EV Charger / EVSE Permit in Unincorporated Mohave County, Arizona
Mohave County does not publish a distinct EV charger/EVSE fee line. Installing electric vehicle charging equipment in unincorporated Mohave County requires a standard Electrical Permit under the adopted 2017 NEC (Ordinance 2021-03), billed under the county's itemized Unit Fee Schedule (Ordinance 2018-02): an Electrical Permit Issuance Fee plus per-item unit fees for the new circuit/receptacle and, if the installation requires a service upgrade, the applicable service-size fee tier. Residential service repairs/upgrades up to 200 amps — the typical case for a Level 2 EV charger — are processed over-the-counter without formal plan review.
Verified 2026-07-20 · Source
When you need this permit
- Electrical Permit required for EV charger/EVSE circuit installation in unincorporated Mohave County, under the adopted 2017 NEC (Ordinance 2021-03)
- Apply via the Building Permit Application Packet at the Building Division office, 3250 E. Kino Avenue, Kingman, or through the county's online permit system
- Residential service repairs/upgrades up to 200 amps (the typical case for adding an EV charger circuit) are processed over-the-counter
- Any electrical plans for services of 600 amperes or above must be sealed by an Arizona-licensed registrant; a Qualified Contractor is required for services above 400 amperes
- No distinct EV charger/EVSE fee line, expedited timeline, or SolarAPP+-style instant-permitting platform was found published by the county as of this review
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In / Service Inspection
EVSE circuit and any service/panel work inspected before wall cover or energizing, per adopted 2017 NEC
- 2
Final
EVSE equipment mounting, bonding/grounding, and operation complete
See the full Unincorporated Mohave County inspection guide — scheduling & re-inspection fees →
Tips
- A typical residential Level 2 EV charger circuit (200-amp service or less) can be processed over-the-counter at the Kingman Building Division office — no lengthy plan review needed for this common case.
- Budget for the $39 Electrical Permit Issuance Fee plus the applicable unit fee(s) for the new circuit/service — Mohave County itemizes electrical fees by component rather than charging a single flat EV charger fee.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Mohave County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Mohave County
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Arizona →
Look up this fee in a different city →
Related guides
Now live
Build your Unincorporated Mohave County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Mohave County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →