EV Charger / EVSE Permit in Unincorporated Mohave County, Arizona

Mohave County does not publish a distinct EV charger/EVSE fee line. Installing electric vehicle charging equipment in unincorporated Mohave County requires a standard Electrical Permit under the adopted 2017 NEC (Ordinance 2021-03), billed under the county's itemized Unit Fee Schedule (Ordinance 2018-02): an Electrical Permit Issuance Fee plus per-item unit fees for the new circuit/receptacle and, if the installation requires a service upgrade, the applicable service-size fee tier. Residential service repairs/upgrades up to 200 amps — the typical case for a Level 2 EV charger — are processed over-the-counter without formal plan review.

Verified 2026-07-20 · Source

When you need this permit

  • Electrical Permit required for EV charger/EVSE circuit installation in unincorporated Mohave County, under the adopted 2017 NEC (Ordinance 2021-03)
  • Apply via the Building Permit Application Packet at the Building Division office, 3250 E. Kino Avenue, Kingman, or through the county's online permit system
  • Residential service repairs/upgrades up to 200 amps (the typical case for adding an EV charger circuit) are processed over-the-counter
  • Any electrical plans for services of 600 amperes or above must be sealed by an Arizona-licensed registrant; a Qualified Contractor is required for services above 400 amperes
  • No distinct EV charger/EVSE fee line, expedited timeline, or SolarAPP+-style instant-permitting platform was found published by the county as of this review

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical Permit Issuance Fee (plus unit fees below)Mohave County Fee Schedule (Ordinance 2018-02, Rev. 11/01/22) — same base issuance fee documented on this jurisdiction's Electrical Permit entry; no distinct EV charger/EVSE fee line is published.
$39.00
Service 600V or less, up to 200 amps (typical EV charger circuit/service)Mohave County Fee Schedule, Unit Fee Schedule.
$31.85
Receptacles, switches, fixtures, light outletsMohave County Fee Schedule, Unit Fee Schedule — applies to the EVSE receptacle/outlet itself if billed as a fixture rather than under the service fee.
$1.50 each
Service 600V or less, over 200 to 1,000 ampsMohave County Fee Schedule, Unit Fee Schedule — applicable if the EV charger installation requires a larger service upgrade.
$64.35

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Unincorporated Mohave County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In / Service Inspection

    EVSE circuit and any service/panel work inspected before wall cover or energizing, per adopted 2017 NEC

  2. 2

    Final

    EVSE equipment mounting, bonding/grounding, and operation complete

See the full Unincorporated Mohave County inspection guide — scheduling & re-inspection fees →

Tips

  • A typical residential Level 2 EV charger circuit (200-amp service or less) can be processed over-the-counter at the Kingman Building Division office — no lengthy plan review needed for this common case.
  • Budget for the $39 Electrical Permit Issuance Fee plus the applicable unit fee(s) for the new circuit/service — Mohave County itemizes electrical fees by component rather than charging a single flat EV charger fee.

Frequently asked questions

Unincorporated Mohave County requires an ev charger / evse permit for: Electrical Permit required for EV charger/EVSE circuit installation in unincorporated Mohave County, under the adopted 2017 NEC (Ordinance 2021-03); Apply via the Building Permit Application Packet at the Building Division office, 3250 E. Kino Avenue, Kingman, or through the county's online permit system; Residential service repairs/upgrades up to 200 amps (the typical case for adding an EV charger circuit) are processed over-the-counter; Any electrical plans for services of 600 amperes or above must be sealed by an Arizona-licensed registrant; a Qualified Contractor is required for services above 400 amperes; No distinct EV charger/EVSE fee line, expedited timeline, or SolarAPP+-style instant-permitting platform was found published by the county as of this review. If your project isn't listed, confirm with Mohave County Development Services Department — Building Division at 928-757-0903 before starting work.

No distinct EV charger/EVSE fee line item is published. Installation is billed as a standard Electrical Permit: a $39 issuance fee plus itemized unit fees for the circuit/service (e.g., $31.85 for a service up to 200 amps). Source: Mohave County Fee Schedule Spreadsheet (Ordinance 2018-02).

Unincorporated Mohave County does not publish a plan-review timeline for this permit. Contact Mohave County Development Services Department — Building Division at 928-757-0903 for current turnaround.

You'll need: Building Permit Application Packet (PDF). See the required-documents checklist on this page for details on each.

Unincorporated Mohave County requires 2 inspection(s) for an ev charger / evse permit, in order: Rough-In / Service Inspection, Final. Schedule each through Mohave County Development Services Department — Building Division (928-757-0903).

Apply through Mohave County Development Services Department — Building Division at 3250 E. Kino Avenue, Kingman, AZ 86409 (mailing: PO Box 7000, Kingman, AZ 86402-7000). Phone: 928-757-0903. Office hours: Mon–Fri 7:00 AM – 6:00 PM, closed County-designated holidays. Development Services Director: Scott Holtry. Chief Building Official: Trevor Bies. Contact form at https://forms.mohave.gov/Departments/Contact-Development-Services. Note: the Development Services/Building Division office is physically located at 3250 E. Kino Avenue — distinct from the Mohave County Administration Building at 700 W. Beale Street, which houses the Board of Supervisors and other county offices; both addresses appear in county materials and were independently cross-checked to confirm the Building Division's own location.. Official information: https://www.mohave.gov/departments/development-services/building-division/.

Unincorporated Mohave County, Arizona has adopted: 2018 International Building Code (IBC) — adopted by Mohave County Ordinance No. 2021-03 (June 7, 2021), amended through July 15, 2024, for the unincorporated areas of the county per Resolution 2007-249 (adopted May 7, 2007); 2018 International Residential Code (IRC) — adopted by Ordinance 2021-03, with Appendices C, E, G, H, J, M, O, P, and Q (Tiny Houses); 2018 International Fire Code (IFC) — adopted by Ordinance 2021-03; 2018 International Mechanical Code (IMC) — adopted by Ordinance 2021-03; 2018 International Plumbing Code (IPC) — adopted by Ordinance 2021-03; 2017 National Electrical Code (NEC), N.F.P.A. 70 — adopted by Ordinance 2021-03; 2018 International Fuel Gas Code (IFGC) — adopted by Ordinance 2021-03; 2018 International Existing Building Code (IEBC) — adopted by Ordinance 2021-03, with Appendix A (Seismic Retrofit Guidelines); 2018 International Property Maintenance Code (IPMC) — adopted by Ordinance 2021-03, with Appendix A (Boarding Standard); 2018 International Swimming Pool and Spa Code (ISPSC) — adopted by Ordinance 2021-03, with Arizona-specific barrier amendments citing A.R.S. § 36-1681; 2018 International Energy Conservation Code (IECC) — adopted by Ordinance 2021-03; residential energy provisions are NOT taken from IECC but instead from IRC Chapter 11 (RE) Energy Efficiency, 2018 Edition. Local amendments apply — see the Unincorporated Mohave County overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Mohave County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.