Re-Roofing Permit — Page, Arizona · Requirements sheet
Verified 2026-07-06 · Source: https://cityofpage.org/departments/building-and-safety/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Re-Roofing Permit in Page, Arizona
Required for residential and commercial re-roofing in Page. Governed by the 2018 IBC/IRC roofing provisions, with roof drain sizing based on the City's local 3-inch-per-hour rainfall design criterion for flat roofs.
Verified 2026-07-06 · Source
When you need this permit
- Building permit required for re-roofing (no published permit-exempt re-roofing scope was found on the City's Building Safety Department page, unlike the exemptions published for accessory structures, fences, and interior finish work)
- Roof drain sizing for flat roofs must be calculated using the City's local 3 inch per hour rainfall design criterion
- Plans/material listing showing existing framing, proposed material, and drainage slope required for plan review where applicable
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Roof Inspection
Verifies sheathing, flashing, underlayment, drainage slope, and proposed roofing material/weight before final cover
See the full Page inspection guide — scheduling & re-inspection fees →
Tips
- As of July 2026, the City of Page does not appear to publish a permit-specific plan review turnaround time for re-roofing permits on its public website. The City publishes permit requirements and its fee schedule, but not category-specific review timelines. There is no verifiable online source for this — call the City of Page Building Safety Department directly at 928-645-4266.
- Unlike some other Arizona cities, no like-for-like re-roof permit exemption was found published on the City of Page Building Safety Department's work-exempt list — that list covers accessory structures, fences, retaining walls under 4 ft, sidewalks/driveways, interior finish work, shallow pools, playground equipment, and small awnings, but does not mention roofing.
- Flat-roof drainage must be sized to the City's local 3 inch per hour rainfall design criterion, which is stricter guidance than the bare 2018 IBC/IRC baseline in some jurisdictions.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Page building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Page
Re-Roofing Permit in other cities
Compare re-roofing permit fees across Arizona →
Look up this fee in a different city →