Required as part of the same permitting sequence as the Zoning Use Permit for any construction in a special flood hazard area of unincorporated Greenlee County. Issuance of the Floodplain Permit (together with the Zoning Use Permit) is what triggers the no-cost county Building Permit. The Planning and Zoning Department's own page lists this as one of its three core permit types, alongside Zoning Use Permits and Building Permits.

Reviewed 2026-07-07 · Source

When you need this permit

  • Required for construction or development within a designated special flood hazard area of unincorporated Greenlee County
  • Processed as part of the same Greenlee County Permit Application used for the Zoning Use Permit — no separate application form was located
  • Issued together with the Zoning Use Permit; both are prerequisites for the no-cost Building Permit per the county's own October 2012 Engineering letter

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Floodplain Permit fee
The county's Flood Control Ordinance governs this permit (title page: 'Greenlee County Flood Control Ordinance, Revision 1, Adopted May 3, 2016,' document footer dated 06/29/2016; Show full citationThe county's Flood Control Ordinance governs this permit (title page: 'Greenlee County Flood Control Ordinance, Revision 1, Adopted May 3, 2016,' document footer dated 06/29/2016; the ordinance calls the permit a 'Development Permit'). Sec. 7.1 states the Flood Control District 'may from time to time adopt fees for the administration of this Ordinance... attached at Appendix B'; Sec. 7.2 states outright 'No fee shall be charged for a Development Permit'; and Appendix B, headed 'Fees,' states 'None as of June 29, 2016.' The county's own copy is currently hard to reach: the ordinance page at https://greenlee.az.gov/ova_doc/floodplains-ordinance/ is live, but its embedded PDF link points to https://gcdev.bits.guru/wp-content/uploads/2023/09/Floodplains-Ordinance.pdf, which no longer resolves, as does the production path https://greenlee.az.gov/wp-content/uploads/2023/09/Floodplains-Ordinance.pdf. A readable copy is preserved at https://web.archive.org/web/20250713142458/https://greenlee.az.gov/wp-content/uploads/2023/09/Floodplains-Ordinance.pdf. Because the fee provision cannot be confirmed against a live county copy, confirm directly with Planning and Zoning (928-865-4762) that the $0 fee provision remains in effect before relying on it.
$0 — 'No fee shall be charged for a Development Permit' (per the county's own Flood Control Ordinance, Sec. 7.2)

Review timeline

Plan review
Not published — contact the department

How long did your Floodplain Permit permit actually take in Unincorporated Greenlee County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    Tips

    • The Floodplain Permit and Zoning Use Permit are processed together, not as fully separate application tracks, based on the county's own description of its permitting sequence.
    • Greenlee County's elevations range from about 3,200 to 8,000 feet with widely varying conditions across the county; confirm with Planning and Zoning whether a specific parcel falls within a mapped special flood hazard area before starting design work.

    Frequently asked questions

    Unincorporated Greenlee County requires a floodplain permit for: Required for construction or development within a designated special flood hazard area of unincorporated Greenlee County; Processed as part of the same Greenlee County Permit Application used for the Zoning Use Permit — no separate application form was located; Issued together with the Zoning Use Permit; both are prerequisites for the no-cost Building Permit per the county's own October 2012 Engineering letter. If your project isn't listed, confirm with Greenlee County Planning and Zoning Department at 928-865-4762 before starting work.

    In Unincorporated Greenlee County, the published Floodplain Permit fee is: $0 — 'No fee shall be charged for a Development Permit' (per the county's own Flood Control Ordinance, Sec. 7.2). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    Unincorporated Greenlee County does not publish a plan-review timeline for this permit. Contact Greenlee County Planning and Zoning Department at 928-865-4762 for current turnaround.

    You'll need: Greenlee County Permit Application (PDF). See the required-documents checklist on this page for details on each.

    Apply through Greenlee County Planning and Zoning Department at 253 Fifth Street (2nd Floor Annex), P.O. Box 908, Clifton, Arizona 85533. Phone: 928-865-4762, email: planning@greenlee.az.gov. Office hours: Monday-Thursday, 7:00 a.m. - 5:00 p.m. (closed Friday-Sunday, per Greenlee County's 4-day workweek). Official information: https://greenlee.az.gov/ova_dep/planning-and-zoning/.

    Unincorporated Greenlee County, Arizona has adopted: Greenlee County has adopted no building codes for unincorporated areas of the county. A signed letter from the County Engineer (Philip Ronnerud) on Greenlee County Engineering letterhead, dated October 19, 2012 and published on the county's own website as 'Building Codes and Loading Standards', states: 'Currently, Greenlee County has adopted no building codes. Because we have no codes, Greenlee County has not determined and does not recommend building loads, does not review plans, does not inspect construction, or issue a Certificate of Occupancy. I suggest that owners contract for inspections and use a conservative Building Code.' No later ordinance or county communication supersedes that policy. Source: Greenlee County Engineering letter, 'Building Codes and Loading Standards' (PDF), published at https://greenlee.az.gov/ova_doc/building-codes-and-loading-standards/, October 19, 2012, signed by Philip Ronnerud, Engineer.; Because no code has been adopted, the county's building permit is a zoning/floodplain clearance mechanism, not a construction-code plan-review permit. Per the same October 2012 Engineering letter: 'With some exceptions, Arizona Law requires the County to issue a building permit. We issue a building permit at no cost when a Zoning Use Permit and Floodplain Permit are issued. We have a fee for the Zoning Use Permit. An address is provided with the Zoning Use Permit.' The Planning and Zoning Department's own page confirms the same three-permit structure: 'The Planning Office issues Zoning Use Permits, Building Permits for site built homes, and Floodplain Permits... Some permits can be issued via the telephone.' Source: Greenlee County Planning and Zoning page (https://greenlee.az.gov/ova_dep/planning-and-zoning/); October 2012 Engineering letter.; The Zoning Division (housed within the Planning and Zoning Department) 'is responsible for the issuance of building and use permits (both residential and commercial), the enforcement of the Zoning Regulations; including violations and the abatement of hazards.' The Planning Division separately handles special use requests, rezoning, home occupations, accessory living quarters applications, lot modifications, variances to the Zoning Regulations, and subdivisions. Source: Greenlee County Planning and Zoning page.; Manufactured/mobile home permits and septic (on-site wastewater) system permits are NOT handled by Planning and Zoning — they are issued by the Greenlee County Health Department instead. Source: Greenlee County Planning and Zoning page: 'Manufactured Home permits and septic system permits are issued by the Health Department.'; The county publishes no county-wide loading/design-criteria table of its own (unlike, e.g., Yavapai County's published Climatic and Geographic Design Criteria table). Instead, the same October 2012 Engineering letter provides only illustrative historical context: a November 1967 snowstorm produced approximately 34 inches of snowfall in Stargo (elevation 5,400 ft, immediately north of Morenci) and approximately 24 inches in Clifton (elevation 3,400 ft), causing several roof collapses; county elevations range from 3,200 to 8,000 feet with greatly varying conditions. The letter cites recorded snow-load design figures used on specific PUBLIC buildings from plans in the county's files (not a universal private-construction standard): LDS Stake Center, Duncan — 40 psf; Morenci High School — 30 psf (non-reducible); Morenci Swimming Pool — 30 psf (non-reducible); County Annex, Clifton (1970) — 20 psf live load, no snow load noted. For PUBLIC buildings specifically, the letter notes that under A.R.S. § 34-461, a county must use the building code of the largest municipality in the county (which, per the same letter's own citation of a 2006 Trueline Engineering report, is the Town of Duncan's adopted 1997 Uniform Building Code: minimum basic wind speed 70 mph per Figure 16-1; ground snow load Pg established by the building official, use 10 psf, per Figure A-16-1). None of this constitutes an adopted code or standard for PRIVATE construction in unincorporated Greenlee County — the letter's own recommendation for private owners is only to 'contract for inspections and use a conservative Building Code' voluntarily. Source: October 2012 Engineering letter; A.R.S. § 34-461.; Morenci is an unincorporated community within unincorporated Greenlee County, historically built and still substantially maintained as a company town by Freeport-McMoRan (successor to Phelps Dodge) in connection with the adjacent Morenci open-pit copper mine. Freeport-McMoRan's own 'Townsite Maintenance' department 'oversees maintenance and construction of all townsite facilities, including all residences, commercial buildings, streets, parks and grounds' for the approximately 1,600 homes comprising the Morenci townsite, and a separate Freeport-McMoRan-Morenci Housing Office (899 Reservation Rd, Morenci, AZ 85540) administers employee housing assignments (including a $750/month housing allowance option for employees required to work on-site). This is real, sourced, and confirms the task's hypothesis of an unusual private/company arrangement for day-to-day townsite construction and maintenance — BUT Morenci has no separate incorporated government and no distinct public building-permit authority of its own; it is NOT a chartered town or city and does not appear in the Census Bureau's Arizona place FIPS file. Any construction in Morenci that is not purely internal company townsite maintenance (e.g., work by outside parties, or any activity triggering the state-law building-permit requirement) falls under Greenlee County's Planning and Zoning permitting jurisdiction described above, on the same basis as the rest of unincorporated Greenlee County. Source: Morenci Town / Freeport-McMoRan community pages (https://www.morencitown.com/, https://www.morencitown.com/residents/, https://www.morencitown.com/index.php/about_us); Freeport-McMoRan-Morenci Housing Office listing (899 Reservation Rd, Morenci, AZ 85540).. Local amendments apply — see the Unincorporated Greenlee County overview page for the full list.

    The county's Building Permit for site-built homes is issued at no cost once BOTH a Zoning Use Permit and a Floodplain Permit are issued — the Floodplain Permit is a prerequisite step in the same overall process rather than an unrelated, independent permit track. Source: Greenlee County Engineering letter, October 19, 2012.

    Sources & verification

    Key facts verified against official sources. Last reviewed 2026-07-07.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Greenlee County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

    Unincorporated Greenlee County's permit history isn't searchable here yet

    This page covers what the permit requires. What we don't have for Unincorporated Greenlee County yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

    Your email, and the place — never an address. We only use it to tell you when Unincorporated Greenlee County lands. Privacy.

    Compare floodplain permit fees across Arizona

    Look up this fee in a different city →

    Embed this data card →

    Now live

    Build your Unincorporated Greenlee County project checklist

    Describe your project once and get every permit, document, and fee it triggers in Unincorporated Greenlee County — in one checklist. Free, for any city and any number of projects.

    Get started →