This is PermitBase’s published record for Glendale as of 2026-06-29. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Glendale building permits

Verified

Glendale, Arizona — as published 2026-06-29.

Verified 2026-06-29 · Source

Codes adopted

2024 International Building Code (IBC), including Appendices C and I, with Glendale amendments — adopted by Ordinance O25-51, effective January 9, 20262024 International Residential Code (IRC), including Appendices BB, BC, BF, BO and CF, with Glendale amendments — adopted by Ordinance O25-51, effective January 9, 20262024 International Existing Building Code (IEBC), with Glendale amendments — adopted by Ordinance O25-51, effective January 9, 20262024 International Mechanical Code (IMC), with Glendale amendments — adopted by Ordinance O25-51, effective January 9, 20262024 International Plumbing Code (IPC), including Appendices C and E, with Glendale amendments — adopted by Ordinance O25-51, effective January 9, 20262024 International Fuel Gas Code (IFGC), including Appendices A and B, with Glendale amendments — adopted by Ordinance O25-51, effective January 9, 20262024 International Fire Code (IFC), with Glendale amendments — adopted by Ordinance O25-52, effective January 9, 20262023 National Electrical Code (NEC), as published by the National Fire Protection Association — adopted by Ordinance O25-51, effective January 9, 20262024 International Property Maintenance Code (IPMC), with Glendale amendments — adopted by Ordinance O25-51, effective January 9, 20262024 International Energy Conservation Code (IECC), with Glendale amendments — adopted by Ordinance O25-51, effective January 9, 20262024 International Swimming Pool and Spa Code (ISPSC), with Glendale amendments — adopted by Ordinance O25-51, effective January 9, 20262024 International Green Construction Code (IgCC), as published by ICC — adopted by Ordinance O25-51 (voluntary compliance), effective January 9, 20262010 Americans with Disabilities Act Accessibility Guidelines; Arizonans with Disabilities Act (A.R.S. §§ 41-1492.03)ICC A117.1-2009 Accessible and Usable Buildings and FacilitiesCity of Glendale Revised Sound Attenuation StandardsMaricopa Association of Governments Fireplace StandardFair Housing Accessibility Guidelines (U.S. Department of Housing and Urban Development, March 6, 1991)

Permit types & fees

Residential Building Permit (Single Family / Custom Home)

Verified

Required for new single-family dwellings and custom homes in Glendale. The applicant submits a completed Permit/Plan Review Application (Residential) along with two sets of construction documents to the Development Services Center at 5850 West Glendale Avenue. Plans are reviewed for compliance with the 2024 Glendale building codes (adopted by Ordinance O25-51, effective January 9, 2026). The permit is issued once plans are approved and permit fees are paid. Inspections are scheduled by calling before 5 a.m. for a same-day inspection.

Verified 2026-06-29 · Source

Requirements

  • Submit a completed Permit/Plan Review Application (Residential 2026) with two sets of construction documents to the Development Services Center
  • Provide construction type, occupancy type, and construction valuation on the application (construction valuation includes all materials, labor, overhead, and profit)
  • Plans must comply with the 2024 International Residential Code and all other codes adopted by Ordinance O25-51 (effective January 9, 2026)
  • An Arizona ROC-licensed contractor is required unless the owner is building for sole personal occupancy and not offering for sale or rent within one year (ARS 32-1121)
  • Owner-builder applicants must complete the Owner Builder Addendum available from the Residential PDF forms page
  • Permit is valid for six months from the date of issuance; once work starts and first inspection passes, permit remains valid as long as work continues with inspections; if no inspection for six months, permit expires

Required documents

  • RequiredPermit/Plan Review Application — Residential (2026)Current (2026) single-family residential permit application form, available on the Glendale Permit Applications page
  • OptionalOwner Builder AddendumRequired for owner-builder applicants who are building for their own use and not using a licensed contractor
  • OptionalResidential Standard Plan Submittal Checklist (2019)Checklist of required plan submittal elements for standard residential projects; available on the Glendale Residential PDF forms page

Fee schedule

Fee typeAmountNotes
Building permit — valuation-based (Table 3A)$1 to $500: $29.79; $501 to $2,000: $29.79 for first $500 plus $3.85 per additional $100 (or fraction); $2,001 to $25,000: $86.64 for first $2,000 plus $17.74 per additional $1,000; $25,001 to $50,000: $494.66 for first $25,000 plus $12.78 per additional $1,000; $50,001 to $100,000: $814.16 for first $50,000 plus $8.86 per additional $1,000; $100,001 to $500,000: $1,257.16 for first $100,000 plus $7.07 per additional $1,000; $500,001 to $1,000,000: $4,085.16 for first $500,000 plus $6.01 per additional $1,000; $1,000,001 and up: $7,090.16 for first $1,000,000 plus $4.62 per additional $1,000City of Glendale Community Development Fee Schedule, Table 3A Building Permit Fees, effective May 10, 2019. Valuation is the total estimated cost including materials, labor, overhead, and profit; determined by the Building Official based on nationally recognized standards (ICC Building Valuation Data, August 2018 edition cited in the fee schedule). This fee schedule is posted as the current schedule on the Building Permits Fee Schedule page as of June 29, 2026.
Plan review — Building (custom home or addition)75% of the building permit fee (minimum $122.88)City of Glendale Fee Schedule, Residential Fees — Custom Home, Remodel, Room Addition Plans: Building Plan Review, effective May 10, 2019. Plan review fees are due when the permit application is submitted.
Plan review — standard production home75% of the building permit fee (minimum $122.88) for base plan; additional $61.44 per additional elevation or building footprint changeCity of Glendale Fee Schedule, Residential Fees — Standard Plans: Base Plan plus variations, effective May 10, 2019.
Expedited plan review300% of the normal plan review fee; requires approval of the Building Safety OfficialCity of Glendale Plan Review Target Turnaround Times (effective January 29, 2018; revised 2020). Expedited review time is 50% of the standard review time.

Residential Addition / Remodel Permit

Verified

Required for additions, remodels, room additions, patio enclosures, carport-to-garage conversions, patio covers, and detached structure additions on single-family residential properties in Glendale. The applicant submits a completed Permit/Plan Review Application (Residential 2026) with construction documents to the Development Services Center. Glendale publishes ready-to-use permit packets for common addition types (Patio Enclosure, Residential Addition / Room Addition, Carport to Garage Enclosure, Detached Structure Addition, Patio Cover Addition) on the Permit Packets page. Permit fees are valuation-based per Table 3A.

Verified 2026-06-29 · Source

Requirements

  • Submit a completed Permit/Plan Review Application (Residential 2026) with two sets of construction documents
  • For common addition types, Glendale's Permit Packets (patio enclosure, room addition, carport-to-garage, patio cover, detached structure) provide pre-approved plan sets
  • Plans must comply with the 2024 International Residential Code and all codes adopted by Ordinance O25-51
  • Licensed Arizona ROC contractor required unless owner-builder exemption applies (ARS 32-1121)

Required documents

  • RequiredPermit/Plan Review Application — Residential (2026)Current residential permit application; required for all residential addition and remodel projects
  • OptionalPermit Packet — Patio Enclosure (2024)Pre-made plan packet for patio enclosures; published by Glendale Development Services (816KB PDF)
  • OptionalPermit Packet — Residential Addition / Room Addition (2024)Pre-made plan packet for room additions (2MB PDF)
  • OptionalPermit Packet — Carport to Garage Enclosure (2019)Pre-made plan packet for carport-to-garage conversion (195KB PDF)
  • OptionalPermit Packet — Patio Cover Addition (2019)Pre-made plan packet for patio cover additions (347KB PDF)
  • OptionalPermit Packet — Detached Structure Addition (2019)Pre-made plan packet for detached structure additions (345KB PDF)

Fee schedule

Fee typeAmountNotes
Building permit — valuation-based (Table 3A)$1 to $500: $29.79; $501 to $2,000: $29.79 for first $500 plus $3.85 per additional $100; $2,001 to $25,000: $86.64 for first $2,000 plus $17.74 per additional $1,000; $25,001 to $50,000: $494.66 for first $25,000 plus $12.78 per additional $1,000; $50,001 to $100,000: $814.16 for first $50,000 plus $8.86 per additional $1,000City of Glendale Fee Schedule, Table 3A (effective May 10, 2019). Valuation includes all materials, labor, overhead, and profit.
Plan review — Building (custom / room addition)75% of the building permit fee (minimum $122.88)City of Glendale Fee Schedule, Residential Fees — Custom Home, Remodel, Room Addition Plans (effective May 10, 2019).

Electrical Permit

Verified

Electrical work in Glendale is governed by the 2023 National Electrical Code (NEC) as adopted by Ordinance O25-51, effective January 9, 2026. Residential electrical permits are applied for using the Permit/Plan Review Application (Residential 2026). Glendale charges electrical permit fees on a per-item basis (base fee plus individual counts of circuits, fixtures, outlets, appliances, and sub-panels) rather than a valuation-based Table 3A fee. An electrical clearance inspection fee applies when required by the utility company to energize service.

Verified 2026-06-29 · Source

Requirements

  • Electrical work must comply with the 2023 NEC as adopted by Ordinance O25-51 (effective January 9, 2026)
  • Submit a completed Permit/Plan Review Application (Residential 2026)
  • Ground-fault protection performance tests are required for equipment per Glendale's IBC Section 110.3.11.1 amendment
  • Licensed Arizona ROC electrical contractor required unless owner-builder exemption applies

Required documents

  • RequiredPermit/Plan Review Application — Residential (2026)Current residential permit application; used for electrical permits

Fee schedule

Fee typeAmountNotes
Electrical permit — base fee$29.79 base feeCity of Glendale Fee Schedule, Residential Fees — Electrical Permit: Base Permit Fee (effective May 10, 2019).
Electrical service (200A or less)$38.64City of Glendale Fee Schedule — Electrical Service 200A or less (effective May 10, 2019).
Electrical service (over 200A)$78.75City of Glendale Fee Schedule — Electrical Service over 200A (effective May 10, 2019).
Electrical clearance (inspection not included)$114.35 per requestCity of Glendale Fee Schedule — Electrical Clearance, when required by utility company to energize service (effective May 10, 2019).
Temporary power meter installation$152.10City of Glendale Fee Schedule — Temporary Power Meter Installation (effective May 10, 2019).
Sub-panels$38.64 eachCity of Glendale Fee Schedule — Sub panels (effective May 10, 2019).
Appliances (1 HP or less — dishwasher, range, water heater, dryer, etc.)$6.00 eachCity of Glendale Fee Schedule — Appliances 1 HP or less (effective May 10, 2019).
Receptacles/switches/outlets — first 20 fixtures$1.36 eachCity of Glendale Fee Schedule — Receptacles/Switches/Outlets, first 20 fixtures (effective May 10, 2019).
Receptacles/switches/outlets — additional fixtures beyond 20$0.89 eachCity of Glendale Fee Schedule — Receptacles/Switches/Outlets, additional fixtures (effective May 10, 2019).
Livable floor area (electrical)$0.06 per square footCity of Glendale Fee Schedule — Livable Floor Area charge (effective May 10, 2019).
Plan review — Electrical75% of the electrical permit fee (minimum $122.88)City of Glendale Fee Schedule, Residential Fees — Electrical Plan Review (effective May 10, 2019).

Plumbing Permit

Verified

Plumbing work in Glendale is governed by the 2024 International Plumbing Code (IPC, with Appendices C and E) as adopted by Ordinance O25-51, effective January 9, 2026. Residential plumbing permits are applied for using the Permit/Plan Review Application (Residential 2026). Glendale charges plumbing permit fees on a per-item basis (base fee plus individual fixture, sewer, water piping, and drainage counts).

Verified 2026-06-29 · Source

Requirements

  • Plumbing work must comply with the 2024 IPC (Appendices C and E) as adopted by Ordinance O25-51 (effective January 9, 2026)
  • Submit a completed Permit/Plan Review Application (Residential 2026)
  • Licensed Arizona ROC plumbing contractor required unless owner-builder exemption applies

Required documents

  • RequiredPermit/Plan Review Application — Residential (2026)Current residential permit application; used for plumbing permits

Fee schedule

Fee typeAmountNotes
Plumbing permit — base fee$29.79 base feeCity of Glendale Fee Schedule, Residential Fees — Plumbing Permit: Base Permit Fee (effective May 10, 2019).
Fixtures$11.78 eachCity of Glendale Fee Schedule — Plumbing Fixtures (effective May 10, 2019).
Sewer$31.23City of Glendale Fee Schedule — Plumbing Sewer (effective May 10, 2019).
Water piping and drainage piping$6.00 per 100 linear feet (100 ft minimum)City of Glendale Fee Schedule — Water Piping and Drainage Piping (effective May 10, 2019).
Water heater$15.58 eachCity of Glendale Fee Schedule — Plumbing Permit: Water Heater (effective May 10, 2019). A water heater replacement requires a separate plumbing permit.
Gas piping (5 outlets or fewer)$7.78City of Glendale Fee Schedule — Gas Piping 5 outlets or less (effective May 10, 2019).
Gas piping (each additional outlet beyond 5)$1.36 eachCity of Glendale Fee Schedule — Gas Piping each additional outlet (effective May 10, 2019).
Gas clearance (when required by utility to establish service)$114.35 per requestCity of Glendale Fee Schedule — Gas Clearance (effective May 10, 2019). Inspection not included with the plumbing permit.
Plan review — Plumbing75% of the plumbing permit fee (minimum $122.88)City of Glendale Fee Schedule, Residential Fees — Plumbing Plan Review (effective May 10, 2019).

Mechanical / HVAC Permit

Verified

Mechanical and HVAC work in Glendale is governed by the 2024 International Mechanical Code (IMC) and 2024 International Fuel Gas Code (IFGC, with Appendices A and B) as adopted by Ordinance O25-51, effective January 9, 2026. Residential mechanical permits are applied for using the Permit/Plan Review Application (Residential 2026). Glendale charges mechanical permit fees on a per-item basis (base fee plus counts of air handlers, furnaces, evaporative coolers, vents, etc.).

Verified 2026-06-29 · Source

Requirements

  • Mechanical and HVAC work must comply with the 2024 IMC and 2024 IFGC (Appendices A and B) as adopted by Ordinance O25-51 (effective January 9, 2026)
  • Submit a completed Permit/Plan Review Application (Residential 2026)
  • Licensed Arizona ROC mechanical contractor required unless owner-builder exemption applies

Required documents

  • RequiredPermit/Plan Review Application — Residential (2026)Current residential permit application; used for mechanical/HVAC permits

Fee schedule

Fee typeAmountNotes
Mechanical permit — base fee$29.79 base feeCity of Glendale Fee Schedule, Residential Fees — Mechanical Permit: Base Permit Fee (effective May 10, 2019).
Air handlers$13.48 eachCity of Glendale Fee Schedule — Mechanical Permit: Air Handlers (effective May 10, 2019).
Evaporative coolers$13.48 eachCity of Glendale Fee Schedule — Mechanical Permit: Evaporative Coolers (effective May 10, 2019).
Furnaces (100K BTU or less)$18.76 eachCity of Glendale Fee Schedule — Mechanical Permit: Furnaces 100K BTU or less (effective May 10, 2019).
Furnaces (over 100K BTU)$23.04 eachCity of Glendale Fee Schedule — Mechanical Permit: Furnaces over 100K BTU (effective May 10, 2019).
All-in-one HVAC (package unit)$13.48 eachCity of Glendale Fee Schedule — Mechanical Permit: All-in-one HVAC (effective May 10, 2019).
Vent fans and appliance vents$9.19 eachCity of Glendale Fee Schedule — Mechanical Permit: Vent Fans and Appliance Vents (effective May 10, 2019).
Repairs/additions to existing equipment$17.35City of Glendale Fee Schedule — Mechanical Permit: Repairs/additions to existing equipment (effective May 10, 2019).
Plan review — Mechanical75% of the mechanical permit fee (minimum $122.88)City of Glendale Fee Schedule, Residential Fees — Mechanical Plan Review (effective May 10, 2019).

Residential Solar Photovoltaic (PV) Permit

Verified

A building permit is required for residential rooftop photovoltaic systems in Glendale. Photovoltaic work must comply with Glendale's currently adopted codes — the 2024 IRC and 2023 NEC (Ordinance O25-51, effective January 9, 2026). The applicant submits two complete sets of plans to the Development Services Center, including a site plan showing all buildings and the PV unit location, a three-line diagram, electrical one-line diagram, roof plan, cut sheets for all equipment, and specifications. The permit fee is valuation-based (Table 3A) calculated on the system's value including installation (before rebates).

Verified 2026-06-29 · Source

Requirements

  • Submit two complete sets of plans including: site plan, three-line diagram, electrical one-line diagram, roof plan showing new/existing equipment, cut sheets from a nationally recognized testing agency (e.g. UL)
  • Provide construction valuation (system value including installation, before rebates) on the permit application
  • An Arizona ROC-licensed contractor is required ('Qualified Personnel' as defined by the NEC); the 2023 NEC requires qualified personnel to install solar equipment and all wiring and interconnections
  • Specify applicable codes on plans (2024 IRC, 2023 NEC per the current Ordinance O25-51, effective January 9, 2026)
  • Note on plans: photovoltaic system shall be installed per NEC Article 690 with all required warnings, signage, and plaques
  • Rapid shutdown is required per NEC 690.56(c)(1)
  • Provide required module setbacks on roof (2024 IRC R324); see IRC R324.6.2 for ridge setbacks based on roof area covered
  • Check with your utility provider for additional requirements and for a list of approved licensed contractors
  • Contact the Planning Department at 623-930-2800 for any setback, height, color/reflectivity, or zoning requirements for ground-mounted systems

Required documents

  • RequiredPermit/Plan Review Application — Residential (2026)Current residential permit application used for solar PV permits
  • RequiredSite plan, three-line diagram, electrical one-line diagram, roof plan, and equipment cut sheetsTwo complete sets of plans required for submittal; see Glendale's Residential Photovoltaic System Requirements document for the full checklist
  • OptionalResidential Photovoltaic System Requirements (2019)Glendale's checklist and requirements for residential PV permits; available on the Residential PDF forms page (references prior codes; verify current code editions against Ordinance O25-51)

Fee schedule

Fee typeAmountNotes
Solar PV permit — valuation-based (Table 3A)Based on the construction valuation of the system including installation (before rebates); per Table 3A (e.g. $501 to $2,000: $29.79 for first $500 plus $3.85 per additional $100; $2,001 to $25,000: $86.64 for first $2,000 plus $17.74 per additional $1,000)City of Glendale Fee Schedule, Table 3A (effective May 10, 2019). Glendale's PV Requirements document states the permit fee is based on Table 3A using the system's value including installation (before rebates).
Plan review — Electrical (PV system)75% of the electrical permit fee (minimum $122.88)City of Glendale Fee Schedule, Residential Fees — Electrical Plan Review (effective May 10, 2019).
Electrical clearance (if required by utility)$114.35 per requestCity of Glendale Fee Schedule — Electrical Clearance (effective May 10, 2019). Utility company may require a clearance inspection to energize the interconnection.

Fence / Wall Permit

Verified

A building permit is required for fences and walls in Glendale, except fences other than swimming pool barriers and perimeter subdivision fences that are 7 feet (2134 mm) or less in height, which are exempt from permit requirements per Glendale's amended IBC Section 105.2. For fences/walls requiring a permit (over 7 feet, retaining walls of any height, and swimming pool barriers), the applicant submits a completed permit application. Fence and wall permit fees are charged per square foot of wall face area rather than on valuation.

Verified 2026-06-29 · Source

Requirements

  • Fences other than swimming pool barriers and perimeter subdivision fences that do not exceed 7 feet (2134 mm) in height are exempt from a permit per Glendale's IBC Section 105.2 amendment (Ordinance O25-51)
  • Swimming pool barriers require a permit regardless of height; see pool permit requirements
  • Perimeter subdivision fences require a permit per Glendale's code
  • Retaining walls of any height require a permit
  • Fences or walls exceeding 7 feet require a structural plan review
  • Submit a completed Permit/Plan Review Application

Required documents

  • RequiredPermit/Plan Review Application — Residential (2026)Current residential permit application used for fence/wall permits

Fee schedule

Fee typeAmountNotes
Fence/wall — perimeter residential subdivision wall$0.12 per square foot of wall face areaCity of Glendale Fee Schedule, Sign/Fence Fees — Perimeter residential subdivision walls (effective May 10, 2019).
Fence/wall — fence walls over 6 feet in height$0.12 per square foot of wall face areaCity of Glendale Fee Schedule, Sign/Fence Fees — Fence walls over 6 ft in height (effective May 10, 2019).
Retaining walls of any height$0.19 per square footCity of Glendale Fee Schedule, Sign/Fence Fees — Retaining walls of any height (effective May 10, 2019).
Structural plan review (fences/walls requiring engineering)$122.88 per hour (minimum $61.44 for 1/2 hour)City of Glendale Fee Schedule, Sign/Fence Fees — Structural Plan Review (effective May 10, 2019).

Accessory Dwelling Unit (ADU) Permit

Verified

An Accessory Dwelling Unit (ADU) is a secondary living unit on the same lot as a single-family detached dwelling, with a kitchenette or kitchen, bathroom, and sleeping area. Glendale permits one attached ADU and one detached ADU per single-family lot (or up to two detached ADUs on lots one acre or more if one is deed-restricted as affordable housing). ADUs must not exceed 1,000 square feet. A Zoning Clearance Letter from the Planning Division is required before submitting construction documents. All ADUs must have separate utility meters (including a separate city water meter from the main dwelling).

Verified 2026-06-29 · Source

Requirements

  • A Zoning Clearance Letter (reviewed and approved by the Planning Division) is required before submitting construction documents or permit applications; contact Planning at 623-930-2800
  • ADU must not exceed 1,000 square feet
  • All ADUs must have separate utility meters, including a separate city water meter (requires a new water tap to the city main; work in the right-of-way requires additional permits and a specially licensed contractor)
  • No more than one attached ADU and one detached ADU per lot; on lots one acre or more, up to two detached ADUs if one is recorded as a restricted-affordable unit
  • ADU setbacks: rear and side setbacks of no less than 5 feet; front setback per zoning district requirements
  • ADU shall not be sold or conveyed separately from the primary dwelling
  • ADU shall not have a separate street address; it shares the primary dwelling's address with a Unit 1 or Unit 2 suffix
  • A detached ADU pays Single Family (one unit per structure) Building, Water & Sewer impact fees; an attached ADU pays Multifamily (2+ units per structure) impact fees
  • ADUs may not be constructed before the primary single-family dwelling unit

Required documents

  • RequiredAccessory Dwelling Unit Requirements and Updates (revised 9/8/2025)Glendale's official ADU requirements document including UDC Section 35.3.204, fee estimates, and significant UDC changes (Dec 2023 and Dec 2024). Sign and submit prior to Zoning Clearance Letter application. Available on the Residential PDF forms page.
  • RequiredPermit/Plan Review Application — Residential (2026)Current residential permit application used for ADU construction permits

Fee schedule

Fee typeAmountNotes
Zoning Clearance Letter (Planning Division)Contact Planning Division at 623-930-2800 for current fee; rough estimate table in the ADU document lists $144.00ADU Requirements document (revised 9/8/2025) rough fee estimate table shows Zoning Clearance Letter (ZCL) at $144.00. This is a rough estimate; confirm current fee with the Planning Division.
Building Safety Plan Review (per ADU rough estimate)Approximately $1,052.90 for a 1,000 sq ft detached or attached ADU (rough estimate only)ADU Requirements document (revised 9/8/2025) rough fee estimate table. This is an estimate; actual fee is based on Table 3A valuation.
Building permit — valuation-based (Table 3A)Based on construction valuation per Table 3A (e.g. for a $100,000–$500,000 ADU: $1,257.16 for first $100,000 plus $7.07 per additional $1,000)City of Glendale Fee Schedule, Table 3A (effective May 10, 2019). Actual ADU permit fee based on the construction valuation determined by the Building Official.
Water & Sewer impact fees (detached ADU)Single Family (one unit per structure) Building, Water & Sewer impact fees; see current Impact Fee ScheduleADU Requirements document (revised 9/8/2025). Impact Fee Schedule is published separately (see Impact Fee Schedule PDF, revised 6/3/2026).

Demolition Permit

Verified

A demolition permit is required for the demolition of structures in Glendale. The fee is a flat rate per structure for residential demolition, and a higher flat rate for commercial demolition. The applicant submits a completed permit application to the Development Services Center.

Verified 2026-06-29 · Source

Requirements

  • Submit a completed Permit/Plan Review Application for the demolition project
  • Utility disconnects may be required before demolition
  • Contact the Development Services Center at 623-930-2800 for any specific requirements

Required documents

  • RequiredPermit/Plan Review Application — Residential (2026) or Commercial Application (2026)Current permit application; used for demolition permits

Fee schedule

Fee typeAmountNotes
Residential demolition permit$59.01 per structureCity of Glendale Fee Schedule, Residential Fees — Demolition Permit: Per structure (effective May 10, 2019).
Commercial demolition permit$126.73 per structureCity of Glendale Fee Schedule, Commercial Fees — Demolition Permit (effective May 10, 2019).

Commercial / Multifamily Building Permit

Verified

A commercial building permit is required for new commercial construction, commercial remodels and tenant improvements, and multifamily residential projects. Plans are submitted to the Development Services Center and may be submitted electronically via Glendale's electronic plan submittal system. The permit fee is valuation-based per Table 3A; a minimum commercial permit fee of $114.35 applies. A Certificate of Occupancy is issued upon successful final inspection.

Verified 2026-06-29 · Source

Requirements

  • Submit a completed Permit/Plan Review Application — Commercial / Multi-Family Residential (2026)
  • Plans must comply with the 2024 IBC and all codes adopted by Ordinance O25-51 (effective January 9, 2026)
  • Electronic plan submittal is available via the Submit Electronic Plans page
  • Minimum commercial permit fee of $114.35 applies

Required documents

  • RequiredPermit/Plan Review Application — Commercial / Multi-Family Residential (2026)Current commercial permit application (1MB PDF), available on the Glendale Permit Applications page

Fee schedule

Fee typeAmountNotes
Building permit — valuation-based (Table 3A), minimum $114.35$1 to $500: $29.79 (minimum $114.35 for commercial); $2,001 to $25,000: $86.64 for first $2,000 plus $17.74 per additional $1,000; $25,001 to $50,000: $494.66 for first $25,000 plus $12.78 per additional $1,000; $50,001 to $100,000: $814.16 for first $50,000 plus $8.86 per additional $1,000; $100,001 to $500,000: $1,257.16 for first $100,000 plus $7.07 per additional $1,000City of Glendale Fee Schedule, Table 3A, with minimum commercial fee of $114.35 (effective May 10, 2019).
Plan review — Building (commercial)75% of the building permit fee (minimum $122.88)City of Glendale Fee Schedule, Commercial Fees — Building Plan Review (effective May 10, 2019).
Temporary Certificate of Occupancy (TCO)$531.22 for up to 30 days; first 30-day extension: $1,062.46; second 30-day extension: $2,124.94City of Glendale Fee Schedule — Certificate of Occupancy: First TCO valid up to 30 days (effective May 10, 2019). No project shall exceed 90 days under a TCO; third or subsequent extensions double the prior fee.
Certificate of Occupancy (standard)Included in original permit feeCity of Glendale Fee Schedule — Certificate of Occupancy (effective May 10, 2019).
Change of Occupancy or Use$122.88 per hour (2-hour minimum) plan review + $114.35 per hour (2-hour minimum) inspectionCity of Glendale Fee Schedule — Change of Occupancy or Use (effective May 10, 2019).

Sources & verification

Verified against official sources. Last reviewed 2026-06-29.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Glendale building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-07-17) →View current record →All versions →

Permalink: /arizona/maricopa-county/glendale/as-of/2026-06-29/

Snapshot date: 2026-06-29

Commit: 9e5cbba