Demolition Permit — Page, Arizona · Requirements sheet
Verified 2026-08-16 · Source: https://cityofpage.org/departments/building-and-safety/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Demolition Permit in Page, Arizona
Required for demolition of any residential or commercial structure in the City of Page, processed through the standard Building Permit Application. No demolition-specific published fee line was found; demolition is billed on the same Table 1-A valuation basis as other Building Department permits.
Verified 2026-08-16 · Source
When you need this permit
- Building permit required before demolishing a residential or commercial structure within Page city limits (application 'Class of Work' includes a 'Remove' option on the standard Building Permit Application)
- Property owner and general contractor information required on the Building Permit Application
- Coordination with utility providers (Water/Sewer: 928-645-4214; Electrical/PEU: 928-645-2419; Propane/SemStream: 928-645-2391) for service termination is expected as part of standard demolition practice, though no City of Page-published demolition-specific checklist was found
- Call Arizona Blue Stake (1-800-STAKE-IT / 811) before any excavation, per the notice printed on the City of Page Building Permit Application
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), Building Inspection and Permit Fees, Table 1-A, printed p.4. Show full citationHide
City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), Building Inspection and Permit Fees, Table 1-A, printed p.4. No separately itemized demolition-only fee line was found; demolition is billed on the general valuation schedule based on the value/scope of the demolition work.Review timeline
Inspection process
- 1
Final
Verifies utility termination and site condition after demolition is complete
See the full Page inspection guide — scheduling & re-inspection fees →
Tips
- As of July 2026, the City of Page does not appear to publish a permit-specific plan review turnaround time for demolition permits on its public website. The City publishes its general Building Permit Application (which includes a 'Remove' class-of-work option) and fee schedule, but not category-specific review timelines or a dedicated demolition checklist. There is no verifiable online source for this — call the City of Page Building Safety Department directly at 928-645-4266.
- No City of Page-published requirement for a separate County Air Quality/NESHAP asbestos clearance step was found (unlike some Maricopa County cities) — confirm directly with Coconino County and ADEQ whether asbestos survey/NESHAP notification applies to your specific structure before demolition.
- Call Arizona Blue Stake (811 / 1-800-STAKE-IT) before any excavation, per the notice printed directly on the City's Building Permit Application form.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-16.
Fee schedules
Applications & forms
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Page building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Page's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Page yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Page lands. Privacy.
Other permits in Page
Demolition Permit in other cities
Compare demolition permit fees across Arizona →
Look up this fee in a different city →