Inspection sequence, scheduling, and re-inspection fees for building permits in Page, Arizona.

Verified 2026-08-16 · Source

How to schedule

Inspections are requested through the building department below.

Address
Page City Hall, 697 Vista Avenue / P.O. Box 1180, Page, AZ 86040
Phone
928-645-4266
Office hours
Building Official: Brett Slavens (bslavens@pageaz.gov, 928-645-4266, fax 928-645-4265). Main City line: 928-645-8861. Applications are submitted via the City of Page Building Permit Application (paper form, PO Box 1180 / 697 Vista Avenue) or through the online iWorQ Building Permit Application Portal (pageaz_permit.portal.iworq.net/portalhome/pageaz_permit). Final inspections must be scheduled at least 24 hours in advance, and final inspection/approval is required before occupying any room.

Inspection sequence

Applies to: Commercial Building Permit

  1. 1

    Site Plan Review Committee (SPRC) Review (pre-permit gate)

    Required before a building permit can be submitted for new commercial construction or exterior remodel/expansion exceeding the 500 sq ft/10% GFA exemption threshold; not required for interior-only tenant improvement work. Scheduled within 14 days of administrative completeness per § 152.095(B)(3)

  2. 2

    Foundation/Footing

    Before concrete pour; per 2018 IBC and City of Page design criteria

  3. 3

    Framing / Structural / MEP Rough-In

    Structural framing, connections, and mechanical/electrical/plumbing rough-in verified before concealment

  4. 4

    Final / Certificate of Occupancy

    All work complete per approved plans; a Temporary Certificate of Occupancy (30/60/90 days, CBO discretion) or final Certificate of Occupancy is required before occupancy, per § 152.095(G)

Applies to: Fire Sprinkler / Fire Alarm Permit

  1. 1

    Fire Marshall plan review

    The third complete paper plan set is routed to the Fire Marshall for review and approval where the development requires fire sprinklers or fire protection (§ 152.095(B)(1)(e) and (F)(1)(e)). Site plan approval is not complete until the Fire Marshall has approved where required (§ 152.095(B)(5)).

  2. 2

    Chief Building Official review and permit issuance

    Once the site plan has received approval from the SPRC, the Fire Marshall where required, and any other required outside agencies, the applicant works with the Chief Building Official to pull the building permits required for construction (§ 152.095(B)(5)). The Building Permit Application's FIRE DEPT approval box must be marked received.

  3. 3

    Fire system field inspection

    Field inspection of the installed fire sprinkler or fire alarm system by the Page Fire Department / Building Safety Department. Re-inspections and inspections outside normal business hours are charged at $47.00 per hour under the fire fee table. Schedule inspections at least 24 hours in advance.

  4. 4

    Final inspection and Certificate of Occupancy

    No occupancy of any structure is allowed until all required improvements are complete and approved by the Chief Building Official, who is the City's representative authorized to issue a Temporary Certificate of Occupancy (30, 60 or 90 days at the CBO's discretion) or a final Certificate of Occupancy (§ 152.095(G)).

Applies to: Sign Permit

  1. 1

    Chief Building Official plan review

    Applications for signage permits are made through the City's Chief Building Official (§ 152.095(F)). The CBO reviews the sign's anchoring against the wind and seismic hazards that exist in Northern Arizona and must approve it (§ 152.058(B)(1)(g)).

  2. 2

    Zoning review

    Review against the sign regulations of § 152.058, including the prohibited-sign list, sight-triangle and right-of-way restrictions, and the illumination provisions of § 152.059. The Building Permit Application carries a ZONING approval box that must be marked required and received.

  3. 3

    Site Plan Review Committee approval (commercial developments only)

    For commercial developments, all site signage with specifications must be shown on the site plan and approved by the Site Plan Review Committee before building permits for signage can be pulled (§ 152.095(B)(2)(h) and (B)(6)). Single-family dwellings and interior-only remodels are exempt from SPRC review.

  4. 4

    Field inspection

    Signs not constructed in conformance with the approved permit are subject to the enforcement provisions of §§ 152.105 through 152.112. Schedule inspections through the Building Safety Department at least 24 hours in advance.

Applies to: Plumbing Permit

  1. 1

    Underground/Slab

    Before concrete pour — verify pipe slope, materials, cleanouts

  2. 2

    Rough-In

    After pipes installed, before walls closed

  3. 3

    Final

    Fixtures connected, backwater valve and grease interceptor (where required) verified, no leaks

Applies to: Residential Addition / Remodel Permit

  1. 1

    Foundation/Footing

    Required before concrete pour for additions

  2. 2

    Framing

    Structural connections to existing structure

  3. 3

    Final

    Completed work verified against approved plans before occupancy

Applies to: Residential Building Permit (New Construction)

  1. 1

    Foundation/Footing

    Before concrete pour; verify subsoil drain lines around perimeter of below-grade floors per 2006 IBC Section 1807.4 as locally referenced

  2. 2

    Framing

    Structural framing, connections, egress per 2018 IRC and City of Page design criteria

  3. 3

    Final

    All work complete per approved plans; final inspection and approval required prior to occupying any room. Schedule at least 24 hours in advance

Applies to: Electrical Permit

  1. 1

    Rough-In

    Wiring, box placement, and panel connections before walls are closed

  2. 2

    Final

    Devices installed, panel labeled, protections verified per 2017 NEC

Applies to: EV Charger / EVSE Permit

  1. 1

    Rough-In

    Circuit wiring, box placement, and panel connections before walls are closed

  2. 2

    Final

    EVSE installed, protections verified per 2017 NEC

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough-In

    Ductwork and equipment placement before walls closed

  2. 2

    Final

    Equipment operational, clearances and combustion air verified

Applies to: Residential Solar Photovoltaic (PV) Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement before energizing

  2. 2

    Final

    Panel mounting, racking attachment, roof penetration sealing, electrical connections, and interconnection point verified per 2017 NEC

Final inspection only: Demolition Permit, Re-Roofing Permit

Re-inspection fees

Residential Building Permit (New Construction)Re-inspection Fee · City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), printed p.4, Other Inspections and Fees items 2, 3, and 6
$47.00 per hour (minimum charge one-half hour for inspections with no specifically indicated fee; $54.00 per hour cited for other inspections/fees under item 6)
Commercial Building PermitAdditional Plan Review / Re-inspection / After-Hours Inspection Fees · City of Page Consolidated Fee Schedule, Building Inspection and Permit Fees, Table 1-A, printed p.4, Other Inspections and Fees items 1-4 — same schedule applied to every permit type in this record
$47.00 per hour (2-hour minimum for after-hours inspections; one-half hour minimum for re-inspections with no specifically indicated fee)
Fire Sprinkler / Fire Alarm Permit
Fire re-inspection / after-hours / unlisted inspection / additional plan review · City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted June 10, 2026), fire 'Other Inspections and… Show full citationFire re-inspection / after-hours / unlisted inspection / additional plan review · City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted June 10, 2026), fire 'Other Inspections and Fees: Hourly Charge' table, items 1 through 4, printed page 5. Inspections outside normal business hours carry a two-hour minimum charge; inspections for which no fee is specifically indicated carry a one-half hour minimum. The published note reads: 'Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages, and fringe benefits for the employees involved.' Use of outside consultants for plan checking or inspections, or both, is charged at actual costs, including administrative and overhead costs.
$47.00 per hour

Sources & verification

Verified against official sources. Last reviewed 2026-08-16.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Page building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Page building permits

Get alerts for Page

We'll email you when Page's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.