Peoria building permits

Verified

Peoria, Arizona — as published 2026-07-16.

Verified 2026-07-16 · Source

Codes adopted

2018 International Building Code (IBC), with City of Peoria amendments — adopted per Ordinance 2019-122018 International Residential Code (IRC), with City of Peoria amendments — adopted per Ordinance 2019-122018 International Plumbing Code (IPC), with City of Peoria amendments — adopted per Ordinance 2019-122018 International Fuel Gas Code (IFGC), with City of Peoria amendments — adopted per Ordinance 2019-122018 International Mechanical Code (IMC), with City of Peoria amendments — adopted per Ordinance 2019-122018 International Energy Conservation Code (IECC), with City of Peoria amendments — adopted per Ordinance 2019-122018 International Property Maintenance Code (IPMC), with City of Peoria amendments — adopted per Ordinance 2019-122018 International Fire Code (IFC), with City of Peoria amendments — adopted per Ordinance 2019-122017 National Electrical Code (NEC), with City of Peoria amendments — adopted per Ordinance 2019-122010 Americans with Disabilities Act Accessible Guidelines (ADAAG) — referenced for applicable projects2010 NFPA 13D — residential fire sprinkler systems (referenced in custom home requirements)

Permit types & fees

Residential Building Permit (New Custom Home)

Verified

Required for the construction of a new custom single-family residential home in Peoria. Plans are submitted online at the Peoria Development Services portal (devservices.peoriaaz.gov) along with a completed 400NR – New Custom Home Application. Submittals must include one complete set of 24" x 36" plans, site plan, lot grading plan, soils report, structural calculations, and truss calculations (if not Arizona registrant-designed). The City uses a 4-day work week (Mon–Thu) and all plan review timelines are in business days. A separate Fire Department review is also required for fire sprinkler systems.

Verified 2026-07-16 · Source

Requirements

  • Submit one (1) complete set of legible, scaled building plans (24" x 36" at 1/4" = 1' minimum) via the online portal at devservices.peoriaaz.gov with a completed 400NR application
  • Plans must include: site/plot plan (1" = 20' scale), lot grading plan, foundation plan, floor plan (with dimensions, labeled rooms, windows and doors), structural calculations, truss calculations (if not Arizona registrant-designed), framing plans, elevations, and electrical floor plan
  • Site plan must show all property line dimensions, easements, setbacks, structure footprints, north arrow, driveway and utility locations, and point of reference for GIS grid
  • Work must comply with all adopted codes per Ordinance 2019-12: 2018 IBC, IRC, IFGC, IMC, IECC, IPMC, 2017 NEC, 2018 IPC, ADAAG, NFPA 13D, 2018 IFC, and current Peoria Zoning Ordinances
  • Design must be for a wind speed of 115 mph, Exposure C, Seismic Design Category B — include this design schedule on plans
  • If a contractor is used: valid City of Peoria Business License, Arizona State License, and Arizona Registrar of Contractors (AZROC) license number required at permit issuance; Owner/Builder Affidavit accepted for owner-built projects

Required documents

  • Required400NR – New Custom Home ApplicationPermit application for new custom residential homes; completed and submitted online via the Development Services portal at devservices.peoriaaz.gov
  • Optional253 – Custom Home Plan Submittal Guide (Handout 253)Comprehensive guide detailing all plan submittal requirements for new custom homes in Peoria, including site plan, grading, foundation, structural, mechanical, plumbing, electrical, and energy requirements. Available from the City of Peoria plan review page.
  • Optional208 – Residential Inspection Checklist (Handout 208)Inspection-by-inspection checklist covering all stages from foundation through final, including underground plumbing, stem walls, pre-slab, roof deck, exterior strap and shear, rough trades, and final; available from the City of Peoria Building Development

Fee schedule

Fee typeAmountNotes
Building permit — valuation-based$0 value/minimum: $87; $1–$500: $87; $501–$2,000: $87 for first $500 + $3.05 per each additional $100 or fraction; $2,001–$25,000: $120.25 for first $2,000 + $14 per additional $1,000 or fraction; $25,001–$50,000: $443.25 for first $25,000 + $10.10 per additional $1,000 or fraction; $50,001–$100,000: $695.25 for first $50,000 + $7 per additional $1,000 or fraction; $100,001–$500,000: $1,045.25 for first $100,000 + $5.60 per additional $1,000 or fraction; $500,001–$1,000,000: $3,285.25 for first $500,000 + $4.75 per additional $1,000 or fraction; $1,000,001 and up: $5,660.25 for first $1,000,000 + $3.65 per additional $1,000 or fractionPeoria Development Fee Schedule, Rev. 9/2025. Valuation is based on the Peoria Building Valuation Table: single-family dwellings (V-B, 'Other' column) = $47.50/sq ft; private garage = $19.50/sq ft; open carport = $13/sq ft; covered patio/deck = $13/sq ft.
Plan check fee65% of the building permit feePeoria Development Fee Schedule, Rev. 9/2025. Plan check fee applies in addition to the permit fee.
Plot plan review$87 per permit (standard residential plot plan review)Peoria Development Fee Schedule, Rev. 9/2025 — 'Review of Standard Home Plot Plan: $87'. Applies where a plot plan review is required.
Re-inspection fee$230 per re-inspectionPeoria Development Fee Schedule, Rev. 9/2025 — 'Reinspection Fee: $230'.

Residential Addition / Remodel Permit

Verified

A building permit is required for any addition, structural modification, or remodel of an existing single-family home in Peoria. Common additions include room additions, patio enclosures, detached/attached structures (casitas, garages, sheds), and structural alterations. Plans are submitted online at devservices.peoriaaz.gov with a completed 400M – Miscellaneous Building Permit Application. Over-the-counter plan review may be available for miscellaneous residential permits by appointment (contact Building Development). Plan review timelines for additions and alterations are 5 business days (1st submittal).

Verified 2026-07-16 · Source

Requirements

  • Submit online at devservices.peoriaaz.gov with a completed 400M – Miscellaneous Building Permit Application and one (1) set of plans drawn to scale (1/4" = 1' for floor plans)
  • Site plan must include property boundaries, all setbacks, north arrow, location of existing and proposed structures, and easements
  • Work must comply with adopted codes per Ordinance 2019-12: 2018 IBC, IRC, IPC, IFGC, IMC, IECC, IPMC, IFC, 2017 NEC, and current Peoria Zoning Ordinances
  • Contractor information (name, Peoria Business License, AZROC number) required at permit issuance, or Owner/Builder Affidavit for owner-built projects

Required documents

  • Required400M – Miscellaneous Building Permit ApplicationGeneral residential permit application used for additions, remodels, and miscellaneous work; submitted online at devservices.peoriaaz.gov
  • Optional508 – Attached/Detached Structure Standards (Handout 508, Rev. 04/23)Requirements for casitas, garages, sheds, and other attached or detached structures, including code requirements for electrical, lighting, HVAC, room sizes, ceiling heights, attic access, sleeping room egress, and inspection stages
  • Optional507 – Patio Enclosure Standards (Handout 507)Requirements for enclosing an existing patio cover

Fee schedule

Fee typeAmountNotes
Building permit — valuation-basedSame tiered valuation-based fee as new construction: $87 minimum; $501–$2,000: $87 for first $500 + $3.05/each additional $100; $2,001–$25,000: $120.25 for first $2,000 + $14/each additional $1,000; $25,001–$50,000: $443.25 for first $25,000 + $10.10/each additional $1,000; and so on per the Development Fee Schedule tiered tablePeoria Development Fee Schedule, Rev. 9/2025. Patio cover/carport valuation = $13/sq ft (same column as decks).
Plan check fee65% of the building permit feePeoria Development Fee Schedule, Rev. 9/2025.
Re-inspection fee$230 per re-inspectionPeoria Development Fee Schedule, Rev. 9/2025.

Commercial / Multifamily Building Permit

Verified

Required for new commercial construction, tenant improvements, commercial shells, and multi-family residential projects in Peoria. Commercial plan review must be completed before permits are issued. The plan review process ensures compliance with adopted codes. Plans and permit applications are submitted online at devservices.peoriaaz.gov using the appropriate commercial application (400NC for new commercial, 400TI for tenant improvements, 400CofO for Certificate of Occupancy only). Commercial plan review timelines are 18 business days for new commercial (1st submittal), 12–16 days for shells, and 12 days for tenant improvements.

Verified 2026-07-16 · Source

Requirements

  • Submit online at devservices.peoriaaz.gov with appropriate application: 400NC (new commercial), 400TI (tenant improvement), 400CofO (CofO only), or 400M (miscellaneous commercial)
  • Submit one set of plans with completed 201 – Commercial Plan Submittal Guidelines and Checklist
  • All plans must comply with 2018 IBC, IMC, IFGC, IPC, IECC, IFC, 2017 NEC, ADAAG, and current Peoria Zoning Ordinances
  • Contractor information required at permit issuance: name, Peoria Business License number, Arizona State License, and AZROC number

Required documents

  • Required400NC – New Commercial ApplicationPermit application for new commercial construction
  • Required400TI – Tenant Improvement ApplicationPermit application for commercial tenant improvements
  • Required201 – Commercial Plan Submittal Guidelines and Checklist (Handout 201)Comprehensive checklist and guidelines for commercial plan preparation and submittal
  • Optional400CofO – Certificate of Occupancy Only ApplicationApplication for Certificate of Occupancy without associated construction work

Fee schedule

Fee typeAmountNotes
Building permit — valuation-basedTiered valuation-based fee from Development Fee Schedule, Section VI. Examples from the valuation table: tenant improvement (major) = 40% of original building area valuation; tenant improvement (minor) = 20% of original building area valuation. Commercial/office buildings (V-B, 'Other' column): $58/sq ft. Restaurants: $77/sq ft. Retail/stores: $45/sq ft. Warehouses: $25.50/sq ft.Peoria Development Fee Schedule, Rev. 9/2025. 'Building Shell Only' is 80% of full valuation. Tenant Improvement major = 40% of original building area value; minor = 20%.
Plan check fee65% of the building permit feePeoria Development Fee Schedule, Rev. 9/2025.
Final Certificate of Occupancy$173Peoria Development Fee Schedule, Rev. 9/2025 — 'Final Certificate of Occupancy (C of O): $173'.
Tenant Improvement — C of O only building permit$259Peoria Development Fee Schedule, Rev. 9/2025.
60-day Temporary, Conditional & Partial C of O$1,150Peoria Development Fee Schedule, Rev. 9/2025.
Expedited plan check / inspections (minimum $1,000)200% of calculated fee (minimum $1,000)Peoria Development Fee Schedule, Rev. 9/2025 — 'Expedited Plan Check/Inspections (min $1,000): 200% of calculated fee'.

Electrical Permit

Verified

Electrical work in Peoria is governed by the 2017 National Electrical Code (NEC) as adopted with City amendments per Ordinance 2019-12. Residential electrical work for miscellaneous scopes (service upgrades, new circuits, subpanel additions, de-rates for solar, etc.) is permitted via the 400M – Miscellaneous Building Permit Application submitted online at devservices.peoriaaz.gov. Over-the-counter plan review may be available for miscellaneous commercial electrical permits for systems not exceeding 225-amp 120/208-volt, 3-phase service.

Verified 2026-07-16 · Source

Requirements

  • Electrical work must comply with the 2017 NEC as adopted and amended per Ordinance 2019-12
  • Submit online at devservices.peoriaaz.gov with a 400M – Miscellaneous Building Permit Application for standalone electrical scopes; electrical work within a larger building permit uses that project's application
  • For solar installations requiring a separate panel upgrade or de-rate: a separate 400M application is required with manufacturer specifications, electrical load calculations, and panel schedule
  • Contractor information (name, Peoria Business License, AZROC number) required at permit issuance

Required documents

  • Required400M – Miscellaneous Building Permit ApplicationUsed for standalone electrical scopes including service upgrades, subpanels, de-rates, and minor electrical work

Fee schedule

Fee typeAmountNotes
Electrical permit — valuation-basedValuation-based permit fee per Development Fee Schedule. Minimum fee $87. Valuation is based on the scope of work; there is no separate flat-fee electrical table published by Peoria.Peoria Development Fee Schedule, Rev. 9/2025. Plan check fee is an additional 65% of the permit fee.
Re-inspection fee$230 per re-inspectionPeoria Development Fee Schedule, Rev. 9/2025.

Plumbing Permit (incl. Water Heater)

Verified

Plumbing work in Peoria is governed by the 2018 International Plumbing Code (IPC) as adopted with City amendments per Ordinance 2019-12. Residential plumbing work for miscellaneous scopes (water heater replacement, fixture additions, etc.) is permitted via the 400M – Miscellaneous Building Permit Application submitted online at devservices.peoriaaz.gov. Permit fees are valuation-based under the Development Fee Schedule.

Verified 2026-07-16 · Source

Requirements

  • Plumbing work must comply with the 2018 IPC as adopted with City amendments per Ordinance 2019-12
  • Submit online at devservices.peoriaaz.gov with a 400M – Miscellaneous Building Permit Application for standalone plumbing scopes
  • Underground plumbing must pass a pressure test (soils lines at 5-foot head pressure; water service at operating pressure or 50 psi minimum for 15 minutes) before backfill
  • Proper material, fittings, slope, cleanouts, and trap arm lengths per 2018 IPC; copper and plastic piping must be sleeved at all IBF cross-overs

Required documents

  • Required400M – Miscellaneous Building Permit ApplicationUsed for standalone plumbing scopes including water heater replacement, fixture additions, and other miscellaneous plumbing work

Fee schedule

Fee typeAmountNotes
Plumbing / water heater permit — valuation-basedMinimum fee $87. Valuation-based permit fee per Development Fee Schedule. There is no separate flat-fee plumbing schedule; valuation is based on the scope of work.Peoria Development Fee Schedule, Rev. 9/2025. Plan check fee is an additional 65% of the permit fee.
Re-inspection fee$230 per re-inspectionPeoria Development Fee Schedule, Rev. 9/2025.

Mechanical / HVAC Permit

Verified

Mechanical and HVAC work in Peoria is governed by the 2018 International Mechanical Code (IMC) and 2018 International Fuel Gas Code (IFGC) as adopted with City amendments per Ordinance 2019-12. Residential HVAC change-outs, new equipment, and related mechanical scopes are permitted via the 400M – Miscellaneous Building Permit Application submitted online at devservices.peoriaaz.gov. Permit fees are valuation-based.

Verified 2026-07-16 · Source

Requirements

  • Mechanical/HVAC work must comply with the 2018 IMC and 2018 IFGC as adopted with City amendments per Ordinance 2019-12
  • Submit online at devservices.peoriaaz.gov with a 400M – Miscellaneous Building Permit Application
  • Heating and cooling systems must be capable of maintaining room temperatures between 70°F and 90°F at 3 feet above floor and 2 feet from exterior walls (per Peoria attached/detached structure standards)
  • Contractor information (name, Peoria Business License, AZROC number) required at permit issuance

Required documents

  • Required400M – Miscellaneous Building Permit ApplicationUsed for standalone HVAC/mechanical scopes including equipment change-outs and ductwork modifications

Fee schedule

Fee typeAmountNotes
Mechanical / HVAC permit — valuation-basedMinimum fee $87. Valuation-based permit fee per Development Fee Schedule. There is no separate flat-fee mechanical schedule; valuation is based on the scope of work.Peoria Development Fee Schedule, Rev. 9/2025. Plan check fee is an additional 65% of the permit fee.
Re-inspection fee$230 per re-inspectionPeoria Development Fee Schedule, Rev. 9/2025.

Residential Solar Photovoltaic (PV) Permit

Verified

A separate electrical/building permit is required for residential (single-family) solar photovoltaic (PV) systems in Peoria. Permit submittals are made online at devservices.peoriaaz.gov using a completed 400S – Solar Permit Application along with one set of plans and all supporting documentation. Solar submittals with all required documents are expedited with a 7 business-day first-submittal turnaround. PV systems not exceeding a maximum PV breaker of 40 amps may be eligible for over-the-counter plan review — contact OTC.building@peoriaaz.gov. A separate permit is required for any panel upgrade, new solar-ready panel, or de-rate of panels.

Verified 2026-07-16 · Source

Requirements

  • Submit online at devservices.peoriaaz.gov with a completed 400S – Solar Permit Application (Handout 400S) and one (1) set of plans with all supporting documentation
  • Installer must visually inspect trusses for pre-existing damage; if damage is noted, a structural engineer's repair design must be submitted with the application
  • Provide roof plans showing location of PV installation; structural engineering analysis is required if panels exceed 5 lbs./sq ft or 40 lbs. point load, or if trusses are constructed with less than 2x4 dimensional lumber
  • Provide cut sheets and mounting details for racks per roof covering type, including point-of-attachment locations and loads
  • Provide electrical one-line or three-line diagram (showing phases, neutral, and ground); ungrounded systems must note 'Ungrounded' on plans
  • Provide cut sheet and listing for inverter (DC to AC); inverters must be UL listed 1741 per 2018 IRC Section R324.3.1
  • PV panels/modules must be UL listed 1703 per 2018 IRC Section R902.4
  • Arc-Fault Circuit Protection (DC) required per 2017 NEC Article 690.11; Rapid Shutdown required per 2017 NEC Article 690.12
  • PV equipment must be installed per NEC 690 and posted with required warnings, signage, and plaques per NEC 705-10, 690-13(B) & 690-56
  • A separate 400M permit application is required for any panel upgrade, new solar-ready panel, or de-rate, along with manufacturer specifications, load calculations, and panel schedule

Required documents

  • Required400S – Solar Permit Application (Handout 400S)Solar permit application for residential PV systems; submit with complete plan set at devservices.peoriaaz.gov
  • Optional235 – Residential Solar Photovoltaic Systems (Handout 235, Rev. 08/23)Peoria's permit submittal requirements document for residential (single-family) PV systems, listing all required plan elements and code references

Fee schedule

Fee typeAmountNotes
Residential Solar PV permit$184 for systems with 40-amp circuit or less / 8kW or lessPeoria Development Fee Schedule, Rev. 9/2025 — 'Residential Solar Photovoltaic Permit: 40 Amp Circuit or less/8K or less: $184'.
Residential Solar De-Rate permit$115 for 40-amp circuit / over 8kWPeoria Development Fee Schedule, Rev. 9/2025 — 'Residential Solar De-Rate Permit: 40 Amp Circuit/over 8K: $115'.
Re-inspection fee$230 per re-inspectionPeoria Development Fee Schedule, Rev. 9/2025.

Residential Pool / Spa Permit

Verified

A permit is required for swimming pools, spas, and hot tubs in Peoria. Applications are submitted online at devservices.peoriaaz.gov using the 402 – Swimming Pool/Spa Permit Application. A separate permit is required for gas lines and subpanels exceeding 40 amps serving the pool. Pool and spa barrier requirements must be met at final inspection. Permit fees are a flat rate of $345 for pools/spas/hot tubs, plus $87 for the plot plan review. Plan review turnaround is 5 business days (1st submittal).

Verified 2026-07-16 · Source

Requirements

  • Submit online at devservices.peoriaaz.gov with a completed 402 – Swimming Pool/Spa Permit Application
  • A separate permit is required for gas lines and subpanels exceeding 40 amps
  • Provide panel schedules and load calculations for pool/spa submittals that include de-rated panels for solar installation
  • Pool and spa barrier must comply with the 2018 International Fire Code / 2018 IRC pool barrier requirements; barrier must meet one of the following: City-approved pool fence; self-closing/self-latching doors and windows with direct access to pool with latching devices at 54" above floor; window openings restricted to no more than 4" as an alternative (except bedroom egress windows); motorized pool cover; or above-ground pool with secured ladder/barrier
  • Each owner must reconstruct and repair any masonry screen walls removed for pool installation consistent with the existing wall design, texture, color, and height
  • Age-restricted communities (55+) with no children under 6: may provide a pool owner's declaration in lieu of standard barriers

Required documents

  • Required402 – Swimming Pool/Spa Permit Application (Handout 402)Permit application for residential pools, spas, and hot tubs; submit online at devservices.peoriaaz.gov
  • Optional510 – Pool and Spa Barrier (Handout 510)Pool and spa barrier requirements document

Fee schedule

Fee typeAmountNotes
Swimming pool, spa, and hot tub permit — flat rate$345Peoria Development Fee Schedule, Rev. 9/2025 — 'Swimming Pool, Spa and Hot Tub Permit: $345'.
Review of swimming pool plot plan$87Peoria Development Fee Schedule, Rev. 9/2025 — 'Review of Swimming Pool Plot Plan: $87'.
Re-inspection fee$230 per re-inspectionPeoria Development Fee Schedule, Rev. 9/2025.

Patio Cover / Carport Permit

Verified

A building permit is required for the construction, repair, or enclosure of a patio cover or carport in Peoria. Plans are submitted online at devservices.peoriaaz.gov with a completed 400M – Miscellaneous Building Permit Application and a site plan. A footing inspection and a final inspection must both be passed. Patio covers are limited to one-story not exceeding 12 feet in height and used only for recreational/outdoor living purposes. Carports must be one-story and open on two or more sides (except structural supports).

Verified 2026-07-16 · Source

Requirements

  • Submit online at devservices.peoriaaz.gov with a completed 400M – Miscellaneous Building Permit Application and site plan
  • Site plan must show location of patio cover relative to property lines, easements, existing structures, and driveway width and slope
  • Patio covers: one-story maximum, 12-foot maximum height, recreational and outdoor living use only
  • Carports: one-story, open on two or more sides except structural supports; any enclosed use above = must comply with garage regulations
  • If patio cover posts are within 3 feet of a property line (for attached residences only where zoning allows): one-hour fire-resistive wall and parapet on the property line is required, with no openings. Exception: no wall required on the side next to a street or alley
  • Work must comply with 2018 IBC, IRC, and current Peoria Zoning Ordinances per Ordinance 2019-12

Required documents

  • Required400M – Miscellaneous Building Permit ApplicationGeneral residential permit application used for patio covers and carports
  • Optional502 – Attached Patio Cover & Carport Standards (Handout 502, Rev. 04/23)Peoria's detailed requirements for patio covers and carports, including definitions, zoning requirements, construction requirements, and inspection sequence

Fee schedule

Fee typeAmountNotes
Patio cover / carport permit — valuation-basedValuation-based permit fee per Development Fee Schedule. Patio cover/deck/balcony valuation = $13/sq ft (Peoria Building Valuation Table, 'Other' column). Minimum fee $87.Peoria Development Fee Schedule, Rev. 9/2025. Plan check fee is an additional 65% of the permit fee.

Fence / Block Wall Permit

Verified

A building permit is required for residential fences or block walls over 3 feet in height in Peoria. Fences and walls under 3 feet do not require a permit (but corner lot properties must adhere to Peoria Standard Detail PE-091). Walls over 7 feet require a permit from the Building department with structural calculations. Retaining walls and sound walls require a permit from the Engineering department with structural calculations. Applications are submitted with a 400M – Miscellaneous Building Permit Application and a site plan.

Verified 2026-07-16 · Source

Requirements

  • Less than 3 feet at the tallest point: no building permit required (corner lots must comply with Peoria Standard Detail PE-091)
  • Over 3 feet in height: building permit and site plan required; Engineering review also required
  • Over 7 feet in height: building permit required with structural calculations
  • Retaining walls/sound walls: separate Engineering department permit required with structural calculations
  • When property is flagged as 'Special Flood Hazard' or 'Drainage Review Required': Engineering review required
  • Site plan must include: owner information, site address and APN, north arrow and scale, adjacent roadways with ROW dimensions, lot lines with dimensions, existing easements, location and height of existing and proposed fence/wall/gates, size and type of material, and distance between support columns
  • Properties north of Pinnacle Peak with over 10% slope: must demonstrate compliance with hillside standards (Peoria Zoning Ordinance Sections 21-710 through 21-734)

Required documents

  • Required400M – Miscellaneous Building Permit ApplicationResidential permit application used for fences and block walls
  • Optional503 – Residential Fence or Block Wall Checklist (Handout 503, Rev. 06/22)Peoria's requirements for residential fence and block wall permits, including site plan content, height thresholds, and special provisions for hillside properties

Fee schedule

Fee typeAmountNotes
Fence permit — valuation-basedValuation based on linear footage per Peoria Building Valuation Table: fences less than 3 feet or added to existing = $1.50/linear ft; 3 to 7 feet high = $4/linear ft; over 7 feet high = $6.50/linear ft. Minimum permit fee $87.Peoria Development Fee Schedule, Rev. 9/2025 — 'Fences (Val/lf)'. Plan check fee is an additional 65% of the permit fee.

Demolition Permit

Verified

A demolition permit is required for demolition of structures in Peoria. The permit fee is a flat rate per the Development Fee Schedule.

Verified 2026-07-16 · Source

Requirements

  • Submit online at devservices.peoriaaz.gov with a 400M – Miscellaneous Building Permit Application specifying demolition scope
  • Contractor information required at permit issuance

Required documents

  • Required400M – Miscellaneous Building Permit ApplicationUsed for demolition permit applications

Fee schedule

Fee typeAmountNotes
Demolition permit — flat rate$150Peoria Development Fee Schedule, Rev. 9/2025 — 'Demolition Permit: $150'.

Sign Permit

Verified

A sign permit is required for new or modified signage in Peoria. The permit includes a plan review fee due at time of application and separate sign area and inspection fees calculated by staff during review. Sign permits are issued through the Planning Division. Illuminated building-mounted wall signs and freestanding monument signs require a planning inspection. A planning inspection for all sign types requires emailing daytime (and nighttime if illuminated) photos. Inspections are conducted via online scheduling at devservices.peoriaaz.gov.

Verified 2026-07-16 · Source

Requirements

  • Submit a sign permit application to the Planning Division (623-773-7200)
  • Plan review fee due at time of submittal; sign area fees and inspection fees are calculated by staff and due before permit issuance
  • After permit approval: inspection scheduling via online portal or email; for illuminated and freestanding monument signs, schedule via devservices.peoriaaz.gov; for all sign types, email daytime (and nighttime if illuminated) photos for final planning inspection

Required documents

  • RequiredSign Permit ApplicationAvailable from the Planning Division (Planning & Community Development Department)

Fee schedule

Fee typeAmountNotes
Plan review fee (Sign Permit Review)$36CORRECTED 2026-07-16: City of Peoria Code of Ordinances, FEE TABLE 27-8 (current, amended through Ord. No. 2025-28, 11-4-25) — 'Sign Permit Review: $36.00'. Previously recorded as $30 (from Development Fee Schedule, Rev. 9/2025); the codified fee table shows $36 as the governing figure, which the Rev. 9/2025 PDF appears not to reflect. Source: https://codelibrary.amlegal.com/codes/peoriaaz/latest/peoria_az/0-0-0-46898
Sign permit extension$120CORRECTED 2026-07-16: City of Peoria Code of Ordinances, FEE TABLE 27-8 (current, amended through Ord. No. 2025-28, 11-4-25) — 'Sign Permit Extension: $120.00'. Previously recorded as $100 (from Development Fee Schedule, Rev. 9/2025); the codified fee table shows $120 as the governing figure, which the Rev. 9/2025 PDF appears not to reflect. Source: https://codelibrary.amlegal.com/codes/peoriaaz/latest/peoria_az/0-0-0-46898
Sign area fee — 0 to 32 sq ft$70Peoria Development Fee Schedule, Rev. 9/2025, Section I.
Sign area fee — 33 to 48 sq ft$80Peoria Development Fee Schedule, Rev. 9/2025, Section I.
Sign area fee — over 49 sq ft$120Peoria Development Fee Schedule, Rev. 9/2025, Section I.
Sign electrical inspection fee$75Peoria Development Fee Schedule, Rev. 9/2025, Section I — 'Sign Inspection Fees: Electrical Inspection: $75'.
Sign footing inspection fee$75Peoria Development Fee Schedule, Rev. 9/2025, Section I — 'Sign Inspection Fees: Footing Inspection: $75'.

EV Charger / EVSE Permit

Verified

The City of Peoria permits EV charger installations as electrical work via the 400M – Miscellaneous Building Permit Application (the same standalone-electrical mechanism used for service upgrades, subpanels, and solar de-rates), governed by the 2017 NEC as adopted with City amendments per Ordinance 2019-12. A secondary source (search-indexed content citing Peoria City Code Fee Table 27-6, Development and Engineering Department/Building Safety fees) reports a possible flat $45.00 fee category covering 'additions, alterations, remodeling, accessory structures, EV chargers, meter relocation and service replacement,' but this specific figure could not be independently confirmed against the primary source in this review — both codelibrary.amlegal.com (Cloudflare-blocked, HTTP 403) and the City's own live Development Fee Schedule PDF (also HTTP 403) refused automated access, and a repeat search did not reproduce the same figure. The independently verified fee mechanism is the City's general valuation-based Electrical Permit fee (minimum $87), documented in this file's electrical-permit entry from the same Development Fee Schedule (Rev. 9/2025).

Verified 2026-07-20 · Source

Requirements

  • Electrical work for an EV charger must comply with the 2017 NEC as adopted and amended per Ordinance 2019-12
  • Submit online at devservices.peoriaaz.gov with a 400M – Miscellaneous Building Permit Application for a standalone EV charger circuit; electrical work within a larger building permit uses that project's application instead
  • Contractor information (name, Peoria Business License, AZROC number) required at permit issuance
  • A possible dedicated flat fee for EV chargers is referenced in secondary sources citing Peoria City Code Fee Table 27-6, but was not independently confirmed against the primary source in this review — confirm current fee directly with Development Services before applying

Required documents

  • Required400M – Miscellaneous Building Permit ApplicationUsed for standalone electrical scopes including EV charger circuits, service upgrades, subpanels, and de-rates

Fee schedule

Fee typeAmountNotes
Electrical permit — valuation-based (independently verified mechanism)Valuation-based permit fee per Development Fee Schedule. Minimum fee $87.Peoria Development Fee Schedule, Rev. 9/2025 — the same mechanism documented in this file's electrical-permit entry; plan check fee is an additional 65% of the permit fee
Possible dedicated flat fee (unconfirmed)$45.00 — reported by secondary/search-indexed sources as covering 'additions, alterations, remodeling, accessory structures, EV chargers, meter relocation and service replacement' under Peoria City Code Fee Table 27-6Could NOT be independently confirmed against the primary source in this review: codelibrary.amlegal.com and the City's live Development Fee Schedule PDF both returned HTTP 403 (Cloudflare-blocked) on repeated attempts, and a follow-up search did not reproduce this figure. Presented for transparency, not as a confirmed fact — verify directly with Development Services (peoriaaz.gov) before relying on it.

Sources & verification

Verified against official sources. Last reviewed 2026-07-16.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Peoria building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-06-29)View current record →All versions →

Permalink: /arizona/maricopa-county/peoria/as-of/2026-07-16/

Snapshot date: 2026-07-16

Commit: 0214041

Reproducible from PermitBase’s version-controlled dataset, commit 0214041.