City of Globe building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in City of Globe, Arizona.

Verified 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
Globe City Hall, 150 N. Pine Street, Globe, AZ 85501
Phone
928-425-7146 ext. 219
Office hours
Permit Technician: Katrina Estrada, (928) 425-7146 ext. 219. Building Inspector: Gary Grimes, (928) 961-0158. Fax: 928-425-4820. Specific published office hours were not found on the City's live 'How to Obtain Permits' page as of July 2026 — City Hall is located at 150 N. Pine Street, Globe, AZ 85501. Applications may be submitted in person at City Hall or online via the City's CitizenServe portal (citizenserve.com/globeaz, installation ID 469), which lists permit-specific application types (Building Permit - New Construction, Stand-Alone Building/Electrical/Mechanical/Plumbing, OTC Electrical/Mechanical/Plumbing/Demolition, Photovoltaic, Pool and Spa, Manufactured Home, Sign, Demolition, Certificate of Occupancy, Temporary CO, and others).

Published scheduling rules

  • Inspections must be requested through the CitizenServe Online Portal at least one day in advance of the desired inspection date (Fire Sprinkler & Fire Alarm System Permit)

Inspection sequence

Applies to: Manufactured Home / Park Model Permit

  1. 1

    Ground Set/Foundation/Stem Wall

    Verifies anchoring, foundation, and stem wall installation per manufacturer instructions and adopted IRC requirements

  2. 2

    Electrical/Utility Connection

    Verifies electrical panel, installation, and water/sewer connections

  3. 3

    Final

    Skirting and perimeter enclosure verified complete

Applies to: Residential Building Permit (New Construction)

  1. 1

    Foundation/Footing

    Before concrete pour

  2. 2

    Framing

    Structural framing, connections, and egress per 2021 IRC and City of Globe design criteria

  3. 3

    Final / Certificate of Occupancy

    All work complete per approved plans; Certificate of Occupancy fee of $70 applies

Applies to: Sign Permit (Commercial/Business Signage)

  1. 1

    Footing Inspection

    Required for freestanding signs exceeding 50 square feet in area and/or exceeding 30 inches in height (Sec. 14-13-13(a))

  2. 2

    Electrical Inspection

    Required for any sign containing electrical wiring; electrical components must bear the label of an approved testing agency (Sec. 14-13-13(b))

  3. 3

    Final/Shop Inspection

    Verifies the completed sign was constructed according to the approved application and valid sign permit, including inspection of braces, anchors, supports, and connections (Sec. 14-13-13(c)-(d))

Applies to: Stand-Alone Building Permit (Additions, Remodels, Accessory Structures)

  1. 1

    Foundation/Footing

    Required before concrete pour for additions or accessory structures with foundations

  2. 2

    Framing

    Structural connections to existing structure or accessory structure framing

  3. 3

    Final

    Completed work verified against approved plans

Applies to: Certificate of Occupancy (including Change of Use)

  1. 1

    Final Building Inspection

    Building Official verifies the completed work or existing space meets all applicable building code requirements for the certificate/change of use being sought

  2. 2

    Final Fire Inspection

    Fire Marshal sign-off confirming fire/life-safety code compliance, billed separately as the Fire C of O fee

Applies to: Electrical Permit (OTC / Stand-Alone)

  1. 1

    Rough-In

    Wiring, box placement, and panel connections before walls are closed

  2. 2

    Final

    Devices installed and connections verified per 2020 NEC

Applies to: Fire Sprinkler & Fire Alarm System Permit

  1. 1

    Fire Protection System Rough-In / Underground Inspection

    Inspection of underground piping, rough-in sprinkler/alarm wiring and devices prior to concealment, conducted by the Fire Marshal or designee

  2. 2

    Fire Protection System Final Inspection

    Final acceptance test/inspection of the completed fire sprinkler or fire alarm system prior to occupancy, requested through the CitizenServe portal at least one day in advance

Applies to: Mechanical / HVAC Permit (OTC / Stand-Alone)

  1. 1

    Rough-In

    Ductwork and equipment placement before walls closed (ducted systems)

  2. 2

    Final

    Equipment operational, clearances verified

Applies to: Plumbing Permit (OTC / Stand-Alone)

  1. 1

    Rough-In

    After pipes installed, before walls closed

  2. 2

    Final

    Fixtures connected, water heater connections verified, no leaks

Applies to: Solar Photovoltaic (PV) Permit

  1. 1

    Rough Electrical

    Conduit runs, disconnect placement before energizing

  2. 2

    Final

    Panel mounting, racking attachment, roof penetration sealing, and interconnection point verified

Applies to: Swimming Pool / Spa / Hot Tub Permit

  1. 1

    Pool/Mechanical/Electric/Plumbing

    Combined inspection of pool shell, equipment, electrical bonding/grounding, and plumbing per the flat fee structure

  2. 2

    Barrier/Final

    Verifies compliance with the 60-inch enclosure/barrier requirement and self-closing/self-latching gate hardware

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the City of Globe building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

City of Globe building permits