Commercial Tenant Improvement / Tenant Finish Permit in Unincorporated Millard County, Utah

Required for tenant improvement and tenant finish work in existing commercial buildings in unincorporated Millard County. No dedicated tenant-improvement permit type, application, checklist, or fee is published by Millard County Building Department — an exhaustive search of the county website and all linked Building Forms PDFs found no tenant-improvement-specific materials, consistent with the same gap documented for the county's Commercial Building Permit entry.

Reviewed 2026-07-19 · Source

When you need this permit

  • Tenant improvement or tenant finish work in an existing commercial building within unincorporated Millard County
  • Any structural modification, alteration, repair, or occupancy change of a commercial structure (UCA 17-27a-802)
  • All contractors/subcontractors must hold a current Utah State Contractor's license Contractor

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit FeeSame gap documented on this file's Commercial Building Permit entry. Contact the Building Official (435-864-1400) directly for a project-specific fee quote.
Not published — no tenant-improvement-specific or general commercial fee schedule was located on millardcounty.gov as of 2026-07-19
Electrical Permit (Commercial or Pivot, where applicable to TI scope)Millard County Building Permit Application — Electrical/Mechanical/Plumbing/Stucco form, if the tenant improvement scope includes standalone electrical work billed separately from a general building permit.
$75.00

Review timeline

Plan review
Not published — contact the department

How long did your Commercial Tenant Improvement / Tenant Finish Permit permit actually take in Unincorporated Millard County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Framing / Structural (if applicable)

    Verified before close-in where the tenant improvement scope includes framing or structural changes.

  2. 2

    Final

    All work complete, ready for occupancy.

See the full Unincorporated Millard County inspection guide — scheduling & re-inspection fees →

Tips

  • Millard County Building Department publishes no tenant-improvement-specific materials online at all — call the Building Official at 435-864-1400 before starting a tenant-improvement project to confirm the applicable process and fee.
  • If the tenant-improvement project is in Delta City, note that Millard County Building Department has performed Delta's inspections since a 2020 interlocal arrangement — the same county staff and process likely apply. Fillmore City continues to use Sunrise Engineering and is NOT covered by this file.

Frequently asked questions

Unincorporated Millard County requires a commercial tenant improvement / tenant finish permit for: Tenant improvement or tenant finish work in an existing commercial building within unincorporated Millard County; Any structural modification, alteration, repair, or occupancy change of a commercial structure (UCA 17-27a-802); All contractors/subcontractors must hold a current Utah State Contractor's license. If your project isn't listed, confirm with Millard County Building Department at (435) 864-1400 before starting work.

In Unincorporated Millard County, the published Building Permit Fee is: Not published — no tenant-improvement-specific or general commercial fee schedule was located on millardcounty.gov as of 2026-07-19. Additional published fees: Electrical Permit (Commercial or Pivot, where applicable to TI scope) — $75.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Unincorporated Millard County does not publish a plan-review timeline for this permit. Contact Millard County Building Department at (435) 864-1400 for current turnaround.

You'll need: Building Permit Pre-Application Worksheet; Construction Plans (Tenant Space Scope). See the required-documents checklist on this page for details on each.

Unincorporated Millard County requires 2 inspection(s) for a commercial tenant improvement / tenant finish permit, in order: Framing / Structural (if applicable), Final. Schedule each through Millard County Building Department ((435) 864-1400).

Apply through Millard County Building Department at 71 South 200 West, PO Box 854, Delta, UT 84624. Phone: (435) 864-1400, email: buildingofficial@millardcounty.org. Office hours: Monday–Thursday 8:00 AM – 5:30 PM; Friday 8:00 AM – 12:00 PM. Official information: https://millardcounty.gov/your-government/county-departments/building-inspection/.

Unincorporated Millard County, Utah has adopted: 2021 International Residential Code (IRC) with State of Utah Amendments — per Utah Code § 15A-2-103(1)(b); unchanged by the July 1, 2026 statewide update. Millard County Building Inspection Department page (adopted codes list) also lists 2021 IRC — live-checked 2026-07-16, page unchanged since last check.; 2024 International Building Code (IBC) with State of Utah Amendments — per Utah Code § 15A-2-103(1)(a), effective since July 1, 2026, superseding the 2021 IBC. NOTE (2026-07-16, live-checked): the Millard County Building Inspection Department page still lists 2021 IBC — the county page is lagging the statewide statutory update by 15+ days; the statute is controlling.; 2024 International Plumbing Code (IPC) with State of Utah Amendments — per Utah Code § 15A-2-103(1)(d), effective since July 1, 2026, superseding the 2021 IPC. NOTE (2026-07-16, live-checked): the county page still lists 2021 IPC — page lag, statute controls.; 2024 International Mechanical Code (IMC) with State of Utah Amendments — per Utah Code § 15A-2-103(1)(e), effective since July 1, 2026, superseding the 2021 IMC. NOTE (2026-07-16, live-checked): the county page still lists 2021 IMC — page lag, statute controls.; 2023 National Electrical Code (NEC) per Utah Code § 15A-2-103(1)(g), statewide in force and NOT changed by the July 1, 2026 update — NOTE: this is a separate, pre-existing discrepancy: Millard County's own Building Inspection page lists 2020 NEC (live-checked again 2026-07-16, page still shows 2020 NEC, unrelated to the 2021→2024 code-edition transition affecting the other codes below). Contractors/homeowners should confirm current applicability with the Building Official as the county page lags the statewide amendment.; 2024 International Fuel Gas Code (IFGC) with State of Utah Amendments — per Utah Code § 15A-2-103(1)(f), effective since July 1, 2026, superseding the 2021 IFGC. NOTE (2026-07-16, live-checked): the county page still lists 2021 IFGC — page lag, statute controls.; 2024 International Energy Conservation Code (IECC), Residential & Commercial — per Utah Code § 15A-2-103(1)(h), effective since July 1, 2026, superseding the 2021 IECC. The statute adopts a single IECC edition with no residential/commercial split (this file's existing single combined line already reflects that — no split to collapse). NOTE (2026-07-16, live-checked): the county page still lists 2021 IECC — page lag, statute controls.; 2024 International Existing Building Code (IEBC) — per Utah Code § 15A-2-103(1)(i), effective since July 1, 2026. Not separately listed on the Millard County Building Inspection Department page (live-checked 2026-07-16, page has no IEBC entry at all) — added here because § 15A-2-103 adopts it statewide regardless of the county page's omission.; 2024 residential provisions of the International Swimming Pool and Spa Code (ISPSC) — per Utah Code § 15A-2-103(1)(n), effective since July 1, 2026. Not separately listed on the Millard County Building Inspection Department page (live-checked 2026-07-16, page has no ISPSC entry at all) — added here because § 15A-2-103 adopts it statewide regardless of the county page's omission.; Utah Wildland Urban Interface Code; NOTE (updated 2026-07-16): The July 1, 2026 statewide code-edition transition (2024 IBC/IPC/IMC/IFGC/IECC replacing 2021 editions, per Utah Code § 15A-2-103 version effective 7/1/2026, superseded 1/1/2027) took effect 15 days ago; the next statute version's editions were diffed and confirmed identical, so this should not go stale again around 1/1/2027. 2021 IRC is unchanged by this transition. The International Fire Code is NOT adopted by § 15A-2-103 (it is addressed separately in Title 15A Chapter 5) and is not otherwise referenced in this file..

No dedicated tenant-improvement permit type, application, or fee schedule is published by Millard County as of 2026-07-19. Contact the Building Official, Adam Richins, at 435-864-1400 to confirm requirements and fees for a specific tenant-improvement project.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Millard County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

This one’s complicated · Get an expediter

Tell us about your project and we’ll connect you with a permit expediter who works in Unincorporated Millard County.

PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.