City of Globe building permits
VerifiedCity of Globe, Arizona — as published 2026-07-06.
Verified 2026-07-06 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new single-family and two-family dwelling construction in the City of Globe. Reviewed against the 2021 IRC and City of Globe amendments (Ordinance No. 889, effective late 2024). Applications are submitted through the City's CitizenServe online portal (Building Permit - New Construction application type) or in person at Globe City Hall, 150 N. Pine Street.
Verified 2026-07-06 · Source
Requirements
- Building permit required for new single-family and two-family dwelling construction within Globe city limits
- Plans must comply with the 2021 IRC and City of Globe amendments, including the Climatic and Geographic Design Criteria (28 psf ground snow load; 115 mph wind, Exposure B; Seismic Design Category C; 12-18 inch frost depth; moderate-to-heavy termite potential; 40 psf habitable attic/sleeping area live load)
- Automatic fire sprinklers are NOT required for R-3 dwellings under 5,000 sq ft (excluding unenclosed decks/patios and attached garages from that calculation); required above that threshold per 2021 IFC Section 903.2.8 as amended
- Construction documents must be prepared by a registered design professional where required by Arizona statute; submittal documents must be merged into one document and submitted in an unlocked digital/electronic format
- Permit valuation is applicant-estimated (materials, labor, electrical, gas, mechanical, plumbing, permanent systems); the Building Official cross-checks against the currently adopted ICC Building Valuation Data Table (February 2024 edition per the City's fee schedule) and may deny underestimated valuations
- Permit applications expire 180 calendar days after filing if not pursued in good faith or issued; issued permits become invalid if work is not commenced within 180 calendar days or is suspended/abandoned for 180 calendar days
Required documents
- RequiredBuilding Permit Application (CitizenServe: Building Permit - New Construction)Submitted via the City's CitizenServe online portal (citizenserve.com/globeaz) or in person at Globe City Hall
- RequiredSite/Plot PlanLot dimensions, setbacks, easements, and structure locations, per Section 105.3/R105.3 submittal requirements
- RequiredConstruction DocumentsMerged into one unlocked digital-format document; prepared by a registered design professional where required by Arizona statute; statement of special inspections and geotechnical reports where applicable
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Based on Valuation (Table 1-A / Permit Valuation Fee) | $33.00 ($1-$500); $33.00 + $5.00 per additional $100 to $2,000; $97.00 + $14.00 per additional $1,000 to $25,000; $545.00 + $14.00 per additional $1,000 to $50,000; $897.00 + $9.00 per additional $1,000 to $100,000; $1,384.00 + $7.00 per additional $1,000 to $500,000; $4,027.00 + $5.00 per additional $1,000 to $1,000,000; $7,827.00 + $3.00 per additional $1,000 to $5,000,000; $18,327.00 + $1.00 per additional $1,000 above $5,000,000 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Permit Valuation Fee table (proposed/adopted 2025 figures), effective April 22, 2025 |
| Plan Review (New/Revisions/Additions) | $70/hour (standard); $140/hour (expedited) | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Community Development Department-Building Safety-Planning and Zoning, Plan Review Fees section; a 65% multiplier is also referenced in the same section |
| Valuation basis for new construction | Per February 2024 ICC Building Valuation Data Table (Table 1-B), e.g. R-3 one-/two-family Type VB: $148.28/sq ft | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Table 1-B (Square Foot Construction Costs) |
| Technology Fee | Assessed on permits over $500 (rate per Admin fee section) | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Community Development Department-Building Safety Admin fee section |
Stand-Alone Building Permit (Additions, Remodels, Accessory Structures)
VerifiedCovers building-only work not part of a full Building Permit application — additions, remodels, patio covers, carports, and accessory structures — billed as a percentage of the full valuation-based Building Permit Fee Table. Applied for via the CitizenServe portal (Stand-Alone Building Permit application type).
Verified 2026-07-06 · Source
Requirements
- Stand-alone building permits apply to separate building work not requiring, or not part of, a full new-construction Building Permit
- Detached one-story accessory structures 200 sq ft or less with no electric/plumbing/mechanical do not require a permit (zoning review for setbacks/height still applies)
- Pre-manufactured accessory buildings, metal awnings, metal pre-manufactured carports/barns/garages/covered porches, wood open decks/balconies, and pergolas/gazebos are billed from a dedicated per-square-foot valuation table rather than the general ICC valuation table
- Plans must comply with City of Globe design criteria (115 mph wind, Exposure B; Seismic Design Category C; 40 psf habitable attic/sleeping live load)
Required documents
- RequiredStand-Alone Building Permit Application (CitizenServe)Submitted via the City's CitizenServe online portal or in person at Globe City Hall
- RequiredSite/Plot PlanShowing existing structure, addition/accessory-structure footprint, and setbacks
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Stand-Alone Building Permit | 60% of the Building Permit Fee Table (Table 1-A, valuation-based), plus a $30 administrative fee | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Stand Alone Permits — Building Permit Fee Table 1-C |
| Pre-Manufactured Accessory Building, Residential / Commercial | $15.00/sq ft | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Valuation Table |
| Metal Awning | $15.00/sq ft | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Valuation Table |
| Metal Pre-Manufactured Carport | $20.00/sq ft | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Valuation Table |
| Metal Pre-Manufactured Barn/Garage | $30.00/sq ft | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Valuation Table |
| Metal Pre-Manufactured Covered Porch/Patio | $25.00/sq ft | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Valuation Table |
| Wood Open Deck/Balcony | $20.00/sq ft | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Valuation Table |
| Pergola/Gazebo | $20.00/sq ft | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Valuation Table |
Electrical Permit (OTC / Stand-Alone)
VerifiedRequired for electrical installation, alteration, or repair work in Globe, governed by the 2020 NEC as adopted and amended by the City. Common over-the-counter (OTC) electrical items (panel replacement, sub-panel wiring, well/pump, additional circuits) are flat-fee permits; larger stand-alone electrical work is billed as a percentage of the Building Permit Fee Table.
Verified 2026-07-06 · Source
Requirements
- Electrical permit required for panel work, sub-panel wiring, well/pump connections, additional circuits, and other electrical installations
- Governed by the 2020 NEC as adopted by the City of Globe, with limited local amendments (garage receptacle placement per Article 210.52(G); equipment grounding conductor types per Article 250.118)
- Common OTC electrical items are flat-fee, counter-issued permits; larger scope electrical work not part of a full building permit is a Stand-Alone Electrical Permit billed at a percentage of the Building Permit Fee Table
- Apply via the CitizenServe online portal (Over-The-Counter Electrical Permit or Stand-Alone Electrical Permit application types) or in person at Globe City Hall
Required documents
- RequiredElectrical Permit Application (CitizenServe: OTC or Stand-Alone Electrical Permit)Submitted via the City's CitizenServe online portal or in person at Globe City Hall
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Stand-Alone Electrical Permit | 10% of the Building Permit Fee Table (Table 1-A, valuation-based), plus a $30 administrative fee | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Stand Alone Permits — Electrical Permit Fee Table 1-E |
| OTC Electrical Panel Replacement | $85 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, OTC Permits section |
| OTC Sub Panel Wiring | $160 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, OTC Permits section |
| OTC Well or Pump | $85 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, OTC Permits section |
| OTC Additional Circuits | $85 + $5 per fixture | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, OTC Permits section |
| OTC Gas Meter Connection/Utility Clearance Only | $50 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, OTC Permits section |
| OTC Gas Meter/Piping | $85 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, OTC Permits section |
Plumbing Permit (OTC / Stand-Alone)
VerifiedRequired for plumbing installation, alteration, or repair work in Globe, governed by the 2021 IPC as adopted and amended by the City. Water heaters are a flat-fee OTC permit; larger-scope plumbing work is a Stand-Alone Plumbing Permit billed as a percentage of the Building Permit Fee Table.
Verified 2026-07-06 · Source
Requirements
- Plumbing permit required for installation, alteration, or repair of plumbing systems, fixtures, and water heaters
- Governed by the 2021 IPC as adopted by the City of Globe, including adopted Appendix E (Sizing of Water Piping Systems); building sewers connecting to private disposal systems must be installed not less than 12 inches below finished grade
- Water Heater replacement is a flat-fee OTC permit
- Apply via the CitizenServe online portal (OTC Plumbing Permit or Stand-Alone Plumbing Permit application types) or in person at Globe City Hall
Required documents
- RequiredPlumbing Permit Application (CitizenServe: OTC or Stand-Alone Plumbing Permit)Submitted via the City's CitizenServe online portal or in person at Globe City Hall
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Stand-Alone Plumbing Permit | 25% of the Building Permit Fee Table (Table 1-A, valuation-based), plus a $30 administrative fee | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Stand Alone Permits — Plumbing Permit Fee Table 1-D |
| OTC Water Heater | $85 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, OTC Permits section |
Mechanical / HVAC Permit (OTC / Stand-Alone)
VerifiedRequired for HVAC and mechanical equipment installation in Globe, governed by the 2021 IMC as adopted and amended by the City. Ducted and non-ducted HVAC/evaporative-cooler installs are flat-fee OTC permits (residential and commercial rates differ); wood stoves are a separate flat OTC fee; larger-scope mechanical work is a Stand-Alone Mechanical Permit billed as a percentage of the Building Permit Fee Table.
Verified 2026-07-06 · Source
Requirements
- Mechanical permit required for installation, replacement, or relocation of HVAC/evaporative-cooling equipment and wood stoves
- Governed by the 2021 IMC as adopted by the City of Globe, including adopted Appendix A (Chimney Connector Pass-Throughs)
- OTC fee schedule separately prices ducted vs. non-ducted systems, and residential vs. commercial
- Apply via the CitizenServe online portal (OTC Mechanical Permit or Stand-Alone Mechanical Permit application types) or in person at Globe City Hall
Required documents
- RequiredMechanical Permit Application (CitizenServe: OTC or Stand-Alone Mechanical Permit)Submitted via the City's CitizenServe online portal or in person at Globe City Hall
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Stand-Alone Mechanical Permit | 5% of the Building Permit Fee Table (Table 1-A, valuation-based), plus a $30 administrative fee | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Stand Alone Permits — Mechanical Permit Fee Table 1-F |
| OTC HVAC/Evap Cooler With Ducting — Residential | $170 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, OTC Permits section |
| OTC HVAC/Evap Cooler With Ducting — Commercial | $240 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, OTC Permits section |
| OTC HVAC/Evap Cooler Without Ducting — Residential | $100 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, OTC Permits section |
| OTC HVAC/Evap Cooler Without Ducting — Commercial | $170 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, OTC Permits section |
| OTC Wood Stoves | $100 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, OTC Permits section |
Solar Photovoltaic (PV) Permit
VerifiedRequired for installation of residential or commercial solar photovoltaic systems in Globe, governed by the 2021 IBC/IRC Chapter 12 Energy Systems provisions (NFPA 855) as adopted and amended by the City, plus Fire Code marking/pathway requirements. Applications are submitted via the CitizenServe portal (Photovoltaic Permit application type).
Verified 2026-07-06 · Source
Requirements
- Permit required for roof-mount, ground-mount, battery backup (ESS), and solar water heater systems
- Energy systems shall be installed in accordance with City of Globe Chapter 12 amendments and NFPA 855; residential plan review is included in the base permit fee, commercial plan review is billed separately
- Interior pathways between array sections required per Fire Code Section 1205.3.2 amendment (minimum 150-ft intervals, 4-ft-wide pathways to standpipes/hatches)
- Marking required on DC conduit/raceways/enclosures every 10 feet stating 'WARNING: PHOTOVOLTAIC POWER SOURCE' per Fire Code amendment
- Apply via the CitizenServe online portal (Photovoltaic Permit) or in person at Globe City Hall
Required documents
- RequiredPhotovoltaic Permit Application (CitizenServe)Submitted via the City's CitizenServe online portal or in person at Globe City Hall
- RequiredConstruction PlansSite plan, roof/ground layout, racking layout, and electrical 3-line diagram
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Roof Mount (includes 2 inspections, plan review included) | $320.00 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Solar Photovoltaic Systems-Residential section |
| Residential Ground Mount (includes 3 inspections) | $380.00 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Solar Photovoltaic Systems-Residential section |
| Residential Battery Backup System (ESS, includes 1 inspection) | $180.00 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Solar Photovoltaic Systems-Residential section |
| Residential Solar Water Heater (includes 1 inspection) | $85.00 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Solar Photovoltaic Systems-Residential section |
| Addition of Electric Permits for Service Upgrades | $180.00 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Solar Photovoltaic Systems-Residential section |
| Commercial Roof/Ground Mount (plan review NOT included) | $320.00 (roof mount, 2 inspections) / $380.00 (ground mount, 3 inspections) | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Solar Photovoltaic Systems-Commercial section |
| Fire Dept: Install/Modify Solar PV Power System — Commercial Application | $300 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Fire Department fee schedule, Photovoltaic: Solar/Energy systems section |
EV Charger / Electric Vehicle Charging Station Permit
VerifiedThe City of Globe Fee Schedule (Resolution No. 1904, Exhibit A, 2025 Fee Schedule, effective 4/22/2025) has no dedicated 'EV charger,' 'EVSE,' or 'electric vehicle charging' line item -- confirmed by a direct text search of the current adopted fee schedule PDF, which contains no such entry (its only 'vehicle' hit is an unrelated Fire Department 'Vehicle Storage' fee). Unlike Solar Photovoltaic Systems, which has its own dedicated fee category, a Level 2 (240V) EV charger circuit is permitted and billed as ordinary residential or commercial electrical work under the City's standard Over-The-Counter (OTC) electrical fee items or the Stand-Alone Electrical Permit (valuation-based) process, depending on scope.
Verified 2026-07-20 · Source
Requirements
- A licensed electrical contractor obtains an electrical permit through the City of Globe Building Safety Department, in person at City Hall or online via the CitizenServe portal (citizenserve.com/globeaz, installation ID 469)
- If the EV charger is added as a new dedicated circuit to an existing panel with spare capacity, this is billed as an OTC 'Additional Circuits' permit
- If a new sub-panel is required to feed the charger, this is billed as an OTC 'Sub Panel Wiring' permit instead
- If the installation requires a full electrical service upgrade to support the charger's amperage draw, this is billed as a Stand-Alone Electrical Permit (10% of the Building Permit Fee Table 1-A valuation-based fee, plus a $30 administrative fee) rather than a flat OTC fee
- No EV-charger-specific submittal checklist or application type is listed among the City's CitizenServe portal permit categories (which do list a dedicated 'Photovoltaic' type) -- applicants should select the appropriate general electrical permit type (OTC Electrical or Stand-Alone Electrical) for an EV charger job
Required documents
- RequiredCity of Globe Electrical Permit Application (OTC or Stand-Alone)Submitted in person at City Hall (150 N. Pine Street) or online via the CitizenServe portal; no separate EV-charger-specific form exists
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| OTC Additional Circuits (e.g., a single new EV charger circuit added to an existing panel) | $85 + $5 per fixture | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, OTC Permits section -- no distinct 'EV charger'/'EVSE' line item exists; confirmed by direct text search of the current adopted fee schedule PDF (Resolution_1904_Fee_Schedule_As_Adopted_4-22-25). This is the general additional-circuit fee an electrician would use for a single new EV charger circuit. |
| OTC Sub Panel Wiring (if a new sub-panel is required to feed the charger) | $160 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, OTC Permits section |
| OTC Electrical Panel Replacement (if the existing panel must be replaced/upsized) | $85 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, OTC Permits section |
| Stand-Alone Electrical Permit (if a full service upgrade is needed to support the charger) | 10% of the Building Permit Fee Table (Table 1-A, valuation-based), plus a $30 administrative fee | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Stand Alone Permits — Electrical Permit Fee Table 1-E; applies when the scope exceeds a flat OTC line item |
Demolition Permit
VerifiedRequired for demolition of any residential or commercial structure in Globe. OTC demolition fees differ for residential vs. commercial. Demolition permits are unique among Globe permits in expiring 90 calendar days after issuance with no extension allowed.
Verified 2026-07-06 · Source
Requirements
- Building permit required before demolishing a residential or commercial structure within Globe city limits
- Demolition permits expire 90 calendar days after issuance and may NOT be extended (unlike other permit types, which allow one 180-day extension)
- All utilities must be terminated per code prior to demolition
- Applicant should confirm asbestos abatement / air quality clearance requirements applicable to Gila County/ADEQ prior to demolition, as is standard practice statewide for structure demolition
Required documents
- RequiredDemolition Permit Application (CitizenServe)Submitted via the City's CitizenServe online portal (Demolition Permit or Over-The-Counter Demolition Permit application types) or in person at Globe City Hall
- RequiredSite PlanShowing lot dimensions and location of the building(s) to be demolished plus other existing structures
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| OTC Residential Demolition | $70 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, OTC Permits section |
| OTC Commercial Demolition | $200 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, OTC Permits section |
Manufactured Home / Park Model Permit
VerifiedRequired for placement of manufactured homes, park models, and factory-built buildings in Globe, per IRC Appendix AE (Manufactured Housing Used As Dwellings) as adopted and amended by the City. Statewide construction/installation standards for the factory-built structure itself are separately regulated by the Arizona Department of Fire, Building and Life Safety (Office of Manufactured Housing).
Verified 2026-07-06 · Source
Requirements
- City permit required for site placement, foundation/ground set, skirting/perimeter enclosure, and utility (electrical, water/sewer) connections
- Skirting and permanent perimeter enclosures are required; skirting must be installed per the manufacturer's instructions and IRC requirements as adopted by the City, secured to minimize vibration/wind damage and compensate for frost heave
- Permanent perimeter enclosures must be constructed of materials meeting regular foundation-construction code requirements
- Fee structure is explicitly 'Based on ADOH fees' (Arizona Department of Housing / Office of Manufactured Housing) per the City's fee schedule
Required documents
- RequiredManufactured Home Permit / Park Model Permit Application (CitizenServe)Submitted via the City's CitizenServe online portal or in person at Globe City Hall
- RequiredSite PlanShowing placement location, setbacks, and utility connection points
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Ground Sets/Foundation/Stem Walls Inspection (additional fees) | $85.00 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Manufactured Homes section (Based on ADOH fees) |
| Electrical Installation | $85.00 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Manufactured Homes section |
| Electrical Panel | $85.00 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Manufactured Homes section |
| Water/Sewer Connections | $300.00 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Manufactured Homes section |
| Park Models | $200.00 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Manufactured Homes section |
Swimming Pool / Spa / Hot Tub Permit
VerifiedRequired for in-ground, above-ground, and pre-fabricated pools, spas, and hot tubs in Globe, governed by the 2021 International Swimming Pool and Spa Code as adopted and amended by the City, together with the barrier/enclosure requirements of the amended IBC/IPMC and Arizona Revised Statutes § 36-1681.
Verified 2026-07-06 · Source
Requirements
- Permit required for any pool, spa, or hot tub containing water over 18 inches deep and wider than 8 feet (residential pools); prefabricated above-ground pools/spas/hot tubs at or above 5,000 gallons require permits for associated electric/plumbing/mechanical work
- Pool/spa/hot tub must be completely enclosed by a barrier at least 60 inches high above finished grade, with self-closing/self-latching gates, per the amended IPMC Section 303.2, IBC Section 3109.0, and ISPSC Section 305
- Construction fencing at least 60 inches high is required around in-ground pool/spa construction sites from the start of excavation until the permanent barrier is complete
- Spas/hot tubs with a safety cover complying with ASTM F1346 are exempt from the barrier-enclosure requirement
- Public/semi-public pools must additionally comply with A.R.S. § 36-1681 and Arizona Administrative Code Title 18, Chapter 5
Required documents
- RequiredPool and Spa Permit Application (CitizenServe)Submitted via the City's CitizenServe online portal or in person at Globe City Hall
- RequiredSite PlanShowing pool/spa location, setbacks, and required barrier/fencing plan
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Site Built or Pre-Manufactured Pool/Spa/Hot Tub — Private/Residential (includes pool, mechanical, electric, plumbing & barrier inspections; plan review NOT included) | $280.00 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Swimming Pool/Spa/Hot Tub Permits Table 1-G |
| Site Built or Pre-Manufactured Pool/Spa/Hot Tub — Public/Commercial (plan review NOT included) | $380.00 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Swimming Pool/Spa/Hot Tub Permits Table 1-G |
| Prefabricated (packaged) above-ground pool/spa/hot tub at or above 5,000 gallons | Base fee per associated OTC Permit Fees (Electric, Plumbing, Mechanical) | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Swimming Pool/Spa/Hot Tub Permits Table 1-G |
| Amusement/Water Parks | Uses Permit Fee Table 1-A (valuation-based) | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Swimming Pool/Spa/Hot Tub Permits Table 1-G |
Sign Permit (Commercial/Business Signage)
VerifiedRequired for erecting, re-erecting, constructing, or altering any commercial/business sign in Globe, under Zoning Code Article 14-13 (Sign Regulations), adopted by Resolution No. 1791 / Ordinance No. 855 (11-27-2018) and administered by the Development Services (Planning & Zoning) Department. Properties within the Globe Historic Downtown District — the city's Historic Preservation (HP) Overlay Zoning District (Sec. 14-5-17) — face an additional, mandatory design-review layer: the Historic Preservation Advisory Commission (HPAC, Sec. 14-2-4) must approve sign design before a permit issues, per the City's Historic Preservation District Design Guidelines, Chapter 5 (Sign Design Guidelines for All Projects).
Verified 2026-07-23 · Source
Requirements
- A separate sign permit is required for each business entity's sign(s), and/or for each group of signs on a single supporting structure; relocating or re-facing an existing sign cabinet for a new business also requires a permit (Sec. 14-13-9(a))
- No permit is required for nameplate signs, any sign 6 square feet or less, interior signs not visible from the public right-of-way, or repainting an existing sign — EXCEPT that repainting a sign within the Historic Preservation District always requires a permit (Sec. 14-13-9(b))
- Properties within the Globe Historic Downtown District (HP Overlay Zoning District) require Historic Preservation Advisory Commission (HPAC) Design Review approval before the City will issue a sign permit, per the Historic Preservation District Design Guidelines, Chapter 5
- Application is submitted in writing on Development Services Department forms (via the CitizenServe portal or in person), showing the sign's location, dimensions, parcel/building frontage, materials, method of attachment, designer's name/address, building elevation (if wall-mounted), and a plot plan; two copies of plans/specifications are required, or three copies for a sign permit application within the Globe Historic District (Sec. 14-13-10(a))
- Signs must be integrated with the building's architecture and may not exceed 25% of the wall section area they are mounted on; freestanding signs are capped at 6 feet in height under the integration standard, and any sign over 100 square feet or over 20 feet tall requires discretionary Mayor & Council approval (Sec. 14-13-18; Sec. 12-4-2(B))
- A sign permit becomes null and void if work has not commenced within 90 days of issuance (Sec. 14-13-10(b))
Required documents
- RequiredSign Permit ApplicationSubmitted via the City's CitizenServe online portal or in person at Globe City Hall (150 N. Pine Street) on forms provided by the Development Services Department
- RequiredSign Plans and SpecificationsTwo copies (three if the sign is within the Globe Historic District) showing sign location, size, parcel/building dimensions, materials, method of support/attachment, designer's name and address, building elevation, and site/plot plan (Sec. 14-13-10(a))
- OptionalHistoric Preservation Advisory Commission (HPAC) Design Review ApplicationRequired only for signs, facade changes, or repainting on properties within the Historic Preservation (HP) Overlay Zoning District / Globe Historic Downtown District, per the Historic Preservation District Design Guidelines
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Sign Permit — Up to 6 sq ft | No permit required | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Sign Permit Fees section; matches the no-permit exemption at Sign Regulations Sec. 14-13-9(b)(2) |
| Sign Permit — 7 to 50 sq ft | $90.00 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Sign Permit Fees section |
| Sign Permit — 51 to 100 sq ft | $180.00 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Sign Permit Fees section |
| Sign Permit — 101 to 300 sq ft | $300.00 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Sign Permit Fees section |
| Banners | $30.00 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Sign Permit Fees section |
| A-Frame and Sandwich Board Signs | $30.00 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Sign Permit Fees section |
| Comprehensive Sign Plan | $300.00 + $20.00 per 0.25 acre | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Sign Permit Fees section |
| HPAC Mural Review | $50.00 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Sign Permit Fees section — applies to murals reviewed by the Historic Preservation Advisory Commission |
| HPAC Design Review — Signs (Historic Preservation District only) | $50.00 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, HPAC Design Review section (Community Development Department-Building Safety – Planning and Zoning); required in addition to the base sign permit fee for signs within the Globe Historic Downtown District |
Fire Sprinkler & Fire Alarm System Permit
VerifiedThe City of Globe has its own municipal Fire Department (19 career firefighters plus reserves, led by Fire Chief Gary Robinson and Fire Marshal Tom Murtha) rather than relying on a rural fire district, and administers fire protection system permitting directly. Fire sprinkler and fire alarm systems (together with fire pumps, standpipes, hydrant flow tests, fire line/civil work, and kitchen hood systems) are reviewed by the Fire Marshal through the same CitizenServe portal used for Building permits, under the 2021 International Fire Code as locally amended by Ordinance No. 889. The City of Globe Fee Schedule Resolution No. 1904, Exhibit A has NO dedicated 'fire sprinkler' or 'fire alarm' line item — confirmed by a direct full-text search of the adopted fee schedule PDF, which contains no such entry. Fire protection system work is instead billed under the same general Permit Valuation Fee sliding scale used for other Stand-Alone permits, plus the general hourly Plan Review and Inspection fees; a single combined slug is used here because Globe does not treat sprinkler and alarm systems as separately billed permit products.
Verified 2026-07-23 · Source
Requirements
- Fire protection system plans (fire sprinkler, fire alarm, fire pump, standpipe, hydrant flow test, fire line/civil, and kitchen hood systems) must be professionally designed/engineered and submitted via the CitizenServe portal for review by the Fire Marshal
- Digital/electronic plan submittals for Fire Protection Systems must be legible and drawn at a scale of 1/8 inch = 1 foot, sufficient to show conformance with the City's adopted code and amendments
- Construction documents must be of sufficient clarity to indicate the location, nature, and extent of the proposed work and demonstrate compliance with the City's adopted fire code, relevant laws, ordinances, rules, and regulations
- No City of Globe fee schedule line item exists specifically for a 'fire sprinkler permit' or 'fire alarm permit' — confirmed absent via direct full-text search of the adopted Resolution 1904 Exhibit A fee schedule; the work is billed instead via the general Permit Valuation Fee sliding scale (the same table used for other Stand-Alone permits) plus hourly Plan Review Fees and Inspection Fees
- Inspections must be requested through the CitizenServe Online Portal at least one day in advance of the desired inspection date
Required documents
- RequiredFire Protection System PlansProfessionally designed/engineered plans for the fire sprinkler, fire alarm, or other fire protection system, submitted at 1/8 inch = 1 foot scale via the CitizenServe portal
- RequiredSite PlanSubmitted at 1 inch = 50 feet scale, showing the building and fire protection system layout
- RequiredFire Permit ApplicationSubmitted via the City's CitizenServe online portal (installation ID 469) or in person at City Hall
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Permit Valuation Fee (sliding scale, based on system value — used for Stand-Alone Fire Protection System permits since no dedicated sprinkler/alarm line item exists) | $33.00 for the first $500 (increasing on a published sliding scale up to $18,327.00 for the first $5,000,001, plus $1.00 per additional $1,000 or fraction thereof above that) | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Community Development Department-Building Safety – Permit Valuation, Permit Valuation Fee table |
| Plan Review Fee (New/Revisions/Additions) | $70/Per Hr. | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Community Development Department-Building Safety – Planning and Zoning, Plan Review Fees section |
| Expedited Plan Review Fee | $140/Per Hr. | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Plan Review Fees section |
| Inspection Fee (normal business hours) | $70/Per Hr. | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Inspections section |
| Inspection Fee (after-hours / same-day) | $140/Per Hr. | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Inspections section |
Certificate of Occupancy (including Change of Use)
VerifiedGlobe's CitizenServe portal and Fee Schedule list 'Certificate of Occupancy' and 'Temporary CO' as distinct permit application types, issued by the Building Safety Department (Building sign-off) together with the Fire Department (Fire sign-off), required before a building or portion of a building may be occupied, or before an existing building's occupancy classification or use is changed, under the City's adopted 2021 International Building Code (Section 111) and International Existing Building Code (Change of Occupancy provisions), as amended by Ordinance No. 889. Globe has NO separately named 'Change of Use' or 'Change of Occupancy' permit product in its CitizenServe portal or fee schedule — confirmed via the City's own published permit-category list and a full-text search of Resolution 1904 — so a change in occupancy classification or tenant use of an existing building is processed through this same Certificate of Occupancy application and review (plus whatever Building/Stand-Alone permit review is separately triggered for any tenant-improvement work the new use requires).
Verified 2026-07-23 · Source
Requirements
- A Certificate of Occupancy is required before any building, structure, or portion thereof is used or occupied, and before any change is made in an existing building's occupancy classification or use, per the City's adopted 2021 IBC (Section 111) and IEBC Change of Occupancy provisions, as amended by Ordinance No. 889
- Application is submitted via the CitizenServe portal (Certificate of Occupancy application type) or in person at City Hall (150 N. Pine Street)
- Both a Building Department C of O — Building sign-off and a Building Department C of O — Fire sign-off are required and billed as two separate $70 fee line items under Resolution 1904
- Where a project or tenant space is not fully complete, a Temporary Certificate of Occupancy (TCO) may be issued instead, tiered in 30/60/90-day increments with escalating fees for commercial versus residential uses
- Globe's CitizenServe portal and fee schedule have no separately named 'Change of Use' or 'Change of Occupancy' permit product — confirmed via the City's own permit-category listing and a full-text search of Resolution 1904; a change in an existing building's occupancy classification or tenant use is processed through this same Certificate of Occupancy application, plus any Building/Stand-Alone permit review separately required for associated tenant-improvement work
Required documents
- RequiredCertificate of Occupancy ApplicationSubmitted via the CitizenServe online portal (installation ID 469) or in person at Globe City Hall
- RequiredFinal Inspection Sign-offsAll applicable Building, Fire, and trade (electrical/plumbing/mechanical) final inspections must pass before a Certificate of Occupancy is issued
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Department C of O — Building | $70.00 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Certificate of Occupancy section |
| Building Department C of O — Fire | $70.00 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Certificate of Occupancy section |
| Temporary C of O (TCO) — Commercial, 1st 30 Days | $500.00 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Temporary C of O (TCO) section |
| Temporary C of O (TCO) — Commercial, 2nd 60 Days | $700.00 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Temporary C of O (TCO) section |
| Temporary C of O (TCO) — Commercial, 3rd 90 Days | $900.00 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Temporary C of O (TCO) section |
| Temporary C of O (TCO) — Residential, 1st 30 Days | $300.00 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Temporary C of O (TCO) section |
| Temporary C of O (TCO) — Residential, 2nd 60 Days | $500.00 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Temporary C of O (TCO) section |
| Temporary C of O (TCO) — Residential, 3rd 90 Days | $700.00 | City of Globe Fee Schedule Resolution No. 1904, Exhibit A, Temporary C of O (TCO) section |
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the City of Globe building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.