Unincorporated Millard County building permits
VerifiedDepartment contacts, adopted codes, permit types, fees, and gotchas for Unincorporated Millard County, Utah.
Last verified 2026-07-08 · Source · Embed this page’s badge · Version history
Building department
- Address
- 71 South 200 West, PO Box 854, Delta, UT 84624
- Phone
- (435) 864-1400
- Office hours
- Monday–Thursday 8:00 AM – 5:30 PM; Friday 8:00 AM – 12:00 PM
- Website
- Official site
Inspection guide
See how inspections work in Unincorporated Millard County — sequence, scheduling & re-inspection fees.
Codes adopted
Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.
- 2021 International Residential Code (IRC) with State of Utah Amendments — per Utah Code § 15A-2-103(1)(b); unchanged by the July 1, 2026 statewide update. Millard County Building Inspection Department page (adopted codes list) also lists 2021 IRC.
- 2024 International Building Code (IBC) with State of Utah Amendments — per Utah Code § 15A-2-103(1)(a), effective since July 1, 2026, superseding the 2021 IBC. NOTE: the Millard County Building Inspection Department page still lists 2021 IBC — the county page lags the statewide statutory update; the statute is controlling.
- 2024 International Plumbing Code (IPC) with State of Utah Amendments — per Utah Code § 15A-2-103(1)(d), effective since July 1, 2026, superseding the 2021 IPC. NOTE: the county page still lists 2021 IPC — page lag, statute controls.
- 2024 International Mechanical Code (IMC) with State of Utah Amendments — per Utah Code § 15A-2-103(1)(e), effective since July 1, 2026, superseding the 2021 IMC. NOTE: the county page still lists 2021 IMC — page lag, statute controls.
2023 National Electrical Code (NEC) per Utah Code § 15A-2-103(1)(g), statewide in force and NOT changed by the July 1, 2026 update — NOTE: this is a separate, pre-existing discrepancy: Millard County's own Building… Show full textShow less
2023 National Electrical Code (NEC) per Utah Code § 15A-2-103(1)(g), statewide in force and NOT changed by the July 1, 2026 update — NOTE: this is a separate, pre-existing discrepancy: Millard County's own Building Inspection page lists 2020 NEC (unrelated to the 2021→2024 code-edition transition affecting the other codes below). Contractors/homeowners should confirm current applicability with the Building Official as the county page lags the statewide amendment.
- 2024 International Fuel Gas Code (IFGC) with State of Utah Amendments — per Utah Code § 15A-2-103(1)(f), effective since July 1, 2026, superseding the 2021 IFGC. NOTE: the county page still lists 2021 IFGC — page lag, statute controls.
- 2024 International Energy Conservation Code (IECC), Residential & Commercial — per Utah Code § 15A-2-103(1)(h), effective since July 1, 2026, superseding the 2021 IECC. The statute adopts a single IECC edition with no residential/commercial split. NOTE: the county's own page still lists the 2021 IECC — page lag; the statute controls.
- 2024 International Existing Building Code (IEBC) — per Utah Code § 15A-2-103(1)(i), effective since July 1, 2026. Not separately listed on the Millard County Building Inspection Department page (which has no IEBC entry at all) — included here because § 15A-2-103 adopts it statewide regardless of the county page's omission.
- 2024 residential provisions of the International Swimming Pool and Spa Code (ISPSC) — per Utah Code § 15A-2-103(1)(n), effective since July 1, 2026. Not separately listed on the Millard County Building Inspection Department page (which has no ISPSC entry at all) — included here because § 15A-2-103 adopts it statewide regardless of the county page's omission.
- Utah Wildland Urban Interface Code
- NOTE: The July 1, 2026 statewide code-edition transition (2024 IBC/IPC/IMC/IFGC/IECC replacing 2021 editions, per Utah Code § 15A-2-103 version effective 7/1/2026) is in effect, and the statute version taking effect 1/1/2027 carries identical code editions. The 2021 IRC is unchanged by this transition. The International Fire Code is NOT adopted by § 15A-2-103 (it is addressed separately in Title 15A Chapter 5).
Permit types & fees
Residential Building Permit
Required for new residential construction, additions, and structural alterations in unincorporated Millard County. Millard County Building Department (Building Official Adam Richins) issues permits for the unincorporated county and, per a 2020 interlocal arrangement, performs building inspections for Delta City (Delta City Council voted to hire the county for inspections in March 2020, ending its contract with Sunrise Engineering). Fillmore City is NOT covered — Fillmore continues to contract with Sunrise Engineering as of the sources checked.
From$25.00valuation-basedElectrical / Mechanical / Plumbing / Stucco Permit
Required for electrical, mechanical, plumbing, and stucco work in unincorporated Millard County, per the county's combined Electrical/Mechanical/Plumbing/Stucco permit application form. EV charger/EVSE installation is electrical work and falls under this general Electrical permit line; Millard County's permit application form does not publish a separate EV-specific fee item.
From$45.00Demolition Permit
Required for demolition of any structure in unincorporated Millard County. Homeowner-performed demolition is regulated by the county (not State Air Quality, which only regulates contractors) for asbestos determination purposes.
From$25.00Commercial Building Permit
Required for new commercial construction in unincorporated Millard County, regulated by the statewide-adopted 2024 IBC (Utah Code § 15A-2-103(1)(a), effective July 1, 2026). Millard County Building Department (Building Official Adam Richins) does not publish a distinct commercial building permit page, application form, or valuation-based fee schedule separate from the general process used for the Residential Building Permit — no published, dedicated commercial fee schedule appears on the county website, in any linked Building Forms PDF, or in the county's 2026 Adopted Budget, the same situation as for residential permits.
See fee scheduleCommercial Tenant Improvement / Tenant Finish Permit
Required for tenant improvement and tenant finish work in existing commercial buildings in unincorporated Millard County. No dedicated tenant-improvement permit type, application, checklist, or fee is published by Millard County Building Department — an exhaustive search of the county website and all linked Building Forms PDFs found no tenant-improvement-specific materials, consistent with the same gap documented for the county's Commercial Building Permit entry.
See fee schedulePermitted Use Permit (P-1 / P-2) — Change or Establishment of Land Use
Millard County requires a Permitted Use Permit before a use may be established or changed on a property in unincorporated Millard County — including changing a building's occupancy/use without new construction (e.g., a use that differs from the property's prior permitted use). Per the P-1 application form itself: 'Only when the county planner/zoning administrator has approved the permitted P-1 use... and a building permit issued, as required, may any building, activity, construction, or occupancy be commenced.' Reviewed under Millard County Code Title 10, Chapter 8. Uses permitted outright in a zoning district go through the lower-tier P-1 process (reviewed administratively by the County Planner/Zoning Administrator); uses requiring more scrutiny go through the P-2 Conditional Use Permit process. This is a zoning-authority use-permitting mechanism, distinct from and required in addition to any building permit.
From$85.00Sign Permit (P-1/P-2/C-1 depending on sign type)
Required for signs in unincorporated Millard County under Millard County Code Title 10, Chapter 9 (Sign Standards); the full text of MCC 10-9-1 through 10-9-21 is available via the county's amlegal.com code library. Table 10-9-2 (Allowed Signs) shows the P-1/administrator process does NOT cover the most common commercial sign types — freestanding pylon and monument signs are Conditional C-1 signs decided by the Commission, and wall signs are Permitted P-2 signs also decided by the Commission; only canopy signs go through the P-1/county-planner process. Small on-premises signs, freestanding directional signs, and temporary signs (≤64 sq ft, ≤12 months) require no land use authority approval at all.
From$85.00EV Charger / EVSE Permit
Millard County does not publish a distinct EV charger, EVSE, or electric vehicle charging station permit or fee. EV charger/EVSE installation is electrical work and falls under the county's combined Electrical/Mechanical/Plumbing/Stucco permit application, at the $45 residential (or $75 commercial/pivot) Electrical line item. The county's permit application form does not publish a separate EV-specific fee item.
From$45.00Solar / Solar PV Installation Permit
Millard County does not publish a distinct residential or commercial rooftop/building-mounted solar or solar photovoltaic (PV) installation permit, application, or fee. Neither the county's Building Inspection Department page, its Forms page, nor the county's combined Electrical/Mechanical/Plumbing/Stucco building permit application carries a separate solar-specific line item — rooftop/building-mounted solar PV installation is electrical work and is billed under the same general Electrical Permit line item used for all other electrical work ($45.00 residential, $75.00 commercial/pivot), the identical pattern as the EV Charger/EVSE Permit. This entry covers customer-sited (rooftop or ground-mount, building-connected) solar PV installation only — it is distinct from the large-scale utility solar generation facilities sited in Millard County (e.g., ECG Utah Solar 1, Pavant Solar), which go through the county's separate land-use/zoning Conditional Use Permit process for major solar energy generation facilities, not the building permit process.
From$45.00Fire Sprinkler / Fire Alarm System Plan Review Permit
Neither Millard County nor the Millard County Fire District publishes a local fire-code plan-review or permitting process for fire sprinkler or fire alarm systems — Millard County's own official Public Safety page lists no local Fire Marshal or fire-code authority and instead links directly to the Utah State Fire Marshal's Office. The Utah State Fire Marshal (SFM) accepts direct project plan-review submittals statewide via its own Fire Alarm Plan Review Submittal Form and Automatic Fire Sprinkler Plan Submittal Form, at a fee of $0.022 per square foot reviewed with a $75.00 minimum. However, Utah Admin. Code R710-9-8's mandatory statewide plan-review/inspection scope (triggered when no Local Fire Authority completes the review) is written around publicly-owned buildings, public/private schools, colleges/universities, institutional occupancies, and places of assembly — not general private commercial construction — so the rule text does not clearly establish SFM jurisdiction over a private commercial fire-protection system in unincorporated Millard County. This entry documents the SFM statewide process as the best-available real, verifiable fallback and is marked partial confidence because that specific jurisdictional question is not clearly resolved by the published sources.
From$0.02
Unincorporated Millard County's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Unincorporated Millard County yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Unincorporated Millard County lands. Privacy.
New residential construction activity
New privately-owned residential construction onlyHousing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).
- Latest month (2026-07)
- 44units
23 buildings · $2M valuation
- Trailing 12 months
- 126units
12 of 12 months reported · #55 in Utah coverage by units
- Year to date (2026 YTD through 2026-07)
- 97units
65 buildings · $8.7M valuation
- Full year 2025
- 73units
70 buildings · $19.4M valuation
County-wide figures: BPS reports county-wide totals; jurisdiction is the unincorporated remainder — county totals include incorporated cities. The Millard County Building Department (Adam Richins, Building Official) is also the contracted building-inspection provider for Delta City per a 2020 interlocal arrangement (Delta City Council hired the county to perform inspections after ending its Sunrise Engineering contract, per the Millard County Chronicle Progress article headlined 'County hired to do Delta building inspections,' 3/11/2020 — the article's original URL now redirects to the paper's homepage; the account is corroborated by coverage naming Delta public works director Dent Kirkland and the Sunrise Engineering transition). Fillmore City has NOT signed onto county inspection services and continues to use Sunrise Engineering — Fillmore is explicitly EXCLUDED from this entry's coverage.
Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-07 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity
Tips & gotchas
- Millard County Building Department confirmed to also perform Delta City's building inspections since March 2020, per an interlocal arrangement (Delta City Council hired the county after ending its contract with Sunrise Engineering — Millard County Chronicle Progress, 3/11/2020). Delta's own city site still lists a named 'Delta City's Building Inspector' contact — confirm current arrangement details with either office, as small-jurisdiction staffing arrangements can shift.
- Fillmore City is NOT covered by this entry and NOT confirmed to use the county's building inspection services — Fillmore continues to list its own building permits process and has historically used Sunrise Engineering.
- All residential dwellings built in the unincorporated parts of Millard County require a recorded Conditional Use Permit (prepared by the Building Department after building permit approval) — this is specific to unincorporated-area land, distinguishing it from incorporated cities.
- No published, dedicated valuation-based fee schedule for the primary Residential Building Permit (new construction, additions) could be located despite exhausting the county website, all linked building-department PDFs, the county's 2026 Adopted Budget and Department Expenditures summary, and web/targeted search — only flat fees for demolition and electrical/mechanical/plumbing/stucco permits are published. Contact the Building Official (435-864-1400) directly for current residential valuation fee tables.
- The county's Building Inspection webpage lists 2020 NEC as the adopted electrical code, while Utah Code § 15A-2-103(1)(g) sets the statewide 2023 NEC — a discrepancy on the county's own page, not resolved by any newer county publication; confirm current applicability with the Building Official.
- Design criteria discrepancy: the live Building Inspection webpage (current) lists Roof snow load 20 psf / Ground snow load 30 psf / Wind 115 mph; the county's separate 'Residential Plan and Permit Acceptance Policy' PDF (dated October 2009) lists different figures (30# snow load, 43# ground snow load, 90/75 MPH wind). Treat the current webpage as authoritative and confirm project-specific values with the Building Official.
- Agricultural structures not used for human occupancy are exempt from state construction code permits under Utah Code § 15A-1-204(7)(a), except when located within city/town boundaries on lots under 5 acres, or within an approved subdivision plat on lots under 2 acres.
- Millard County's mailing/office split: Building Department main office is in Delta (71 South 200 West); other county elected-official offices operate out of Fillmore (50 South Main) and the Justice Complex (765 S Hwy 99, Fillmore).
- Utah Code § 15A-2-103 sets the 2024 editions of the IBC/IPC/IMC/IFGC/IECC effective July 1, 2026 (2021 IRC unchanged), and also adopts the 2024 IEBC and ISPSC statewide even though the county's own page lists neither. The Millard County Building Inspection page still lists all-2021 editions and the 2020 NEC — a confirmed page-lag discrepancy; the statute controls. The IFC is not adopted by § 15A-2-103.