Certificate of Occupancy (including Change of Use) in City of Globe, Arizona
Globe's CitizenServe portal and Fee Schedule list 'Certificate of Occupancy' and 'Temporary CO' as distinct permit application types, issued by the Building Safety Department (Building sign-off) together with the Fire Department (Fire sign-off), required before a building or portion of a building may be occupied, or before an existing building's occupancy classification or use is changed, under the City's adopted 2021 International Building Code (Section 111) and International Existing Building Code (Change of Occupancy provisions), as amended by Ordinance No. 889. Globe has NO separately named 'Change of Use' or 'Change of Occupancy' permit product in its CitizenServe portal or fee schedule — confirmed via the City's own published permit-category list and a full-text search of Resolution 1904 — so a change in occupancy classification or tenant use of an existing building is processed through this same Certificate of Occupancy application and review (plus whatever Building/Stand-Alone permit review is separately triggered for any tenant-improvement work the new use requires).
Verified 2026-07-23 · Source
When you need this permit
- A Certificate of Occupancy is required before any building, structure, or portion thereof is used or occupied, and before any change is made in an existing building's occupancy classification or use, per the City's adopted 2021 IBC (Section 111) and IEBC Change of Occupancy provisions, as amended by Ordinance No. 889
- Application is submitted via the CitizenServe portal (Certificate of Occupancy application type) or in person at City Hall (150 N. Pine Street)
- Both a Building Department C of O — Building sign-off and a Building Department C of O — Fire sign-off are required and billed as two separate $70 fee line items under Resolution 1904
- Where a project or tenant space is not fully complete, a Temporary Certificate of Occupancy (TCO) may be issued instead, tiered in 30/60/90-day increments with escalating fees for commercial versus residential uses
- Globe's CitizenServe portal and fee schedule have no separately named 'Change of Use' or 'Change of Occupancy' permit product — confirmed via the City's own permit-category listing and a full-text search of Resolution 1904; a change in an existing building's occupancy classification or tenant use is processed through this same Certificate of Occupancy application, plus any Building/Stand-Alone permit review separately required for associated tenant-improvement work
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Final Building Inspection
Building Official verifies the completed work or existing space meets all applicable building code requirements for the certificate/change of use being sought
- 2
Final Fire Inspection
Fire Marshal sign-off confirming fire/life-safety code compliance, billed separately as the Fire C of O fee
See the full City of Globe inspection guide — scheduling & re-inspection fees →
Tips
- Budget for both the $70 Building C of O fee and the separate $70 Fire C of O fee — Globe bills these as two distinct line items, and both are required before occupancy.
- If your space isn't fully finished out yet, ask about a Temporary C of O rather than waiting for full completion — fees start at $300 (residential, first 30 days) or $500 (commercial, first 30 days) and step up if extended to 60 or 90 days.
- Globe has no distinct 'Change of Use' or 'Change of Occupancy' permit product — switching a building's use or occupancy classification runs through this same Certificate of Occupancy process, plus any Stand-Alone/Building permit review separately triggered by tenant-improvement work the new use requires.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the City of Globe building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in City of Globe
Certificate of Occupancy (including Change of Use) in other cities
Compare certificate of occupancy (including change of use) fees across Arizona →
Look up this fee in a different city →
Now live
Build your City of Globe project checklist
Describe your project once and get every permit, document, and fee it triggers in City of Globe — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →