Stand-Alone Building Permit (Additions, Remodels, Accessory Structures) — City of Globe, Arizona · Requirements sheet
Verified 2026-07-06 · Source: https://www.globeaz.gov/o/cog/page/fee-schedules
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Stand-Alone Building Permit (Additions, Remodels, Accessory Structures) in City of Globe, Arizona
Covers building-only work not part of a full Building Permit application — additions, remodels, patio covers, carports, and accessory structures — billed as a percentage of the full valuation-based Building Permit Fee Table. Applied for via the CitizenServe portal (Stand-Alone Building Permit application type).
Verified 2026-07-06 · Source
When you need this permit
- Stand-alone building permits apply to separate building work not requiring, or not part of, a full new-construction Building Permit
- Detached one-story accessory structures 200 sq ft or less with no electric/plumbing/mechanical do not require a permit (zoning review for setbacks/height still applies)
- Pre-manufactured accessory buildings, metal awnings, metal pre-manufactured carports/barns/garages/covered porches, wood open decks/balconies, and pergolas/gazebos are billed from a dedicated per-square-foot valuation table rather than the general ICC valuation table
- Plans must comply with City of Globe design criteria (115 mph wind, Exposure B; Seismic Design Category C; 40 psf habitable attic/sleeping live load)
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation/Footing
Required before concrete pour for additions or accessory structures with foundations
- 2
Framing
Structural connections to existing structure or accessory structure framing
- 3
Final
Completed work verified against approved plans
See the full City of Globe inspection guide — scheduling & re-inspection fees →
Tips
- The City of Globe's Plan Submittal and Review page publishes a real 15-working-day residential plan review timeframe (30 working days for commercial), which applies to stand-alone building permits/additions/remodels. Source: City of Globe Plan Submittal and Review page (globeaz.gov/o/cog/page/plan-submittal-and-review). Hourly plan-review and inspection rates ($70/hr standard, $140/hr expedited/after-hours) apply on top of the base review.
- Metal pre-manufactured accessory structures (carports, barns, garages, covered porches) are billed from a dedicated per-square-foot valuation table, not the general ICC Building Valuation Data Table used for new-construction dwellings.
- One-story detached accessory structures 200 sq ft or less with no electric/plumbing/mechanical are exempt from a building permit, though zoning review for setbacks and height still applies.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the City of Globe building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in City of Globe
Look up this fee in a different city →
Now live
Build your City of Globe project checklist
Describe your project once and get every permit, document, and fee it triggers in City of Globe — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.