NEC) per Utah Code § 15A-2-103(1)(g), statewide in force and NOT changed by the July 1, 2026 update — NOTE: this is a separate, pre-existing discrepancy: Millard County's own Building Inspection page lists 2020 NEC (live-checked again 2026-07-16, page still shows 2020 NEC, unrelated to the 2021→2024 code-edition transition affecting the other codes below). Contractors/homeowners should confirm current applicability with the Building Official as the county page lags the statewide amendment.; 2024 International Fuel Gas Code (IFGC) with State of Utah Amendments — per Utah Code § 15A-2-103(1)(f), effective since July 1, 2026, superseding the 2021 IFGC. NOTE (2026-07-16, live-checked): the county page still lists 2021 IFGC — page lag, statute controls.; 2024 International Energy Conservation Code (IECC), Residential & Commercial — per Utah Code § 15A-2-103(1)(h), effective since July 1, 2026, superseding the 2021 IECC. The statute adopts a single IECC edition with no residential/commercial split (this file's existing single combined line already reflects that — no split to collapse). NOTE (2026-07-16, live-checked): the county page still lists 2021 IECC — page lag, statute controls.; 2024 International Existing Building Code (IEBC) — per Utah Code § 15A-2-103(1)(i), effective since July 1, 2026. Not separately listed on the Millard County Building Inspection Department page (live-checked 2026-07-16, page has no IEBC entry at all) — added here because § 15A-2-103 adopts it statewide regardless of the county page's omission.; 2024 residential provisions of the International Swimming Pool and Spa Code (ISPSC) — per Utah Code § 15A-2-103(1)(n), effective since July 1, 2026. Not separately listed on the Millard County Building Inspection Department page (live-checked 2026-07-16, page has no ISPSC entry at all) — added here because § 15A-2-103 adopts it statewide regardless of the county page's omission.; Utah Wildland Urban Interface Code; NOTE (updated 2026-07-16): The July 1, 2026 statewide code-edition transition (2024 IBC/IPC/IMC/IFGC/IECC replacing 2021 editions, per Utah Code § 15A-2-103 version effective 7/1/2026, superseded 1/1/2027) took effect 15 days ago; the next statute version's editions were diffed and confirmed identical, so this should not go stale again around 1/1/2027. 2021 IRC is unchanged by this transition. The International Fire Code is NOT adopted by § 15A-2-103 (it is addressed separately in Title 15A Chapter 5) and is not otherwise referenced in this file..

    Yes. Millard County requires a Permitted Use Permit (P-1, or P-2 if the use is a conditional use) before a new or changed use may be established, per Millard County Code Title 10, Chapter 8. The P-1 form states occupancy may not commence until both the use permit is approved and a required building permit is issued. Fees are $85.00 for a Commercial P-1 (or $130.00 for a P-2 Conditional Use Permit), doubled to $170.00/$260.00 if the use was already established without prior approval ('After the Fact').

    No. The P-1/P-2 Permitted Use Permit is a zoning-authority approval confirming the proposed use is allowed (or conditionally allowed) in that zoning district; a building permit is a separate requirement administered by the Building Department for any construction, alteration, or occupancy work. Per the P-1 application: both must be obtained, as required, before occupancy may begin.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-20.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Millard County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.