This is PermitBase’s published record for Page as of 2026-07-06. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Page building permits
VerifiedPage, Arizona — as published 2026-07-06.
Verified 2026-07-06 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new single-family and two-family dwelling construction in the City of Page. Reviewed against the 2018 IRC as adopted by the City. Applications are submitted via the City of Page Building Permit Application (paper) or the online iWorQ portal, and single-family dwellings are reviewed directly by the Chief Building Official rather than going through the commercial Site Plan Review Committee process.
Verified 2026-07-06 · Source
Requirements
- Building permit required for new single-family and two-family dwelling construction within Page city limits
- Plans must comply with the 2018 IRC as adopted by the City of Page and local design criteria (115 MPH wind, Exposure C; Seismic Zone 2, Site Class D or per geotechnical report; 18-inch frost depth; 20 PSF snow load, no reduction)
- Site/plot plan required showing property dimensions, distances between existing/proposed structures, distance from building to property lines, utility hook-up locations, street identification, and north arrow
- House plans required: foundation plan with details, electrical plans with service panel location/size, fully dimensioned floor plan, equipment locations, floor framing (all levels), roof framing, elevation drawings, cross-sections, deck framing details, and livable square footage
- Two sets of truss calculations from the manufacturer required
- Two stamped sets of engineering specifications by an Arizona-registered engineer required where applicable
- A building permit may not be issued prior to receiving verbal approval from Coconino County Health Department
- Owner/Builder permits are allowed for residential projects only; any hired contractor must be licensed per A.R.S. § 32-1169
- Wood sill-plates on concrete must be pressure-treated or foundation-grade redwood; footing reinforcing steel cannot be tied to metal grade stakes due to corrosive soil
Required documents
- RequiredCity of Page Building Permit ApplicationOfficial application form listing property/owner info, contractor/subcontractor licensing, valuation, and required approvals (Fire Dept, Zoning, Public Works, Utilities, PUE, County Health)
- RequiredSite/Plot PlanProperty dimensions, structure setbacks, utility hook-up locations, street ID and north arrow
- RequiredHouse Plans (Foundation, Electrical, Floor, Framing, Elevations)Fully dimensioned construction drawings per Building Safety Department residential plan review requirements
- RequiredTruss Calculations (2 sets)Manufacturer-prepared truss calculation sets
- OptionalEngineering Specifications (2 stamped sets)Arizona-registered engineer stamped specifications, where required by scope
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Table 1-A (Total Valuation) | $23.50 (valuation $1-$500); $23.50 + $3.05 per additional $100 (or fraction) to $2,000; $69.25 + $14.00 per additional $1,000 (or fraction) to $25,000; $391.25 + $10.10 per additional $1,000 to $50,000; $643.75 + $7.00 per additional $1,000 to $100,000; $993.75 + $5.60 per additional $1,000 to $500,000; $3,233.75 + $4.75 per additional $1,000 to $1,000,000; $5,608.75 + $3.65 per additional $1,000 above $1,000,000 | City of Page Consolidated Fee Schedule (Resolution 1296-23, adopted 1-25-2023), Building Department — Table 1-A, Building Permit Fees, p.4 |
| Plan Review Fee | 65% of the calculated Building Permit Fee | City of Page Consolidated Fee Schedule, p.5 note: 'Plan Review Fees: When submittal documents are required, a plan review fee shall be paid at the time of submitting documents for plan review. Said plan review shall be 65 percent of the building permit fee.' |
| Additional Plan Review (changes/additions/revisions to plans) | $47.00 per hour | City of Page Consolidated Fee Schedule, p.4, Other Inspections and Fees item 4 |
| Re-inspection Fee | $47.00 per hour (minimum charge one-half hour for inspections with no specifically indicated fee; $54.00 per hour cited for other inspections/fees under item 6) | City of Page Consolidated Fee Schedule, p.4, Other Inspections and Fees items 2, 3, and 6 |
| Inspection Outside Normal Business Hours | $47.00 per hour, 2-hour minimum charge | City of Page Consolidated Fee Schedule, p.4, Other Inspections and Fees item 1 |
Residential Addition / Remodel Permit
VerifiedRequired for room additions, remodels, and alterations to existing one- and two-family dwellings in Page. Reviewed against the 2018 IRC as adopted by the City, billed on the same Table 1-A valuation basis as new construction.
Verified 2026-07-06 · Source
Requirements
- Building permit required for room additions, remodels, and alterations affecting structural or life-safety elements
- Detached accessory structures for storage that are one-story and under 120 sq ft do not require a permit, but zoning setback rules may still apply
- Interior finish work alone (painting, papering, tiling, carpeting, cabinets, countertops) is exempt from a permit
- Plans must comply with City of Page local design criteria (115 MPH wind, Exposure C; Seismic Zone 2; 18-inch frost depth; 20 PSF snow load)
- Site/plot plan showing existing structure, addition footprint, and setbacks required
- Owner/Builder permits allowed for residential projects only; hired contractors must be licensed per A.R.S. § 32-1169
Required documents
- RequiredCity of Page Building Permit ApplicationOfficial application form
- RequiredSite/Plot PlanShowing existing structure, addition footprint, and setbacks
- RequiredConstruction DrawingsFoundation, framing, electrical, and elevation drawings for the addition/remodel scope
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Table 1-A (Total Valuation) | $23.50 (valuation $1-$500) through $5,608.75 + $3.65 per additional $1,000 above $1,000,000 (same Table 1-A schedule as new construction) | City of Page Consolidated Fee Schedule (Resolution 1296-23), Building Department — Table 1-A, p.4 |
| Plan Review Fee | 65% of the calculated Building Permit Fee | City of Page Consolidated Fee Schedule, p.5 |
Electrical Permit
VerifiedRequired for electrical installation, alteration, or repair work in Page, governed by the 2017 National Electrical Code (NEC) as adopted by the City. Uses a dedicated fee formula separate from the general Table 1-A valuation schedule.
Verified 2026-07-06 · Source
Requirements
- Electrical permit required for electrical installation, alteration, or repair work
- Governed by the 2017 NEC (Chapters 1-9, Annexes A-E) as adopted by the City of Page
- Electrical contractor information (name, address, contact, phone, license #) required on the Building Permit Application
- Apply via paper Building Permit Application or the online iWorQ Building Permit Application Portal
Required documents
- RequiredCity of Page Building Permit ApplicationOfficial application form listing contractor licensing information for the electrical subcontractor
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit Fee — Based on Valuation of Construction Costs | $27.00 for the first $500.00 of valuation; plus $3.75 for each additional $1,000.00 of valuation of construction costs | City of Page Consolidated Fee Schedule (Resolution 1296-23, adopted 1-25-2023), Building Department — Table 1-A page, item 5, p.4 |
| Plan Review Fee (where plan review is required) | 65% of the calculated permit fee | City of Page Consolidated Fee Schedule, p.5 |
Plumbing Permit
VerifiedRequired for plumbing installation, alteration, or repair work in Page, governed by the 2018 International Plumbing Code (IPC) as adopted by the City, including local backwater-valve and grease-interceptor amendments.
Verified 2026-07-06 · Source
Requirements
- Plumbing permit required for installation, alteration, or repair of plumbing systems and fixtures
- Governed by the 2018 IPC (Chapters 1-15, with Appendix E) as adopted by the City of Page
- Backwater valves required on all sewer lines per City Code Section 11-4-1(B); grease interceptors required per City Code Section 11-5-2
- A building permit (including plumbing scope) may not be issued prior to receiving verbal approval from Coconino County Health Department where onsite wastewater is involved
Required documents
- RequiredCity of Page Building Permit ApplicationOfficial application form listing plumbing subcontractor licensing information
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Table 1-A (Total Valuation) | $23.50 (valuation $1-$500) through $5,608.75 + $3.65 per additional $1,000 above $1,000,000 | City of Page Consolidated Fee Schedule (Resolution 1296-23), Building Department — Table 1-A, p.4. No separately itemized plumbing-only fee line was found; plumbing work is billed on the same general valuation schedule as other Building Department permits. |
| Plan Review Fee (where plan review is required) | 65% of the calculated permit fee | City of Page Consolidated Fee Schedule, p.5 |
Mechanical / HVAC Permit
VerifiedRequired for heating, ventilation, and air conditioning installations in Page, governed by the 2018 International Mechanical Code (IMC) as adopted by the City.
Verified 2026-07-06 · Source
Requirements
- Mechanical permit required for installation, replacement, or relocation of HVAC equipment, furnaces, and ventilation systems
- Governed by the 2018 IMC (Chapters 1-15, with Appendix Chapters A and B) as adopted by the City of Page
- 2018 International Fuel Gas Code (Chapters 1-8, Appendix A, B, C) governs associated gas-fired equipment and piping
Required documents
- RequiredCity of Page Building Permit ApplicationOfficial application form listing mechanical subcontractor licensing information
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Table 1-A (Total Valuation) | $23.50 (valuation $1-$500) through $5,608.75 + $3.65 per additional $1,000 above $1,000,000 | City of Page Consolidated Fee Schedule (Resolution 1296-23), Building Department — Table 1-A, p.4. No separately itemized mechanical/HVAC-only fee line (e.g., a flat AC-replacement fee) was found; mechanical work is billed on the same general valuation schedule as other Building Department permits. |
| Plan Review Fee (where plan review is required) | 65% of the calculated permit fee | City of Page Consolidated Fee Schedule, p.5 |
Re-Roofing Permit
VerifiedRequired for residential and commercial re-roofing in Page. Governed by the 2018 IBC/IRC roofing provisions, with roof drain sizing based on the City's local 3-inch-per-hour rainfall design criterion for flat roofs.
Verified 2026-07-06 · Source
Requirements
- Building permit required for re-roofing (no published permit-exempt re-roofing scope was found on the City's Building Safety Department page, unlike the exemptions published for accessory structures, fences, and interior finish work)
- Roof drain sizing for flat roofs must be calculated using the City's local 3 inch per hour rainfall design criterion
- Plans/material listing showing existing framing, proposed material, and drainage slope required for plan review where applicable
Required documents
- RequiredCity of Page Building Permit ApplicationOfficial application form
- RequiredRoof Plan / Material ListingExisting framing, proposed roofing material, and drainage slope calculations (3 in/hr rainfall design for flat roofs)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Table 1-A (Total Valuation) | $23.50 (valuation $1-$500) through $5,608.75 + $3.65 per additional $1,000 above $1,000,000 | City of Page Consolidated Fee Schedule (Resolution 1296-23), Building Department — Table 1-A, p.4. No separately itemized re-roofing-only fee line was found; re-roofing is billed on the general valuation schedule. |
| Plan Review Fee (where plan review is required) | 65% of the calculated permit fee | City of Page Consolidated Fee Schedule, p.5 |
Residential Solar Photovoltaic (PV) Permit
VerifiedRequired for installation of rooftop residential solar photovoltaic systems in Page. No dedicated streamlined PV procedure or PV-specific fee schedule was found published by the City; systems are subject to the state-law baseline (A.R.S. § 9-468) and the City's standard Building/Electrical Permit process under the 2018 IBC/IRC and 2017 NEC.
Verified 2026-07-06 · Source
Requirements
- Residential PV systems must meet the minimum standards set by Arizona Revised Statutes § 9-468 (Solar construction permits; standards; definition), which all Arizona municipalities must follow at minimum for residential solar permit review
- Construction plans showing PV system location, roof plan and elevation views, panel mounting/racking details, and a one-line or three-line electrical diagram are required per the state-law baseline
- Electrical work must comply with the 2017 NEC as adopted by the City of Page
- No City of Page-specific streamlined review procedure, dedicated PV checklist, or PV-specific fee schedule (comparable to some other Arizona cities' dedicated residential PV procedures) was found published on the City's Building and Safety Department page or in the Consolidated Fee Schedule as of July 2026
Required documents
- RequiredCity of Page Building Permit ApplicationOfficial application form, submitted with construction/electrical plans for the PV system
- RequiredPV Construction Plans (roof plan, elevation, racking/mounting details, electrical diagram)Minimum plan content required under A.R.S. § 9-468 for residential solar permit review
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Table 1-A (Total Valuation) and/or Electrical Permit Fee (valuation-based) | Building Permit Fee per Table 1-A ($23.50 for valuation $1-$500 up through $5,608.75 + $3.65 per additional $1,000 above $1,000,000) and/or Electrical Permit Fee ($27.00 for the first $500 + $3.75 per additional $1,000 of valuation) | City of Page Consolidated Fee Schedule (Resolution 1296-23), Building Department — Table 1-A, p.4. No dedicated 'Photovoltaic System' fee line was found in the published fee schedule; a residential PV system is billed under the general Building Permit Fee and/or the Electrical Permit Fee formula depending on how the City classifies the work at intake. |
| Plan Review Fee (where plan review is required) | 65% of the calculated permit fee | City of Page Consolidated Fee Schedule, p.5 |
Demolition Permit
VerifiedRequired for demolition of any residential or commercial structure in the City of Page, processed through the standard Building Permit Application. No demolition-specific published fee line was found; demolition is billed on the same Table 1-A valuation basis as other Building Department permits.
Verified 2026-07-06 · Source
Requirements
- Building permit required before demolishing a residential or commercial structure within Page city limits (application 'Class of Work' includes a 'Remove' option on the standard Building Permit Application)
- Property owner and general contractor information required on the Building Permit Application
- Coordination with utility providers (Water/Sewer: 928-645-4214; Electrical/PEU: 928-645-2419; Propane/SemStream: 928-645-2391) for service termination is expected as part of standard demolition practice, though no City of Page-published demolition-specific checklist was found
- Call Arizona Blue Stake (1-800-STAKE-IT / 811) before any excavation, per the notice printed on the City of Page Building Permit Application
Required documents
- RequiredCity of Page Building Permit ApplicationOfficial application form; select 'Remove' under Class of Work
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Table 1-A (Total Valuation) | $23.50 (valuation $1-$500) through $5,608.75 + $3.65 per additional $1,000 above $1,000,000 | City of Page Consolidated Fee Schedule (Resolution 1296-23), Building Department — Table 1-A, p.4. No separately itemized demolition-only fee line was found; demolition is billed on the general valuation schedule based on the value/scope of the demolition work. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Page building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.