Demolition Permit in Unincorporated Millard County, Utah

Required for demolition of any structure in unincorporated Millard County. Homeowner-performed demolition is regulated by the county (not State Air Quality, which only regulates contractors) for asbestos determination purposes.

Verified 2026-07-08 · Source

When you need this permit

  • Complete demolition of any structure
  • Utilities must be disconnected before demolition begins
  • Water and sewer lines must be located and terminated before demolition
  • Asbestos determination required — contractor or homeowner is responsible for determining if asbestos is present
  • All debris including foundation must be removed and holes filled by the completion date, with a final inspection scheduled

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Demolition PermitMillard County Demolition Application/Permit form
$25.00
State SurchargeMillard County Demolition Application/Permit form — listed as a line item on the form ($25.25 total)
1% of permit fee ($0.25 on the $25 base fee)

Review timeline

Plan reviewTypical estimate — confirm current times with the Unincorporated Millard County building department
~3–14 business days

How long did your Demolition Permit permit actually take in Unincorporated Millard County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final

    Site cleared, foundation removed, holes filled with off-site material, basement/crawl space filled

See the full Unincorporated Millard County inspection guide — scheduling & re-inspection fees →

Tips

  • Demolition permits expire in 180 days.
  • Contact Blue Stakes (1-800-662-4111) before any excavation associated with demolition.
  • Before blocking any public roads, approval is required from both the Millard County Road Department (435-864-2467) or UDOT (435-864-2196) and the Sheriff's Office (435-743-5302), including specific dates and times.
  • Continuous dampening of demolition debris is required to contain dust — noncompliance is subject to fines.
  • If unable to meet the start or completion date, the applicant must notify Millard County and the Utah Division of Air Quality and apply for a new demolition permit.

Frequently asked questions

Yes. The contractor or homeowner is responsible for determining if asbestos is present. If a licensed contractor performs the work, State Air Quality regulations apply; if the homeowner performs the work, the County regulates the process. If asbestos is found, a removal report from an approved asbestos company must be submitted to the County within 48 hours, and no demolition can proceed until the County reviews the report and issues the permit.

The demolition permit fee is $25.00 plus a 1% state surcharge ($0.25), for a total of $25.25, per the Millard County Demolition Application/Permit form.

Plan review for a demolition permit in Unincorporated Millard County typically runs 3–14 business days. This is an estimate, not a published figure — confirm current review times with Millard County Building Department at (435) 864-1400.

You'll need: Millard County Demolition Application/Permit. Depending on your project, Unincorporated Millard County may also ask for: State Air Quality Demolition Permit; Asbestos Removal Report. See the required-documents checklist on this page for details on each.

Unincorporated Millard County requires 1 inspection(s) for a demolition permit, in order: Final. Schedule each through Millard County Building Department ((435) 864-1400).

Apply through Millard County Building Department at 71 South 200 West, PO Box 854, Delta, UT 84624. Phone: (435) 864-1400, email: buildingofficial@millardcounty.org. Office hours: Monday–Thursday 8:00 AM – 5:30 PM; Friday 8:00 AM – 12:00 PM. Official information: https://millardcounty.gov/your-government/county-departments/building-inspection/.

Unincorporated Millard County, Utah has adopted: 2021 International Residential Code (IRC) with State of Utah Amendments — per Utah Code § 15A-2-103(1)(b); unchanged by the July 1, 2026 statewide update. Millard County Building Inspection Department page (adopted codes list) also lists 2021 IRC — live-checked 2026-07-16, page unchanged since last check.; 2024 International Building Code (IBC) with State of Utah Amendments — per Utah Code § 15A-2-103(1)(a), effective since July 1, 2026, superseding the 2021 IBC. NOTE (2026-07-16, live-checked): the Millard County Building Inspection Department page still lists 2021 IBC — the county page is lagging the statewide statutory update by 15+ days; the statute is controlling.; 2024 International Plumbing Code (IPC) with State of Utah Amendments — per Utah Code § 15A-2-103(1)(d), effective since July 1, 2026, superseding the 2021 IPC. NOTE (2026-07-16, live-checked): the county page still lists 2021 IPC — page lag, statute controls.; 2024 International Mechanical Code (IMC) with State of Utah Amendments — per Utah Code § 15A-2-103(1)(e), effective since July 1, 2026, superseding the 2021 IMC. NOTE (2026-07-16, live-checked): the county page still lists 2021 IMC — page lag, statute controls.; 2023 National Electrical Code (NEC) per Utah Code § 15A-2-103(1)(g), statewide in force and NOT changed by the July 1, 2026 update — NOTE: this is a separate, pre-existing discrepancy: Millard County's own Building Inspection page lists 2020 NEC (live-checked again 2026-07-16, page still shows 2020 NEC, unrelated to the 2021→2024 code-edition transition affecting the other codes below). Contractors/homeowners should confirm current applicability with the Building Official as the county page lags the statewide amendment.; 2024 International Fuel Gas Code (IFGC) with State of Utah Amendments — per Utah Code § 15A-2-103(1)(f), effective since July 1, 2026, superseding the 2021 IFGC. NOTE (2026-07-16, live-checked): the county page still lists 2021 IFGC — page lag, statute controls.; 2024 International Energy Conservation Code (IECC), Residential & Commercial — per Utah Code § 15A-2-103(1)(h), effective since July 1, 2026, superseding the 2021 IECC. The statute adopts a single IECC edition with no residential/commercial split (this file's existing single combined line already reflects that — no split to collapse). NOTE (2026-07-16, live-checked): the county page still lists 2021 IECC — page lag, statute controls.; 2024 International Existing Building Code (IEBC) — per Utah Code § 15A-2-103(1)(i), effective since July 1, 2026. Not separately listed on the Millard County Building Inspection Department page (live-checked 2026-07-16, page has no IEBC entry at all) — added here because § 15A-2-103 adopts it statewide regardless of the county page's omission.; 2024 residential provisions of the International Swimming Pool and Spa Code (ISPSC) — per Utah Code § 15A-2-103(1)(n), effective since July 1, 2026. Not separately listed on the Millard County Building Inspection Department page (live-checked 2026-07-16, page has no ISPSC entry at all) — added here because § 15A-2-103 adopts it statewide regardless of the county page's omission.; Utah Wildland Urban Interface Code; NOTE (updated 2026-07-16): The July 1, 2026 statewide code-edition transition (2024 IBC/IPC/IMC/IFGC/IECC replacing 2021 editions, per Utah Code § 15A-2-103 version effective 7/1/2026, superseded 1/1/2027) took effect 15 days ago; the next statute version's editions were diffed and confirmed identical, so this should not go stale again around 1/1/2027. 2021 IRC is unchanged by this transition. The International Fire Code is NOT adopted by § 15A-2-103 (it is addressed separately in Title 15A Chapter 5) and is not otherwise referenced in this file..

Sources & verification

Verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Millard County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.