Skip to main content
PermitBase

Version history — Phoenix, Arizona

This is PermitBase’s own verified record for Phoenix, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Phoenix’s actual law was at that time.

Permanent link to today’s record

/arizona/maricopa-county/phoenix/as-of/2026-06-29/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-06-29Initial record — coverage began 2026-06-29. This is also the current record.
    • Phoenix, Arizona — Electrical Permit fee record added: Temporary Power — Inspection Fee ($195 each)
    • Phoenix, Arizona — Electrical Permit fee record added: Additional Utility Meter Fees (First gas, electric, or water meter: no additional fee (one meter of each type included with the permit fee); each additional meter per utility: $98 each)
    • Phoenix, Arizona — Electrical Permit fee record removed: Temporary Power inspection