Solar Photovoltaic (PV) Permit in City of Globe, Arizona
Required for installation of residential or commercial solar photovoltaic systems in Globe, governed by the 2021 IBC/IRC Chapter 12 Energy Systems provisions (NFPA 855) as adopted and amended by the City, plus Fire Code marking/pathway requirements. Applications are submitted via the CitizenServe portal (Photovoltaic Permit application type).
Verified 2026-07-06 · Source
When you need this permit
- Permit required for roof-mount, ground-mount, battery backup (ESS), and solar water heater systems
- Energy systems shall be installed in accordance with City of Globe Chapter 12 amendments and NFPA 855; residential plan review is included in the base permit fee, commercial plan review is billed separately
- Interior pathways between array sections required per Fire Code Section 1205.3.2 amendment (minimum 150-ft intervals, 4-ft-wide pathways to standpipes/hatches)
- Marking required on DC conduit/raceways/enclosures every 10 feet stating 'WARNING: PHOTOVOLTAIC POWER SOURCE' per Fire Code amendment
- Apply via the CitizenServe online portal (Photovoltaic Permit) or in person at Globe City Hall
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough Electrical
Conduit runs, disconnect placement before energizing
- 2
Final
Panel mounting, racking attachment, roof penetration sealing, and interconnection point verified
See the full City of Globe inspection guide — scheduling & re-inspection fees →
Tips
- The City of Globe's Plan Submittal and Review page publishes a real 15-working-day residential plan review timeframe (30 working days for commercial), which applies to solar PV permits. Source: City of Globe Plan Submittal and Review page (globeaz.gov/o/cog/page/plan-submittal-and-review).
- Residential solar permits include plan review in the base fee; commercial solar permits bill plan review separately.
- Fire Code requires DC conduit/raceway marking every 10 feet and dedicated roof pathways between array sections for firefighter access.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the City of Globe building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in City of Globe
Solar Photovoltaic (PV) Permit in other cities
Compare solar photovoltaic (pv) permit fees across Arizona →
Look up this fee in a different city →
Now live
Build your City of Globe project checklist
Describe your project once and get every permit, document, and fee it triggers in City of Globe — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →