This is PermitBase’s published record for Duncan as of 2026-07-06. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Duncan building permits
VerifiedDuncan, Arizona — as published 2026-07-06.
Verified 2026-07-06 · Source
Codes adopted
Permit types & fees
Building Permit (Construction / Alteration / Repair / Moving / Demolition)
VerifiedThe Town of Duncan's single, general-purpose building permit, required for construction, alteration, repair, moving, or demolition of a structure within Town limits. Reviewed against the 2006 International Building Code and Adobe Code (Town Code Chapter 7) by the Building Official function housed in the Town Manager's office. Applied for using the one-page 'Application for Building Permit and Inspection' form at Town Hall.
Verified 2026-07-06 · Source
Requirements
- Building permit required for construction, alteration, repair, moving, or demolition of a structure within Duncan town limits, per Town Code Chapter 7
- Work must conform to the Building, Plumbing, Gas, and Electrical Codes of the Town of Duncan as referenced on the permit application
- Application must state size, wall/roof/floor materials, use, approximate cost, location/APN, owner, and contractor
- Whenever a building permit is issued, the building must also conform to the Town's Zoning Ordinance (Town Code § 7-1-2)
- Contractor Tax License required to be listed if estimated project valuation exceeds $50,000 (per the combined Zoning/Building/Historic District/Floodplain Permit form)
- Approved in person by the Building Official; no online submittal portal is published
Required documents
- RequiredApplication for Building Permit and InspectionTown of Duncan's one-page building permit application — General Description checkboxes for Construction/Alteration/Repair/Moving/Demolition, size, wall/roof/floor materials, use, approximate cost, location/APN, owner, and contractor
- OptionalZoning Use, Building, Historic District and Floodplain PermitCombined multi-track permit form used when zoning use review, historic district review, and/or floodplain review also apply to the same project
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee | $30.00 plus $4.11 per $1,000 of valuation | Town of Duncan Schedule of Fees and Charges (Fee-Schedule-5.2026.pdf, header-labeled 'PROPOSED'), Planning and Zoning section, Building Permits item B — this figure is unchanged from the prior (2023) fee schedule revision, so it is stable across at least two published revisions |
| Building Permit Renewal | 50% of the original permit fee | Town of Duncan Schedule of Fees and Charges, Building Permits item C |
| Building Plan Review | 65% of the Building Permit Fee | Town of Duncan Schedule of Fees and Charges, Building Permits item D |
Mobile Home Permit
VerifiedA separately fee-scheduled permit for placement of a mobile/manufactured home within the Town of Duncan, distinct from the general Building Permit fee line on the Town's Schedule of Fees and Charges.
Verified 2026-07-06 · Source
Requirements
- Separate Mobile Home Permit fee line applies (distinct from the standard valuation-based Building Permit fee formula)
- Manufactured/mobile home construction and installation standards themselves are set at the State level (Arizona Department of Fire, Building and Life Safety / Office of Manufactured Housing, per A.R.S. Title 41), consistent with statewide practice; the Town's Mobile Home Permit covers local placement/site approval
- Submitted via the same 'Application for Building Permit and Inspection' form used for general building permits (the form's 'General Description of Proposed Work' does not have a distinct mobile-home checkbox; the Mobile Home Permit is distinguished purely by its separate fee-schedule line item)
Required documents
- RequiredApplication for Building Permit and InspectionSame general-purpose Town of Duncan building permit application used for mobile home placement
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mobile Home Permit | $50.00 | Town of Duncan Schedule of Fees and Charges (Fee-Schedule-5.2026.pdf, header-labeled 'PROPOSED'), Planning and Zoning section, Building Permits item A. Flagged for confidence: an earlier (2023) fee schedule revision lists this same line item at $400.00 rather than $50.00 — a substantial change between the two published revisions found. The 5.2026 version is the most recently dated document currently linked from the Town's live site, so its $50.00 figure is used as current, but this is a genuine downward revision worth re-confirming directly with Town Hall given the size of the discrepancy between the two source documents. |
Zoning Use Permit
VerifiedRequired whenever a proposed use or structure must be confirmed against the Town's Zoning Ordinance (Town Code Chapter 15), administered through the combined Zoning Use, Building, Historic District and Floodplain Permit form and, where the requested use is not permitted outright, routed to the Planning & Zoning Commission or, on appeal/variance, the Board of Adjustment.
Verified 2026-07-06 · Source
Requirements
- Zoning Use Permit required to confirm a proposed use/structure complies with existing zoning (Town Code Chapter 15, Zoning Regulations)
- A 'Use Permitted on Appeal' (variance) route exists through the Planning & Zoning Commission, with a further Board of Adjustment hearing route for amendments (changed use)
- A Zoning Use Permit becomes void six months after issuance unless substantial utilization has begun
- The permit must be posted on-site during construction
- Property may be subject to erosion hazards and other unmapped floodplains beyond what is shown on FEMA mapping; the floodplain data the Town relies on is the best available, and the owner is responsible for providing additional technical floodplain information
Required documents
- RequiredZoning Use, Building, Historic District and Floodplain PermitTown of Duncan's combined permit form covering Zoning Use Permit, Use Permitted on Appeal (Variance), Amendment (changed use), Building Permit, Septic System Permit, and Floodplain Permit (NFIP) tracks on a single document
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Amendment Application | $200 | Town of Duncan Schedule of Fees and Charges, Planning and Zoning section, item 2 |
| Appeal to Board of Adjustments | $200 | Town of Duncan Schedule of Fees and Charges, Planning and Zoning section, item 3 |
| Administrative Permits | $50 | Town of Duncan Schedule of Fees and Charges, Planning and Zoning section, item 4 |
| Petition Exception | $200 | Town of Duncan Schedule of Fees and Charges, Planning and Zoning section, item 5 |
| Reversion of Acreage or Abandonment | $300 | Town of Duncan Schedule of Fees and Charges, Planning and Zoning section, item 6 |
Floodplain Development Permit (NFIP)
VerifiedRequired before construction or development begins within any area of special flood hazard in Duncan, per Town Code Chapter 8 (Flood Damage Prevention), enacted under A.R.S. § 48-3610. Administered by the Town Manager (or designee) as Floodplain Administrator, and represented as its own 'Floodplain Permit (NFIP)' line on the Town's combined permit form.
Verified 2026-07-06 · Source
Requirements
- Development Permit required before construction or development begins within any area of special flood hazard (Town Code § 8-1-7.1)
- Application must include plans in duplicate drawn to scale showing the nature, location, and elevation of the area in question; existing/proposed structures; fill; storage of materials; and drainage facilities
- Must show proposed elevation (relative to mean sea level) of the lowest floor (including basement) of all structures; in Zone AO, elevation of existing grade and proposed elevation of lowest habitable floor
- Must show proposed elevation to which any structure will be floodproofed, with certification by a registered professional engineer or architect where floodproofing is used
- Base flood elevation data required for subdivision proposals or other development greater than 50 lots or 5 acres
- Description required of the extent to which any watercourse will be altered or relocated as a result of the proposed development
- The Floodplain Administrator (Town Manager or designee) reviews every permit to confirm ordinance requirements are met, other required state/federal permits have been obtained, the site is reasonably safe from flooding, and the development does not adversely affect (i.e., raise base flood elevation by more than one foot at any point) the floodway's carrying capacity
Required documents
- RequiredZoning Use, Building, Historic District and Floodplain PermitTown of Duncan's combined permit form; Floodplain Permit (NFIP) section requires Date of Approval and confirms whether blueprints are approved
- RequiredDevelopment Permit plan setPlans in duplicate, drawn to scale, per Town Code § 8-1-7.1 requirements (site elevations, structures, fill, drainage, floodproofing certification where applicable)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Floodplain Permit (NFIP) | Non-refundable fee (amount not separately itemized on the Town's published Schedule of Fees and Charges) | The combined Zoning Use/Building/Historic District/Floodplain Permit form has a 'Non-refundable fee received by' line under a general 'Fees' section, but the Town's Schedule of Fees and Charges does not list a distinct dollar figure specifically labeled for the Floodplain Permit (NFIP) line, separate from the general Building Permit valuation-based fee. Source: Town of Duncan Zoning Use, Building, Historic District and Floodplain Permit form; Town of Duncan Schedule of Fees and Charges (no distinct Floodplain Permit fee line found). |
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Duncan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.