Skip to main content
PermitBase

Mechanical / HVAC Permit (OTC / Stand-Alone) in City of Globe, Arizona

Required for HVAC and mechanical equipment installation in Globe, governed by the 2021 IMC as adopted and amended by the City. Ducted and non-ducted HVAC/evaporative-cooler installs are flat-fee OTC permits (residential and commercial rates differ); wood stoves are a separate flat OTC fee; larger-scope mechanical work is a Stand-Alone Mechanical Permit billed as a percentage of the Building Permit Fee Table.

Verified 2026-07-06 · Source

When you need this permit

  • Mechanical permit required for installation, replacement, or relocation of HVAC/evaporative-cooling equipment and wood stoves
  • Governed by the 2021 IMC as adopted by the City of Globe, including adopted Appendix A (Chimney Connector Pass-Throughs)
  • OTC fee schedule separately prices ducted vs. non-ducted systems, and residential vs. commercial
  • Apply via the CitizenServe online portal (OTC Mechanical Permit or Stand-Alone Mechanical Permit application types) or in person at Globe City Hall

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Stand-Alone Mechanical PermitCity of Globe Fee Schedule Resolution No. 1904, Exhibit A, Stand Alone Permits — Mechanical Permit Fee Table 1-F
5% of the Building Permit Fee Table (Table 1-A, valuation-based), plus a $30 administrative fee
OTC HVAC/Evap Cooler With Ducting — ResidentialCity of Globe Fee Schedule Resolution No. 1904, Exhibit A, OTC Permits section
$170
OTC HVAC/Evap Cooler With Ducting — CommercialCity of Globe Fee Schedule Resolution No. 1904, Exhibit A, OTC Permits section
$240
OTC HVAC/Evap Cooler Without Ducting — ResidentialCity of Globe Fee Schedule Resolution No. 1904, Exhibit A, OTC Permits section
$100
OTC HVAC/Evap Cooler Without Ducting — CommercialCity of Globe Fee Schedule Resolution No. 1904, Exhibit A, OTC Permits section
$170
OTC Wood StovesCity of Globe Fee Schedule Resolution No. 1904, Exhibit A, OTC Permits section
$100

Review timeline

Plan reviewCity of Globe’s published plan-review target
15–15 business days

How long did your Mechanical / HVAC Permit (OTC / Stand-Alone) permit actually take in City of Globe?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Ductwork and equipment placement before walls closed (ducted systems)

  2. 2

    Final

    Equipment operational, clearances verified

See the full City of Globe inspection guide — scheduling & re-inspection fees →

Tips

  • The City of Globe's Plan Submittal and Review page publishes a real 15-working-day residential plan review timeframe, which applies to mechanical/HVAC permits requiring plan review. Source: City of Globe Plan Submittal and Review page (globeaz.gov/o/cog/page/plan-submittal-and-review).
  • The OTC fee schedule distinguishes ducted from non-ducted systems and residential from commercial — a residential non-ducted evaporative cooler ($100) is roughly half the fee of a residential ducted HVAC system ($170).

Frequently asked questions

City of Globe requires a mechanical / hvac permit (otc / stand-alone) for: Mechanical permit required for installation, replacement, or relocation of HVAC/evaporative-cooling equipment and wood stoves; Governed by the 2021 IMC as adopted by the City of Globe, including adopted Appendix A (Chimney Connector Pass-Throughs); OTC fee schedule separately prices ducted vs. non-ducted systems, and residential vs. commercial; Apply via the CitizenServe online portal (OTC Mechanical Permit or Stand-Alone Mechanical Permit application types) or in person at Globe City Hall. If your project isn't listed, confirm with City of Globe Building Safety Department at 928-425-7146 ext. 219 before starting work.

For a residential system with ducting, $170 (OTC flat fee); without ducting, $100. Commercial systems are $240 (ducted) or $170 (non-ducted). Source: City of Globe Fee Schedule Resolution No. 1904, OTC Permits section.

City of Globe's published plan-review target for a mechanical / hvac permit (otc / stand-alone) is 15–15 business days.

You'll need: Mechanical Permit Application (CitizenServe: OTC or Stand-Alone Mechanical Permit). See the required-documents checklist on this page for details on each.

City of Globe requires 2 inspection(s) for a mechanical / hvac permit (otc / stand-alone), in order: Rough-In, Final. Schedule each through City of Globe Building Safety Department (928-425-7146 ext. 219).

Apply through City of Globe Building Safety Department at Globe City Hall, 150 N. Pine Street, Globe, AZ 85501. Phone: 928-425-7146 ext. 219, email: kestrada@globeaz.gov. Office hours: Permit Technician: Katrina Estrada, (928) 425-7146 ext. 219. Building Inspector: Gary Grimes, (928) 961-0158. Fax: 928-425-4820. Specific published office hours were not found on the City's live 'How to Obtain Permits' page as of July 2026 — City Hall is located at 150 N. Pine Street, Globe, AZ 85501. Applications may be submitted in person at City Hall or online via the City's CitizenServe portal (citizenserve.com/globeaz, installation ID 469), which lists permit-specific application types (Building Permit - New Construction, Stand-Alone Building/Electrical/Mechanical/Plumbing, OTC Electrical/Mechanical/Plumbing/Demolition, Photovoltaic, Pool and Spa, Manufactured Home, Sign, Demolition, Certificate of Occupancy, Temporary CO, and others).. Official information: https://www.globeaz.gov/o/cog/page/how-to-obtain-permits.

City of Globe, Arizona has adopted: Arizona has NO statewide mandatory building code for general construction — code adoption is a per-jurisdiction (city/town/county) authority under state enabling statutes (A.R.S. § 9-802 for municipal adoption by reference). The City of Globe independently adopts and administers its own construction codes through its Building Safety Department; it does not defer to Gila County for permitting within city limits. Source: City of Globe Ordinance No. 889 (adopted October 22, 2024), Section 1 and Exhibit A, Section 12-1-4(A).; As of a 2025 industry directory listing (Arizona Building Officials/AZBO), Globe was shown still using the 2003 International Codes and 2002 NEC — this research independently confirmed via the City's own Ordinance No. 889 that Globe has SINCE UPDATED: Ordinance No. 889, adopted by the Mayor and Council on October 22, 2024 (effective per A.R.S. § 9-812, 30 days after publication/posting), repealed the former Article 12-1 'Building Safety Code' and Article 5-2 'Fire Prevention Code' in their entirety and adopted by reference the 2021 edition of the International Building, Residential, Mechanical, Plumbing, Fuel Gas, Energy Conservation, Fire, Property Maintenance, and Existing Building Codes (all ICC), plus the 2021 International Swimming Pool and Spa Code, together with the 2020 National Electrical Code (NFPA 70) — each with City of Globe local amendments. The prior 2003 I-Codes/2002 NEC citation in the AZBO directory is confirmed STALE as of this update; 2021 ICC/2020 NEC is the current, verified code cycle. Source: City of Globe Ordinance No. 889, Recitals and Exhibit A, Section 2 (adopted 10/22/2024, on file at globeaz.gov).; 2021 International Building Code (IBC), published by the International Code Council, Inc., adopted by reference with City of Globe amendments (Ordinance 889, Exhibit A §12-1-8), including adopted Appendix C (Group U — Agricultural Buildings), Appendix F (Rodent Proofing), Appendix H (Signs), and Appendix I (Patio Covers). Exception: detached one- and two-family dwellings and townhouses not more than three stories above grade with a separate means of egress, and their accessory structures, comply with the IRC instead. Source: City of Globe Ordinance No. 889, Exhibit A, Section 12-1-8.; 2021 International Residential Code (IRC) for One- and Two-Family Dwellings, published by ICC, adopted by reference with City of Globe amendments (Ordinance 889, Exhibit A §12-1-9), including adopted Appendices AA, AB, AC, AE (Manufactured Housing Used As Dwellings), AG, AH (Patio Covers), AJ (Existing Buildings and Structures), AQ (Tiny Homes), AU (Cob/Monolithic Adobe Construction), and AW (3D-Printed Building Construction). Source: City of Globe Ordinance No. 889, Exhibit A, Section 12-1-9.; 2021 International Mechanical Code (IMC), adopted by reference with City of Globe amendments, including Appendix A (Chimney Connector Pass-Throughs). Source: City of Globe Ordinance No. 889, Exhibit A, Section 12-1-10.; 2021 International Plumbing Code (IPC), adopted by reference with City of Globe amendments, including Appendix C (Structural Safety 150) and Appendix E (Sizing of Water Piping Systems). Source: City of Globe Ordinance No. 889, Exhibit A, Section 12-1-11.; 2021 International Fuel Gas Code (IFGC), adopted by reference with City of Globe amendments, including Appendices A, B, and C (gas piping sizing and venting systems). Source: City of Globe Ordinance No. 889, Exhibit A, Section 5-1-12 (numbered within Exhibit A as shown in the ordinance).; 2020 National Electrical Code (NEC / NFPA 70), published by the National Fire Protection Association, adopted by reference with limited City of Globe amendments (garage receptacle placement under Article 210.52(G); equipment grounding conductor types under Article 250.118). Source: City of Globe Ordinance No. 889, Exhibit A, Section 12-1-13.; 2021 International Energy Conservation Code (IECC), adopted by reference with City of Globe amendments, including Appendix CB (Solar Ready Zone — Commercial); Climate Zone 2 Maximum Energy Rating Index changed from 52 to 64; RESNET third-party testing/inspection protocol adopted for building envelope, air leakage, and duct tightness testing. Source: City of Globe Ordinance No. 889, Exhibit A, Section 12-1-14.; 2021 International Fire Code (IFC), adopted by reference as the City's uniform fire code with City of Globe amendments, including adopted Appendices B, C, D, E, F, G, H, I, and L; administered by the Globe Fire Department Fire Code Official/Fire Marshal, with the Building Official having equal enforcement authority. Source: City of Globe Ordinance No. 889, Exhibit A, Section 12-1-15.; 2021 International Property Maintenance Code (IPMC), adopted by reference with City of Globe amendments, including Appendix A (Boarding Standards). Source: City of Globe Ordinance No. 889, Exhibit A, Section 12-1-16.; 2021 International Existing Building Code (IEBC), adopted by reference with City of Globe amendments, including Appendix A1 (Seismic Strengthening Provisions for Unreinforced Masonry Bearing Wall Buildings) and Appendix A3 (Prescriptive Seismic Strengthening for Cripple Walls/Sill Plate Anchorage of Light Wood-Frame Residential Buildings). Source: City of Globe Ordinance No. 889, Exhibit A, Section 12-1-17.; 2021 International Swimming Pool and Spa Code (ISPSC), adopted by reference with City of Globe amendments; swimming pool, spa, and hot tub enclosures and safety devices must additionally comply with Arizona Revised Statutes § 36-1681 and Arizona Administrative Code Title 18, Chapter 5 for public/semi-public pools, whichever standard is more restrictive. Source: City of Globe Ordinance No. 889, Exhibit A, Sections 12-1-18 and 101.4.11 (IBC amendment).; ICC A117.1 Accessibility standard, applied together with Arizona Attorney General Administrative Rules R10-3-401 through R10-3-404 (2010 ADA Standards for Accessible Design) and A.R.S. §§ 41-1492 through 41-1492.12 — whichever standard provides the greatest degree of accessibility governs. Source: City of Globe Ordinance No. 889, Exhibit A, Section 1101/1102 (IBC Chapter 11 amendment).; Manufactured homes, mobile homes, factory-built buildings, and Park Model living units require a City of Globe permit for site placement, foundation, skirting/perimeter enclosure, and utility connection (IRC Appendix AE as amended); statewide construction/installation standards for factory-built structures are separately regulated by the Arizona Department of Fire, Building and Life Safety, Office of Manufactured Housing (A.R.S. § 41-4001 et seq.). Source: City of Globe Ordinance No. 889, Exhibit A (IRC Appendix AE amendment); Fee Schedule Resolution No. 1904, Exhibit A (Manufactured Homes fee section).. Local amendments apply — see the City of Globe overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the City of Globe building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.