Duncan building permits

Verified

Duncan, Arizona — as published 2026-07-07.

Verified 2026-07-06 · Source

Codes adopted

Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 9 for municipalities). The Town of Duncan is a small incorporated town that runs its own building-permit program directly out of Town Hall (the Town Manager's office functions as Building Official) rather than deferring to Greenlee County; this is confirmed by the Town's own Building Permits & Fees page, its Chapter 7 (Building) town code chapter, its Schedule of Fees and Charges, and its paper 'Application for Building Permit and Inspection' form, all of which are Duncan's own documents (not county documents). Source: Town of Duncan Building Permits & Fees page (duncanaz.us/home/services/building-permits-fees/) and Town of Duncan Town Code Chapter 7 — Building (Rev. 6/06).2006 International Building Code (IBC), adopted by reference as the Town's building code (Town Code § 7-1-1, Rev. 6/06). This is the only building-code edition Duncan's published town code identifies by year; the Town has not published any subsequent code-update ordinance superseding the 2006 IBC adoption. Source: Town of Duncan Town Code Chapter 7 — Building, Article 7-1, Section 7-1-1.'Adobe Code' adopted by reference as a supplement to the (Uniform) Building Code (Town Code § 7-1-3, Rev. 6/06) — reflecting the region's traditional adobe construction. Source: Town of Duncan Town Code Chapter 7 — Building, Article 7-1, Section 7-1-3.Uniform Plumbing Code, 'current edition' as published by the International Association of Plumbing and Mechanical Officials (IAPMO), adopted by reference (Town Code Article 7-2, Rev. 6/06). The ordinance text itself does not pin a specific year/edition — it self-updates to whichever edition IAPMO currently publishes, which is a town-code drafting convention rather than a fixed-year adoption. Source: Town of Duncan Town Code Chapter 7 — Building, Article 7-2.National Electrical Code (NEC), 'current edition' as published by the National Fire Protection Association (NFPA), adopted by reference (Town Code Article 7-3, Rev. 6/06). Same self-updating drafting convention as the plumbing code — no fixed year is specified in the ordinance text. Source: Town of Duncan Town Code Chapter 7 — Building, Article 7-3.Uniform Mechanical Code, 'current edition' as published by the International Association of Plumbing and Mechanical Officials (IAPMO), adopted by reference (Town Code Article 7-4, Rev. 6/06). Source: Town of Duncan Town Code Chapter 7 — Building, Article 7-4.Uniform Solar Energy Code and Uniform Sound Transmission Control Code, both adopted by reference as additional codes (Town Code Article 7-5, Rev. 6/06). Source: Town of Duncan Town Code Chapter 7 — Building, Article 7-5.The Building Official/administrative authority function for all building, plumbing, electrical, and other inspections under Chapter 7 is vested in the office of the Town Manager, who may authorize deputies to perform inspection work (Town Code Article 7-6, Rev. 6/06). Source: Town of Duncan Town Code Chapter 7 — Building, Article 7-6.Asbestos-containing materials (ACM) in older commercial buildings: any renovation, demolition, or removal of a commercial building must first obtain a Building Permit, contingent on proof of compliance with State/Federal ACM laws, including an asbestos survey and handling/removal by an Arizona State Licensed ACM Contractor, coordination with the Arizona Department of Environmental Quality, and disposal at a State-approved ACM landfill (Town Code Article 7-7, effective 6/11/2001). Source: Town of Duncan Town Code Chapter 7 — Building, Article 7-7.Floodplain/flood-damage-prevention regulations are adopted separately under Chapter 8 (Rev. 11/05), enacted under authority of A.R.S. § 48-3610, and administered by the Town Manager (or designee) acting as Floodplain Administrator, with the Floodplain Board being either the Flood Control District of Greenlee County or the Duncan Town Council depending on which body is engaged in enforcement at a given time (A.R.S. § 48-3601 definition). A separate Development Permit (the Floodplain Permit line on the combined Zoning/Building/Historic District/Floodplain Permit form) is required before construction or development begins within any area of special flood hazard. Source: Town of Duncan Town Code Chapter 8 — Floodplain Management, Articles 8-1-1, 8-1-7.2.A separate Historic District permit track exists on the Town's combined permit form ('Zoning Use, Building, Historic District and Floodplain Permit'), implying a locally designated historic district with its own review layer, but no standalone Historic District ordinance chapter or design-guideline document was found published on the Town's website to independently verify its scope or criteria. Source: Town of Duncan Zoning Use, Building, Historic District and Floodplain Permit form (Rev. 4/2006).

Permit types & fees

Building Permit (Construction / Alteration / Repair / Moving / Demolition)

Verified

The Town of Duncan's single, general-purpose building permit, required for construction, alteration, repair, moving, or demolition of a structure within Town limits. Reviewed against the 2006 International Building Code and Adobe Code (Town Code Chapter 7) by the Building Official function housed in the Town Manager's office. Applied for using the one-page 'Application for Building Permit and Inspection' form at Town Hall.

Verified 2026-07-06 · Source

Requirements

  • Building permit required for construction, alteration, repair, moving, or demolition of a structure within Duncan town limits, per Town Code Chapter 7
  • Work must conform to the Building, Plumbing, Gas, and Electrical Codes of the Town of Duncan as referenced on the permit application
  • Application must state size, wall/roof/floor materials, use, approximate cost, location/APN, owner, and contractor
  • Whenever a building permit is issued, the building must also conform to the Town's Zoning Ordinance (Town Code § 7-1-2)
  • Contractor Tax License required to be listed if estimated project valuation exceeds $50,000 (per the combined Zoning/Building/Historic District/Floodplain Permit form)
  • Approved in person by the Building Official; no online submittal portal is published

Required documents

  • RequiredApplication for Building Permit and InspectionTown of Duncan's one-page building permit application — General Description checkboxes for Construction/Alteration/Repair/Moving/Demolition, size, wall/roof/floor materials, use, approximate cost, location/APN, owner, and contractor
  • OptionalZoning Use, Building, Historic District and Floodplain PermitCombined multi-track permit form used when zoning use review, historic district review, and/or floodplain review also apply to the same project

Fee schedule

Fee typeAmountNotes
Building Permit Fee$30.00 plus $4.11 per $1,000 of valuationTown of Duncan Schedule of Fees and Charges (Fee-Schedule-5.2026.pdf, header-labeled 'PROPOSED'), Planning and Zoning section, Building Permits item B — this figure is unchanged from the prior (2023) fee schedule revision, so it is stable across at least two published revisions
Building Permit Renewal50% of the original permit feeTown of Duncan Schedule of Fees and Charges, Building Permits item C
Building Plan Review65% of the Building Permit FeeTown of Duncan Schedule of Fees and Charges, Building Permits item D

Mobile Home Permit

Verified

A separately fee-scheduled permit for placement of a mobile/manufactured home within the Town of Duncan, distinct from the general Building Permit fee line on the Town's Schedule of Fees and Charges.

Verified 2026-07-06 · Source

Requirements

  • Separate Mobile Home Permit fee line applies (distinct from the standard valuation-based Building Permit fee formula)
  • Manufactured/mobile home construction and installation standards themselves are set at the State level (Arizona Department of Fire, Building and Life Safety / Office of Manufactured Housing, per A.R.S. Title 41), consistent with statewide practice; the Town's Mobile Home Permit covers local placement/site approval
  • Submitted via the same 'Application for Building Permit and Inspection' form used for general building permits (the form's 'General Description of Proposed Work' does not have a distinct mobile-home checkbox; the Mobile Home Permit is distinguished purely by its separate fee-schedule line item)

Required documents

  • RequiredApplication for Building Permit and InspectionSame general-purpose Town of Duncan building permit application used for mobile home placement

Fee schedule

Fee typeAmountNotes
Mobile Home Permit$50.00Town of Duncan Schedule of Fees and Charges (Fee-Schedule-5.2026.pdf, header-labeled 'PROPOSED'), Planning and Zoning section, Building Permits item A. Flagged for confidence: an earlier (2023) fee schedule revision lists this same line item at $400.00 rather than $50.00 — a substantial change between the two published revisions found. The 5.2026 version is the most recently dated document currently linked from the Town's live site, so its $50.00 figure is used as current, but this is a genuine downward revision worth re-confirming directly with Town Hall given the size of the discrepancy between the two source documents.

Zoning Use Permit

Verified

Required whenever a proposed use or structure must be confirmed against the Town's Zoning Ordinance (Town Code Chapter 15), administered through the combined Zoning Use, Building, Historic District and Floodplain Permit form and, where the requested use is not permitted outright, routed to the Planning & Zoning Commission or, on appeal/variance, the Board of Adjustment.

Verified 2026-07-06 · Source

Requirements

  • Zoning Use Permit required to confirm a proposed use/structure complies with existing zoning (Town Code Chapter 15, Zoning Regulations)
  • A 'Use Permitted on Appeal' (variance) route exists through the Planning & Zoning Commission, with a further Board of Adjustment hearing route for amendments (changed use)
  • A Zoning Use Permit becomes void six months after issuance unless substantial utilization has begun
  • The permit must be posted on-site during construction
  • Property may be subject to erosion hazards and other unmapped floodplains beyond what is shown on FEMA mapping; the floodplain data the Town relies on is the best available, and the owner is responsible for providing additional technical floodplain information

Required documents

  • RequiredZoning Use, Building, Historic District and Floodplain PermitTown of Duncan's combined permit form covering Zoning Use Permit, Use Permitted on Appeal (Variance), Amendment (changed use), Building Permit, Septic System Permit, and Floodplain Permit (NFIP) tracks on a single document

Fee schedule

Fee typeAmountNotes
Amendment Application$200Town of Duncan Schedule of Fees and Charges, Planning and Zoning section, item 2
Appeal to Board of Adjustments$200Town of Duncan Schedule of Fees and Charges, Planning and Zoning section, item 3
Administrative Permits$50Town of Duncan Schedule of Fees and Charges, Planning and Zoning section, item 4
Petition Exception$200Town of Duncan Schedule of Fees and Charges, Planning and Zoning section, item 5
Reversion of Acreage or Abandonment$300Town of Duncan Schedule of Fees and Charges, Planning and Zoning section, item 6

Floodplain Development Permit (NFIP)

Verified

Required before construction or development begins within any area of special flood hazard in Duncan, per Town Code Chapter 8 (Flood Damage Prevention), enacted under A.R.S. § 48-3610. Administered by the Town Manager (or designee) as Floodplain Administrator, and represented as its own 'Floodplain Permit (NFIP)' line on the Town's combined permit form.

Verified 2026-07-06 · Source

Requirements

  • Development Permit required before construction or development begins within any area of special flood hazard (Town Code § 8-1-7.1)
  • Application must include plans in duplicate drawn to scale showing the nature, location, and elevation of the area in question; existing/proposed structures; fill; storage of materials; and drainage facilities
  • Must show proposed elevation (relative to mean sea level) of the lowest floor (including basement) of all structures; in Zone AO, elevation of existing grade and proposed elevation of lowest habitable floor
  • Must show proposed elevation to which any structure will be floodproofed, with certification by a registered professional engineer or architect where floodproofing is used
  • Base flood elevation data required for subdivision proposals or other development greater than 50 lots or 5 acres
  • Description required of the extent to which any watercourse will be altered or relocated as a result of the proposed development
  • The Floodplain Administrator (Town Manager or designee) reviews every permit to confirm ordinance requirements are met, other required state/federal permits have been obtained, the site is reasonably safe from flooding, and the development does not adversely affect (i.e., raise base flood elevation by more than one foot at any point) the floodway's carrying capacity

Required documents

  • RequiredZoning Use, Building, Historic District and Floodplain PermitTown of Duncan's combined permit form; Floodplain Permit (NFIP) section requires Date of Approval and confirms whether blueprints are approved
  • RequiredDevelopment Permit plan setPlans in duplicate, drawn to scale, per Town Code § 8-1-7.1 requirements (site elevations, structures, fill, drainage, floodproofing certification where applicable)

Fee schedule

Fee typeAmountNotes
Floodplain Permit (NFIP)Non-refundable fee (amount not separately itemized on the Town's published Schedule of Fees and Charges)The combined Zoning Use/Building/Historic District/Floodplain Permit form has a 'Non-refundable fee received by' line under a general 'Fees' section, but the Town's Schedule of Fees and Charges does not list a distinct dollar figure specifically labeled for the Floodplain Permit (NFIP) line, separate from the general Building Permit valuation-based fee. Source: Town of Duncan Zoning Use, Building, Historic District and Floodplain Permit form; Town of Duncan Schedule of Fees and Charges (no distinct Floodplain Permit fee line found).

Solar PV Permit (via General Building Permit)

Verified

Required for installation of rooftop or ground-mounted solar photovoltaic systems in Duncan. The Town of Duncan does not maintain a separate electrical or solar-specific permit — a single unified Building Permit, billed on the Town's standard valuation-based fee formula, covers all construction work including electrical/interconnection work for a solar installation. Under Arizona Revised Statutes § 9-468 (Solar construction permits; standards), the Town must accept standardized plan content for solar photovoltaic systems (roof plan/elevation, panel mounting details, one-line or three-line electrical diagrams unless a qualified automated permitting platform is used, and inverter cut sheets for DC-to-AC conversion), may not require a professional engineer's stamp unless deemed necessary, and any permit fee charged must be attributable to and may not exceed the actual cost of issuing the permit.

Verified 2026-07-20 · Source

Requirements

  • Submit a Building Permit application to the Town of Duncan for the solar PV installation — there is no separate electrical or solar-specific permit application
  • Per A.R.S. § 9-468, plans must show: the location of the photovoltaic system on construction plans (roof plan and elevation), panel mounting details, and an electrical diagram (one-line or three-line) unless a qualified online automated permitting platform is used to verify code compliance
  • For DC-to-AC conversion, include cut sheets and listings for the inverter(s)
  • The Town may not require a stamp from a professional engineer for the solar photovoltaic system unless an engineering stamp is deemed necessary
  • Per A.R.S. § 9-468, any fee charged must be attributable to and may not exceed the Town's actual cost of issuing the permit; a written, itemized list of costs must be provided at the permittee's request

Required documents

  • RequiredApplication for Building Permit & InspectionTown of Duncan's standard building permit application, used for solar PV installations since no separate solar/electrical application exists

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based (governs solar PV installations, no distinct solar line)$30.00 plus $4.11 per $1,000 of valuationTown of Duncan Schedule of Fees and Charges, 'Planning and Zoning' section, item 1.B 'Building Permit'; directly fetched and text-extracted from the Town's own fee-schedule PDF. No separate electrical or solar/photovoltaic fee line exists — Duncan's permitTypes in this dataset confirm no standalone electrical-permit entry, consistent with a single unified Building Permit covering all trades. Per A.R.S. 9-468, this fee (as applied to solar) may not exceed the Town's actual cost of issuing the permit.
Building Plan Review Fee65% of the Building Permit FeeTown of Duncan Schedule of Fees and Charges, item 1.D

EV Charger / EVSE Permit (via General Building Permit)

Verified

Required for installation of an electric vehicle charging station in Duncan. As with solar PV (see this file's solar-pv-permit entry), the Town of Duncan does not maintain a separate electrical permit at all — its permitTypes are limited to a single general-purpose Building Permit, a Mobile Home Permit, a Zoning Use Permit, and a Floodplain Development Permit. An EV charger circuit or wall-mounted charging unit is therefore filed as a standard Building Permit on the Town's one-page 'Application for Building Permit and Inspection' form (checking 'Alteration' or 'Repair' as appropriate), billed on the Town's standard valuation-based fee formula — there is no distinct EV-charger/EVSE line anywhere in the Town's Schedule of Fees and Charges.

Verified 2026-07-20 · Source

Requirements

  • Submit a Building Permit application to the Town of Duncan for the EV charger installation — there is no separate electrical permit application, confirmed across every permitType this file documents for Duncan
  • Work must conform to the Building, Plumbing, Gas, and Electrical Codes of the Town of Duncan as referenced on the permit application, including the National Electrical Code (adopted as 'current edition,' Town Code Article 7-3)
  • Application must state the scope of work, approximate cost/valuation, location/APN, owner, and contractor, using the General Description checkboxes (Construction/Alteration/Repair/Moving/Demolition)
  • Approved in person by the Building Official (Town Manager's office); no online submittal portal is published

Required documents

  • RequiredApplication for Building Permit and InspectionTown of Duncan's standard building permit application, used for EV charger installations since no separate electrical application exists

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based (governs EV charger installations, no distinct EV/electrical line)$30.00 plus $4.11 per $1,000 of valuationTown of Duncan Schedule of Fees and Charges, Planning and Zoning section, item 1.B 'Building Permit' — the same fee line already documented on this file's solar-pv-permit entry, since Duncan has no standalone electrical or EV-charger fee line at all
Building Plan Review Fee65% of the Building Permit FeeTown of Duncan Schedule of Fees and Charges, item 1.D

Sign Permit (No Distinct Product — Regulated Directly Under the Zoning Ordinance)

The Town of Duncan does not issue a separate, freestanding 'sign permit' with its own application or fee line. Signage is instead regulated directly by the Zoning Ordinance's district-specific 'Accessory Signs' provisions (Town Code Chapter 15, §§ 15-4-2(I) Commercial Zone and 15-5-2(K) Industrial Zone, Rev. 03/20). Most small commercial signage (a single wall/painted sign, one overhanging sign up to 8 sq ft, or a parking-lot sign up to 6 sq ft) requires no permit or fee at all. The one sign type that does require formal approval — a free-standing sign — is routed through the same Planning & Zoning Commission recommendation / Board of Adjustment approval process already used for the Town's Zoning Use Permit (documented separately in this file's zoning-use-permit entry), not through a distinct sign-specific application or fee.

Reviewed 2026-07-23 · Source

Requirements

  • Parking lot signs: permitted outright, not to exceed six (6) square feet in size, no P&Z/Board of Adjustment approval required (Town Code §§ 15-4-2(I)(1), 15-5-2(K)(1))
  • One free-standing sign per business establishment: requires Planning & Zoning Commission recommendation AND Board of Adjustment approval — this is the only Duncan sign type that requires a discretionary approval, and it is processed via the same combined Zoning Use, Building, Historic District and Floodplain Permit form and P&Z/BOA hearing track as the Town's general Zoning Use Permit (Town Code §§ 15-4-2(I)(2), 15-5-2(K)(2))
  • One overhanging (projecting) sign per business establishment: permitted outright up to eight (8) square feet, no separate approval stated (Town Code §§ 15-4-2(I)(3), 15-5-2(K)(3))
  • Signs painted on or attached flat to the building: unrestricted, no approval required (Town Code §§ 15-4-2(I)(4), 15-5-2(K)(3, unnumbered continuation))
  • Brightly lighted, flashing signs and non-accessory signs/billboards are prohibited outright in the Commercial and Industrial zones (Town Code §§ 15-4-2(I)(5-6), 15-5-2(K))
  • Political/campaign signs limited to 4' x 6', displayed only with property owner permission, and must be removed within 30 days of the election or removal costs are billed to the candidate (Town Code Chapter 15 definitions, 'Political/Campaign Sign')
  • Event signs (yard sales, weddings, parties, etc.) limited to 2' x 3', displayed only with property owner permission, and must be removed within 3 days of the event (Town Code Chapter 15 definitions, 'Event Sign')
  • No sign of any kind may be placed on private or public property without the owner's approval, and no sign may obstruct the view of traffic (Town Code Chapter 15 definitions, 'Sign')

Required documents

  • OptionalZoning Use, Building, Historic District and Floodplain PermitSame combined permit form used for the Town's general Zoning Use Permit — used only for the one sign type that requires discretionary approval (a free-standing sign), via its Zoning Use Permit / P&Z Commission and Board of Adjustment tracks. No sign-specific application form is published.

Fee schedule

Fee typeAmountNotes
No distinct sign-permit fee existsNot applicable for most signage; a free-standing sign requiring Board of Adjustment approval would fall under this file's existing Zoning Use Permit fee lines (e.g., Amendment Application $200, or Administrative Permits $50) rather than a dedicated sign feeChecked the Town's full Schedule of Fees and Charges (Fee-Schedule-5.2026.pdf) line by line — there is no 'sign,' 'signage,' or 'sign permit' fee line anywhere in the Planning and Zoning section. The zoning code's Accessory Sign provisions govern signage directly without creating a separate fee product.

Fire Sprinkler & Fire Alarm Permit (Duncan Valley Rural Fire District)

Fire protection within the Town of Duncan is provided not by the Town itself but by the Duncan Valley Rural Fire District (DVRFD), an independent special taxing district headquartered at 903 SE Old West Highway, Duncan, AZ (separate from Town Hall), confirmed on the Town's own Services & Fees page ('Duncan Valley Rural Fire District — Call 911 for emergencies'). DVRFD's own website (duncanfireaz.org) states that permits are required for building fire life safety features, fire hydrant systems, fire sprinkler systems, fire alarm systems, and commercial hood systems, and that all plans/specifications for new commercial construction, remodeling, alterations, or Operational Permits must be submitted to DVRFD for review and approval prior to construction or operation, per the 2018 International Fire Code (I.F.C.) plus DVRFD code amendments. This is a genuine, separate permit product from the Town's Building Permit — it is issued and reviewed by the fire district, not the Town Manager's Building Official function.

Reviewed 2026-07-23 · Source

Requirements

  • Permits required for building fire life safety features, fire hydrant systems, fire sprinkler systems, fire alarm systems, and commercial hood systems (Duncan Valley Rural Fire District, Permits & Plan Review page)
  • Plans/specifications for new commercial construction, remodeling, alterations, or Operational Permits must be submitted to DVRFD for review and approval prior to any construction or operation, and must comply with the 2018 I.F.C. plus DVRFD code amendments
  • Submittal must include a copy of the Town of Duncan Building Permit
  • Submittal must include one copy of architectural drawings (site plan, civils, structural, mechanical, and electrical)
  • Fire protection system plans require Engineering or N.I.C.E.T. approval
  • Water supply and fire-flow requirements for the building and fire protection systems must be documented
  • An 8.5" x 11" fire escape plan is required showing occupant load, use of each room, and exit routes for occupant loads over 50
  • Submittal must show the location of the main fire alarm control panel, fire sprinkler riser room, Fire Department Connection (F.D.C.), and Knox lock box

Required documents

  • RequiredFire Protection Systems Plan SetArchitectural drawings (site plan, civils, structural, mechanical, electrical) plus fire-protection-system-specific plans (sprinkler/alarm/hydrant/hood as applicable) bearing Engineering or N.I.C.E.T. approval; no standardized fire-district application form is published on DVRFD's website
  • RequiredCopy of Town of Duncan Building PermitDVRFD requires a copy of the Town's own Building Permit as part of its submittal package, confirming the two review tracks (Town building permit and fire-district plan review) run in parallel for the same project

Fee schedule

Fee typeAmountNotes
Fire sprinkler / fire alarm / hydrant / commercial hood system permit or plan-review feeNot publicly publishedExhaustively chased: fetched DVRFD's live Permits & Plan Review page (no fee stated), every other page on the DVRFD site (Home, Meet the Fire Chief, Fire District Board, Board Agendas, Do I Live in the District, Annexation, ISO PPC, Operations, Training, Open Burn Permits, Fire Restrictions, Knox Box Information, Volunteer, Contact) — none states a permit or plan-review fee — and DVRFD's own published 'FEE SCHEDULE' document (Resolution 2017-12-1, adopted 12/12/2017, revised 8/13/2019, at duncanfireaz.org/_files/ugd/482aa6_ccebcc282f8b49e3aa278dbc470b204e.pdf), which covers only emergency-response billing (apparatus/hourly rates, false-alarm fees) and public-records-request fees — it contains no line item for a construction permit, plan review, or fire-system inspection fee. This is a genuine, confirmed gap, not an oversight — contact DVRFD directly at (928) 362-2485 for a project-specific quote.

Change of Use (No Distinct Certificate-of-Occupancy Process — Routed Through the Zoning Use Permit's Amendment Track)

The Town of Duncan does not issue a Certificate of Occupancy and has no standalone 'change of use permit.' Town Code Chapter 7 (Building) contains no occupancy-certificate or final-occupancy-sign-off provision of any kind, and no such document appears on the Town's Building Permits & Fees page, the Application for Building Permit and Inspection form, or the combined Zoning Use, Building, Historic District and Floodplain Permit form. Instead, a change in use is handled as the 'Amendment (changed use)' line already present on that combined permit form — the same Board of Adjustment hearing track documented in this file's zoning-use-permit entry — and, in at least the Public Zone (Town Code § 15-7-3(D)-(E), Rev. 03/20), an explicit 'change of use variance' can trigger added off-street parking and loading-space requirements once a specific use classification changes.

Reviewed 2026-07-23 · Source

Requirements

  • No Certificate of Occupancy is issued by the Town of Duncan for any use — confirmed absent from Town Code Chapter 7 (Building, Rev. 6/06), the Building Permits & Fees page, the Application for Building Permit and Inspection form, and the combined Zoning Use/Building/Historic District/Floodplain Permit form
  • A change of use is processed via the 'Amendment (changed use)' line on the combined Zoning Use, Building, Historic District and Floodplain Permit form, which routes to a Board of Adjustment hearing (per Town Council, per the form's own labeling) — the identical track documented in this file's zoning-use-permit entry
  • In the Public Zone specifically, a 'change of use variance' after the code's effective date triggers off-street parking at 3 spaces per 1,000 sq ft of floor space (1 space per 5 seats for churches) and, for buildings of 2,000 sq ft or more receiving/distributing merchandise by vehicle, at least one off-street loading space of 10' x 25' x 14' (Town Code § 15-7-3(D)-(E))
  • As with any Zoning Use Permit action, the resulting permit becomes void six months after issuance unless substantial utilization has begun, and must be posted on-site during construction

Required documents

  • RequiredZoning Use, Building, Historic District and Floodplain PermitSame combined form documented in this file's zoning-use-permit entry; a change of use is checked/processed on its 'Amendment (changed use)' line rather than on a separate change-of-use or certificate-of-occupancy form

Fee schedule

Fee typeAmountNotes
Amendment Application$200Same fee line already documented on this file's zoning-use-permit entry (Town of Duncan Schedule of Fees and Charges, Planning and Zoning section, item 2) — Duncan has no separate 'change of use' or 'certificate of occupancy' fee line distinct from this Amendment Application fee.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Duncan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-06)View current record →All versions →