Mechanical / HVAC Permit — Page, Arizona · Requirements sheet
Verified 2026-08-16 · Source: https://cityofpage.org/departments/building-and-safety/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Mechanical / HVAC Permit in Page, Arizona
Required for heating, ventilation, and air conditioning installations in Page, governed by the 2018 International Mechanical Code (IMC) as adopted by the City.
Verified 2026-08-16 · Source
When you need this permit
- Mechanical permit required for installation, replacement, or relocation of HVAC equipment, furnaces, and ventilation systems
- Governed by the 2018 IMC (Chapters 1-15, with Appendix Chapters A and B) as adopted by the City of Page
- 2018 International Fuel Gas Code (Chapters 1-8, Appendix A, B, C) governs associated gas-fired equipment and piping
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), Building Inspection and Permit Fees, Table 1-A, printed p.4. Show full citationHide
City of Page 2026 Consolidated Fee Schedule (Resolution 1345-26, adopted 6-10-2026), Building Inspection and Permit Fees, Table 1-A, printed p.4. No separately itemized mechanical/HVAC-only fee line (e.g., a flat AC-replacement fee) was found; mechanical work is billed on the same general valuation schedule as other Building Department permits.Review timeline
Inspection process
- 1
Rough-In
Ductwork and equipment placement before walls closed
- 2
Final
Equipment operational, clearances and combustion air verified
See the full Page inspection guide — scheduling & re-inspection fees →
Tips
- As of July 2026, the City of Page does not appear to publish a permit-specific plan review turnaround time for mechanical/HVAC permits on its public website. The City publishes permit requirements and its fee schedule, but not category-specific review timelines. There is no verifiable online source for this — call the City of Page Building Safety Department directly at 928-645-4266.
- No dedicated flat AC-replacement fee was found in the published Consolidated Fee Schedule (unlike some other Arizona cities) — mechanical/HVAC work is billed on the general Table 1-A valuation schedule.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-08-16.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Page building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Page's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Page yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Page lands. Privacy.
Other permits in Page
Mechanical / HVAC Permit in other cities
Compare mechanical / hvac permit fees across Arizona →
Look up this fee in a different city →
Related guides
Now live
Build your Page project checklist
Describe your project once and get every permit, document, and fee it triggers in Page — in one checklist. Free, for any city and any number of projects.
Get started →