Version history — Queen Creek, Arizona
This is PermitBase’s own verified record for Queen Creek, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Queen Creek’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-26Current record
- 2026-08-21Superseded
- Queen Creek, Arizona — Commercial Building Permit (New Construction) fee record updated: Per the Town's own Fee Table, applied against the greater of the ICC-published square-footage Valuation Data (by commercial occupancy/construction type) or the applicant's declared project valuation — the same Town-wide valuation-banded Fee Table documented in this file's residential-building-permit entry (e.g., $69.00 for the first $2,000 of valuation plus $11/additional $1,000 to $40,000, scaling to $18,327 for the first $5,000,000 plus $1/additional $1,000 thereafter). The specific ICC per-square-foot rate for commercial occupancy/construction-type classifications (e.g., B, M, S) could not be independently re-extracted this review — the Town's Valuation Data / Development Services Fee Schedule PDFs (documents 40835 and 40807) returned only page-count metadata with no extractable text via this review's available fetch tools (direct fetch blocked by the Town's Akamai WAF; Wayback Machine has no snapshot of document 40807). Omitted rather than invented; the dollar-banded Fee Table mechanism itself is verified Town-wide from this file's other entries, which did successfully extract it. → Per the Town's own Fee Table, applied against the greater of the ICC-published square-footage Valuation Data (by commercial occupancy/construction type) or the applicant's declared project valuation — the same Town-wide valuation-banded Fee Table documented in the residential-building-permit entry (e.g., $69.00 for the first $2,000 of valuation plus $11/additional $1,000 to $40,000, scaling to $18,327 for the first $5,000,000 plus $1/additional $1,000 thereafter). No specific ICC per-square-foot rate for commercial occupancy/construction-type classifications (e.g., B, M, S) is reproduced here; consult the Town's Valuation Data / Development Services Fee Schedule PDFs (documents 40835 and 40807) for those rates. The dollar-banded Fee Table mechanism itself is the verified Town-wide fee basis.
- 2026-08-20Superseded
- 2026-08-17Superseded
- Queen Creek, Arizona — Commercial Building Permit (New Construction) fee record updated: Per the Town's own Fee Table, applied against the greater of the ICC-published square-footage Valuation Data (by commercial occupancy/construction type) or the applicant's declared project valuation — the same Town-wide valuation-banded Fee Table documented in this file's residential-building-permit entry (e.g., $69.00 for the first $2,000 of valuation plus $11/additional $1,000 to $40,000, scaling to $18,327 for the first $5,000,000 plus $1/additional $1,000 thereafter). The specific ICC per-square-foot rate for commercial occupancy/construction-type classifications (e.g., B, M, S) could not be independently re-extracted this session — the Town's Valuation Data / Development Services Fee Schedule PDFs (documents 40835 and 40807) returned only page-count metadata with no extractable text via this session's available fetch tools (direct fetch blocked by the Town's Akamai WAF; Wayback Machine has no snapshot of document 40807). Omitted rather than invented; the dollar-banded Fee Table mechanism itself is verified Town-wide from this file's other entries, which did successfully extract it. → Per the Town's own Fee Table, applied against the greater of the ICC-published square-footage Valuation Data (by commercial occupancy/construction type) or the applicant's declared project valuation — the same Town-wide valuation-banded Fee Table documented in this file's residential-building-permit entry (e.g., $69.00 for the first $2,000 of valuation plus $11/additional $1,000 to $40,000, scaling to $18,327 for the first $5,000,000 plus $1/additional $1,000 thereafter). The specific ICC per-square-foot rate for commercial occupancy/construction-type classifications (e.g., B, M, S) could not be independently re-extracted this review — the Town's Valuation Data / Development Services Fee Schedule PDFs (documents 40835 and 40807) returned only page-count metadata with no extractable text via this review's available fetch tools (direct fetch blocked by the Town's Akamai WAF; Wayback Machine has no snapshot of document 40807). Omitted rather than invented; the dollar-banded Fee Table mechanism itself is verified Town-wide from this file's other entries, which did successfully extract it.
- 2026-08-16Superseded
- 2026-08-01Superseded
- Queen Creek, Arizona — Commercial Building Permit (New Construction) record added
- Queen Creek, Arizona — Commercial Tenant Improvement Permit record added
- 2026-07-20Superseded
- Queen Creek, Arizona — EV Charging Station Permit (Electrical Permit) record added
- 2026-07-07Superseded
- 2026-07-06Initial record — coverage of Queen Creek began