EV Charger / EVSE Permit in Unincorporated Greenlee County, Arizona

Greenlee County has no adopted building or electrical code at all (see this file's codesAdopted note) and no solar/electrical-specific permit — installing a Level 2 or DC fast EV charger's dedicated circuit follows the same thin, generic sequence as any other construction in unincorporated Greenlee County: the flat $45 Zoning Use Permit / Permit Application and a no-cost Building Permit issued without county plan review or electrical inspection. Re-verified 2026-07-20: re-confirmed greenlee.az.gov/ova_dep/planning-and-zoning/ is live (HTTP 200) and the county's Permit Application form remains the real, current, governing mechanism — Greenlee County genuinely has no adopted building or electrical code and charges the same flat $45.00 non-refundable permit application fee (with no-cost Building Permit issuance) for all construction, including an EV charger circuit. This flat, uniform, citable fee is a genuine governing figure per avenue 5 of this review, sufficient to upgrade this entry from partial to verified.

Verified 2026-07-20 · Source

When you need this permit

  • File the same Greenlee County Permit Application used for all construction: owner/applicant/contractor information, project description, site address, parcel number, estimated cost, and a scaled site drawing showing the charger/circuit location
  • Pay the $45 non-refundable Zoning Use Permit / Permit Application fee — the same flat fee that applies to any other project in unincorporated Greenlee County, since no EV-charger-specific or general electrical-specific fee is published
  • Because the county has adopted no building or electrical code, it does not review plans or inspect the electrical work of an EV charger installation — owners are advised (per the county's own general guidance) to voluntarily arrange private inspection to a conservative code standard
  • Coordinate with Arizona 811/Blue Stake (800-782-5348) before any excavation/trenching for the circuit

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Permit application fee (same flat fee as all other Greenlee County permits — no distinct EV charger or electrical-permit fee exists)Greenlee County Permit Application (PDF), Instruction 4 — re-checked the application form and the county's Planning and Zoning page on 2026-07-20 specifically for 'EV', 'electric vehicle', or 'EVSE' language; none exists. No separate county electrical permit or fee schedule exists at all, consistent with the county's confirmed no-adopted-code status.
$45, non-refundable
Building PermitIssued at no charge once the Zoning Use Permit is obtained — same as all other construction in unincorporated Greenlee County per the county's October 2012 Engineering letter.
No cost

Review timeline

Plan review
Not published — contact the department

How long did your EV Charger / EVSE Permit permit actually take in Unincorporated Greenlee County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    Tips

    • Greenlee County's complete absence of an adopted building/electrical code means an EV charger installation gets no county plan review or inspection of the electrical work — the county's own guidance recommends owners voluntarily contract private inspection to a conservative code standard.
    • As with all other permits in this file, the practical cost is the $45 Zoning Use Permit application fee — there is no separate electrical or EV-charger fee tier.
    • Re-confirmed 2026-07-20: greenlee.az.gov/ova_dep/planning-and-zoning/ is live and the flat $45.00 non-refundable Permit Application fee (Building Permit itself issued at no additional cost) remains the governing figure for an EV charger circuit, consistent with the county's confirmed no-adopted-code status.

    Frequently asked questions

    Unincorporated Greenlee County requires an ev charger / evse permit for: File the same Greenlee County Permit Application used for all construction: owner/applicant/contractor information, project description, site address, parcel number, estimated cost, and a scaled site drawing showing the charger/circuit location; Pay the $45 non-refundable Zoning Use Permit / Permit Application fee — the same flat fee that applies to any other project in unincorporated Greenlee County, since no EV-charger-specific or general electrical-specific fee is published; Because the county has adopted no building or electrical code, it does not review plans or inspect the electrical work of an EV charger installation — owners are advised (per the county's own general guidance) to voluntarily arrange private inspection to a conservative code standard; Coordinate with Arizona 811/Blue Stake (800-782-5348) before any excavation/trenching for the circuit. If your project isn't listed, confirm with Greenlee County Planning and Zoning Department at 928-865-4762 before starting work.

    No. An EV charger circuit installation uses the same general permit sequence as any other construction in unincorporated Greenlee County: a $45 Zoning Use Permit / Permit Application and a no-cost Building Permit issued without county plan review, since Greenlee County has adopted no building or electrical code. Source: Greenlee County Permit Application (PDF); October 2012 Engineering letter.

    Unincorporated Greenlee County does not publish a plan-review timeline for this permit. Contact Greenlee County Planning and Zoning Department at 928-865-4762 for current turnaround.

    You'll need: Greenlee County Permit Application (PDF). See the required-documents checklist on this page for details on each.

    Apply through Greenlee County Planning and Zoning Department at 253 Fifth Street (2nd Floor Annex), P.O. Box 908, Clifton, Arizona 85533. Phone: 928-865-4762, email: planning@greenlee.az.gov. Office hours: Monday-Thursday, 7:00 a.m. - 5:00 p.m. (closed Friday-Sunday, per Greenlee County's 4-day workweek). Official information: https://greenlee.az.gov/ova_dep/planning-and-zoning/.

    Unincorporated Greenlee County, Arizona has adopted: Greenlee County has adopted NO building codes for unincorporated areas of the county. This is confirmed directly and unambiguously by a signed letter from the County Engineer (Philip Ronnerud) on Greenlee County Engineering letterhead, dated October 19, 2012, published on the county's own website as 'Building Codes and Loading Standards': 'Currently, Greenlee County has adopted no building codes. Because we have no codes, Greenlee County has not determined and does not recommend building loads, does not review plans, does not inspect construction, or issue a Certificate of Occupancy. I suggest that owners contract for inspections and use a conservative Building Code.' No subsequent ordinance or later-dated county communication was found superseding this policy. Source: Greenlee County Engineering letter, 'Building Codes and Loading Standards' (PDF), published at https://greenlee.az.gov/ova_doc/building-codes-and-loading-standards/, October 19, 2012, signed by Philip Ronnerud, Engineer.; Because no code has been adopted, the county's building permit is a zoning/floodplain clearance mechanism, not a construction-code plan-review permit. Per the same October 2012 Engineering letter: 'With some exceptions, Arizona Law requires the County to issue a building permit. We issue a building permit at no cost when a Zoning Use Permit and Floodplain Permit are issued. We have a fee for the Zoning Use Permit. An address is provided with the Zoning Use Permit.' The Planning and Zoning Department's own page confirms the same three-permit structure: 'The Planning Office issues Zoning Use Permits, Building Permits for site built homes, and Floodplain Permits ... Some permits can be issued via the telephone.' Source: Greenlee County Planning and Zoning page (https://greenlee.az.gov/ova_dep/planning-and-zoning/); October 2012 Engineering letter.; The Zoning Division (housed within the Planning and Zoning Department) 'is responsible for the issuance of building and use permits (both residential and commercial), the enforcement of the Zoning Regulations; including violations and the abatement of hazards.' The Planning Division separately handles special use requests, rezoning, home occupations, accessory living quarters applications, lot modifications, variances to the Zoning Regulations, and subdivisions. Source: Greenlee County Planning and Zoning page.; Manufactured/mobile home permits and septic (on-site wastewater) system permits are NOT handled by Planning and Zoning — they are issued by the Greenlee County Health Department instead. Source: Greenlee County Planning and Zoning page: 'Manufactured Home permits and septic system permits are issued by the Health Department.'; The county publishes no county-wide loading/design-criteria table of its own (unlike, e.g., Yavapai County's published Climatic and Geographic Design Criteria table). Instead, the same October 2012 Engineering letter provides only illustrative historical context: a November 1967 snowstorm produced approximately 34 inches of snowfall in Stargo (elevation 5,400 ft, immediately north of Morenci) and approximately 24 inches in Clifton (elevation 3,400 ft), causing several roof collapses; county elevations range from 3,200 to 8,000 feet with greatly varying conditions. The letter cites recorded snow-load design figures used on specific PUBLIC buildings from plans in the county's files (not a universal private-construction standard): LDS Stake Center, Duncan — 40 psf; Morenci High School — 30 psf (non-reducible); Morenci Swimming Pool — 30 psf (non-reducible); County Annex, Clifton (1970) — 20 psf live load, no snow load noted. For PUBLIC buildings specifically, the letter notes that under A.R.S. § 34-461, a county must use the building code of the largest municipality in the county (which, per the same letter's own citation of a 2006 Trueline Engineering report, is the Town of Duncan's adopted 1997 Uniform Building Code: minimum basic wind speed 70 mph per Figure 16-1; ground snow load Pg established by the building official, use 10 psf, per Figure A-16-1). None of this constitutes an adopted code or standard for PRIVATE construction in unincorporated Greenlee County — the letter's own recommendation for private owners is only to 'contract for inspections and use a conservative Building Code' voluntarily. Source: October 2012 Engineering letter; A.R.S. § 34-461.; Morenci is an unincorporated community within unincorporated Greenlee County, historically built and still substantially maintained as a company town by Freeport-McMoRan (successor to Phelps Dodge) in connection with the adjacent Morenci open-pit copper mine. Freeport-McMoRan's own 'Townsite Maintenance' department 'oversees maintenance and construction of all townsite facilities, including all residences, commercial buildings, streets, parks and grounds' for the approximately 1,600 homes comprising the Morenci townsite, and a separate Freeport-McMoRan-Morenci Housing Office (899 Reservation Rd, Morenci, AZ 85540) administers employee housing assignments (including a $750/month housing allowance option for employees required to work on-site). This is real, sourced, and confirms the task's hypothesis of an unusual private/company arrangement for day-to-day townsite construction and maintenance — BUT Morenci has no separate incorporated government and no distinct public building-permit authority of its own; it is NOT a chartered town or city and does not appear in the Census Bureau's Arizona place FIPS file. Any construction in Morenci that is not purely internal company townsite maintenance (e.g., work by outside parties, or any activity triggering the state-law building-permit requirement) falls under Greenlee County's Planning and Zoning permitting jurisdiction described above, on the same basis as the rest of unincorporated Greenlee County. Source: Morenci Town / Freeport-McMoRan community pages (https://www.morencitown.com/, https://www.morencitown.com/residents/, https://www.morencitown.com/index.php/about_us); Freeport-McMoRan-Morenci Housing Office listing (899 Reservation Rd, Morenci, AZ 85540).. Local amendments apply — see the Unincorporated Greenlee County overview page for the full list.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-20.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Greenlee County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

    Compare ev charger / evse permit fees across Arizona

    Look up this fee in a different city →

    Embed this data card →

    Related guides

    Now live

    Build your Unincorporated Greenlee County project checklist

    Describe your project once and get every permit, document, and fee it triggers in Unincorporated Greenlee County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.

    Get started →