Page building permits
VerifiedDepartment contacts, adopted codes, permit types, fees, and gotchas for Page, Arizona.
Last verified 2026-07-06 · Source · Embed this page’s badge · Version history
Building department
- Address
- Page City Hall, 697 Vista Avenue / P.O. Box 1180, Page, AZ 86040
- Phone
- 928-645-4266
- bslavens@pageaz.gov
- Office hours
- Building Official: Brett Slavens (bslavens@pageaz.gov, 928-645-4266, fax 928-645-4265). Main City line: 928-645-8861. Applications are submitted via the City of Page Building Permit Application (paper form, PO Box 1180 / 697 Vista Avenue) or through the online iWorQ Building Permit Application Portal (pageaz_permit.portal.iworq.net/portalhome/pageaz_permit). Final inspections must be scheduled at least 24 hours in advance, and final inspection/approval is required before occupying any room.
- Website
- Official site
- Permit portal
- Apply online at Page's portal
Inspection guide
See how inspections work in Page — sequence, scheduling & re-inspection fees.
Codes adopted
Arizona has no statewide building code for non-state buildings; codes are adopted locally. According to the International Code Council, codes are adopted locally in Arizona and are predominantly the I-codes, with different cities and counties choosing their own editions and local amendments. The Arizona State Fire Code (adopting the 2018 IFC) applies only to state and county buildings, public and private schools, and non-residential occupancies in areas without a locally adopted fire code — it does not establish a statewide residential or commercial building code floor. Each city and county adopts its own code editions independently, resulting in different I-Code years and amendment sets across jurisdictions. There is no state-mandated minimum edition; enforcement is entirely local. Always confirm the adopted edition and any local amendments with the specific jurisdiction before submitting plans.
- Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of Page runs its own Building Safety Department and independently adopts and administers its own construction codes; it does not defer permitting to Coconino County. Source: City of Page Building and Safety Department page (cityofpage.org/departments/building-and-safety/).
- 2018 International Building Code (IBC), Chapters 1-35, with amendments to Chapter 9 and Appendix Chapters B, H, and I, adopted by the City of Page as its uniform building code. Source: City of Page Building and Safety Department page.
- 2018 International Residential Code (IRC), Chapters 1-44, with Appendix Chapters A, B, C, D, H, and P adopted, governing one- and two-family dwelling construction. Source: City of Page Building and Safety Department page.
- 2018 International Plumbing Code (IPC), Chapters 1-15, with Appendix E adopted. Source: City of Page Building and Safety Department page.
- 2018 International Fuel Gas Code, Chapters 1-8, with Appendix Chapters A, B, and C adopted. Source: City of Page Building and Safety Department page.
- 2018 International Mechanical Code (IMC), Chapters 1-15, with Appendix Chapters A and B adopted. Source: City of Page Building and Safety Department page.
- 2018 International Existing Building Code, Chapters 1-16, with Appendix C adopted. Source: City of Page Building and Safety Department page.
- 2018 International Pool and Spa Code, Chapters 1-11, with Appendix Chapters A, B, C, and D adopted. Source: City of Page Building and Safety Department page.
- 2017 National Electrical Code (NEC), Chapters 1-9, with Annexes A-E adopted (note: the electrical code cycle is one edition behind the 2018 ICC set). Source: City of Page Building and Safety Department page.
- 2012 International Energy Conservation Code (IECC), Chapters 1-6, adopted; governs energy-efficiency requirements for the City of Page. Source: City of Page Building and Safety Department page.
- 2018 International Fire Code (IFC) Chapter 61 adopted specifically for LP Gas regulation, in addition to ANSI Standards 2009 combined with the 2018 IBC. Source: City of Page Building and Safety Department page.
- ICC A117.1 / ANSI Standards 2009 accessibility provisions apply in conjunction with the 2018 IBC, alongside the federal Americans with Disabilities Act (ADA) standards. Source: City of Page Building and Safety Department page.
- Local ordinance amendments layered onto the adopted ICC codes: Ordinance 666-19 amending Chapter 92 for automatic fire sprinkler systems; City Code Article 9-5, Sections 9-5-1 through 9-5-17, regulating wood-burning stoves; City Code Article 11-4-1(B) requiring sewer backwater valves; City Code Article 11-5-2 requiring grease interceptors. Source: City of Page Building and Safety Department page.
- Manufactured homes and factory-built buildings (FBBs) are licensed and permitted through a joint state/City structure: the Arizona Department of Fire, Building and Life Safety (Office of Manufactured Housing) sets manufacturer/installer/retailer licensing and issues State/IGA installation permits (state fee schedule effective July 1, 2022 - June 30, 2023, per City of Page Consolidated Fee Schedule, Building Department - Manufactured Home Fees, pp. 6-7), while the City of Page Building Safety Department handles local site/foundation/utility compliance. Source: City of Page Consolidated Fee Schedule (Resolution 1296-23, adopted 1-25-2023).
- A building permit may not be issued prior to receiving verbal approval from Coconino County Health Department (Page office: 928-608-6108 x13; main office: 928-679-8760) — relevant for projects involving onsite wastewater/septic systems. Source: City of Page Building and Safety Department page.
Permit types & fees
Residential Building Permit (New Construction)
Required for new single-family and two-family dwelling construction in the City of Page. Reviewed against the 2018 IRC as adopted by the City. Applications are submitted via the City of Page Building Permit Application (paper) or the online iWorQ portal, and single-family dwellings are reviewed directly by the Chief Building Official rather than going through the commercial Site Plan Review Committee process.
Residential Addition / Remodel Permit
Required for room additions, remodels, and alterations to existing one- and two-family dwellings in Page. Reviewed against the 2018 IRC as adopted by the City, billed on the same Table 1-A valuation basis as new construction.
Electrical Permit
Required for electrical installation, alteration, or repair work in Page, governed by the 2017 National Electrical Code (NEC) as adopted by the City. Uses a dedicated fee formula separate from the general Table 1-A valuation schedule.
Plumbing Permit
Required for plumbing installation, alteration, or repair work in Page, governed by the 2018 International Plumbing Code (IPC) as adopted by the City, including local backwater-valve and grease-interceptor amendments.
Mechanical / HVAC Permit
Required for heating, ventilation, and air conditioning installations in Page, governed by the 2018 International Mechanical Code (IMC) as adopted by the City.
Re-Roofing Permit
Required for residential and commercial re-roofing in Page. Governed by the 2018 IBC/IRC roofing provisions, with roof drain sizing based on the City's local 3-inch-per-hour rainfall design criterion for flat roofs.
Residential Solar Photovoltaic (PV) Permit
Required for installation of rooftop residential solar photovoltaic systems in Page. No dedicated streamlined PV procedure or PV-specific fee schedule was found published by the City; systems are subject to the state-law baseline (A.R.S. § 9-468) and the City's standard Building/Electrical Permit process under the 2018 IBC/IRC and 2017 NEC.
Demolition Permit
Required for demolition of any residential or commercial structure in the City of Page, processed through the standard Building Permit Application. No demolition-specific published fee line was found; demolition is billed on the same Table 1-A valuation basis as other Building Department permits.
EV Charger / EVSE Permit
The City of Page does not publish a dedicated EV charger/EVSE permit. Installation of a Level 2 EV charging circuit is permitted as electrical work under the City's standard Electrical Permit, governed by the 2017 National Electrical Code as adopted by the City. The City's Consolidated Fee Schedule (Resolution 1296-23) uses a dedicated valuation-based formula for all electrical permits — there is no separate EV-specific line item.
New residential construction activity
New privately-owned residential construction onlyHousing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).
- Latest month (2026-05)
- No data reported
- Trailing 12 months
- 13units
4 of 12 months reported · #63 in Arizona coverage by units
- Year to date (2026 YTD)
- No data reported
- Full year 2025
- 31units
31 buildings · $8M valuation
11 of 12 months reported; Census estimates include imputation
Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Arizona building activity
Tips & gotchas
- Arizona has no statewide mandatory building code — the City of Page independently adopts and amends its own construction codes and runs its own Building Safety Department; it does not defer to Coconino County for permitting within city limits.
- The City of Page's adopted ICC code suite is the 2018 edition (IBC, IRC, IPC, IFGC, IMC, Existing Building Code, Pool and Spa Code) — one cycle behind cities that have moved to 2024 codes — with the National Electrical Code one further edition behind at 2017 NEC, and the International Energy Conservation Code notably older still at 2012 IECC.
- Local design criteria differ meaningfully from lower-desert Arizona cities: Page requires an 18-inch frost depth and a 20 PSF snow load with no reduction (reflecting its higher-elevation Colorado Plateau location), plus 115 MPH wind (Exposure C) and Seismic Zone 2.
- Plan review fee is a flat 65% of the calculated Building Permit Fee (Table 1-A) across permit types, payable at time of submittal where plan review is required — this mirrors the same 65% structure used by other Arizona cities such as Buckeye.
- Electrical permits use their own dedicated fee formula ($27.00 for the first $500 of valuation + $3.75 per additional $1,000) rather than the general Table 1-A schedule used for building, plumbing, mechanical, roofing, and demolition permits.
- A building permit cannot be issued before verbal approval from Coconino County Health Department is received — relevant for any project involving onsite wastewater/septic systems.
- Single-family dwellings are explicitly exempt from the City's Site Plan Review Committee (SPRC) process (Zoning Code § 152.095) — they are reviewed only by the Chief Building Official. The SPRC's 14-day meeting-scheduling requirement applies only to commercial developments (defined to include any residential development larger than a single detached home on a single lot).
- No permit-specific or general residential plan-review turnaround time is published anywhere on the City's official site, fee schedule, zoning ordinance, or building permit application, as of July 2026 — every permit type in this record uses the honest-gap framing with reviewTimelineVerified: false rather than an invented or estimated figure. Call the Building Safety Department (928-645-4266) for a current estimate on any specific project.
- Manufactured homes and factory-built buildings (FBBs) follow a joint state/City fee and licensing structure administered by the Arizona Department of Fire, Building and Life Safety (Office of Manufactured Housing) for state licensing and IGA/State permit fees, layered with City of Page local site/foundation/utility compliance review.
- Owner/Builder permits are allowed for residential projects only; any hired contractor or laborer must be licensed per A.R.S. § 32-1169. Permits become null and void if work is not commenced within 180 days, or if suspended/abandoned for 180 days after commencement.
- No published permit exemption exists for re-roofing (unlike some other Arizona cities that exempt like-for-like single-layer asphalt shingle overlays) — the City's published work-exempt list covers only small accessory structures, low fences, low retaining walls, sidewalks/driveways, interior finish work, shallow pools, playground equipment, and small unsupported awnings.
- No dedicated streamlined residential solar PV permit procedure, checklist, or PV-specific fee line was found published by the City of Page, unlike some other Arizona cities — PV installations fall under the standard Building/Electrical Permit process, subject at minimum to the statewide baseline set by A.R.S. § 9-468.