Re-Roofing Permit in Tolleson, Arizona

Required for re-roofing work in Tolleson, reviewed against the City's currently adopted 2024 IBC/IRC roofing provisions. Billed under the City's general valuation-based Building Permit Fee, as no dedicated flat re-roofing fee is published.

Verified 2026-07-06 · Source

When you need this permit

  • Building permit required before re-roofing a residential or commercial structure within Tolleson city limits
  • Complete Application and Site Plan/roof scope documentation showing the work to be performed
  • Construction Plans/roof material specifications of sufficient clarity to show conformance with the adopted 2024 IBC/IRC

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee — Based on ValuationCity of Tolleson Citywide Fee Schedule, Development Services section — no dedicated re-roofing permit fee line exists; billed under the general Building Permit Fee valuation table
Same valuation-based table as new construction (see Residential Building Permit fee entry)

Review timeline

Plan reviewTolleson’s published plan-review target
5–10 business days

How long did your Re-Roofing Permit permit actually take in Tolleson?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Roof Inspection

    Verifies sheathing, underlayment, and proposed roofing material before final cover

See the full Tolleson inspection guide — scheduling & re-inspection fees →

Tips

  • As of July 2026, the City of Tolleson does not appear to publish a re-roofing-specific plan review turnaround time or a dedicated re-roofing checklist distinct from the general Development Handbook guidance (1-2 weeks for residential-scale work). There is no verifiable online source for a re-roofing-specific SLA or a separate no-permit exemption threshold — call Development Services at 623-936-7111 to confirm whether a specific like-for-like re-roof scope requires a permit.

Frequently asked questions

The City of Tolleson requires a building permit for work altering or repairing a structure's roof under its general Building Permit Flow requirement; no published exemption for minor like-for-like re-roofing was found on the City's official site as of July 2026 — confirm scope-specific requirements with Development Services at 623-936-7111.

In Tolleson, the published Building Permit Fee — Based on Valuation is: Same valuation-based table as new construction (see Residential Building Permit fee entry). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Tolleson's published plan-review target for a re-roofing permit is 5–10 business days.

You'll need: Building Permit Application; Roof Plan / Material Specification. See the required-documents checklist on this page for details on each.

Tolleson requires 1 inspection(s) for a re-roofing permit, in order: Roof Inspection. Schedule each through City of Tolleson Development Services Department — Building Division (623-936-7111).

Apply through City of Tolleson Development Services Department — Building Division at Tolleson Civic Center, 9055 W. Van Buren Street, Tolleson, AZ 85353. Phone: 623-936-7111, email: developmentservices@tolleson.az.gov. Office hours: Monday - Thursday, 7:30 a.m. - 6:00 p.m. (closed Friday - Sunday). Fax 623-936-7117. Permit applications, plans, and licenses may also be submitted through the City's Civic Access online portal. Applications are submitted in person at the Civic Center front counter or via the Civic Access portal; three sets of plans are required for building permit submittal (per the City's Development Procedures handbook).. Official information: https://www.tolleson.az.gov/739/Permits-Construction.

Tolleson, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The City of Tolleson independently adopts and administers its own construction codes through its Development Services Department / Building Division. Source: City of Tolleson Permits & Construction page (tolleson.az.gov/739/Permits-Construction).; 2024 International Building Code (IBC), as published by the International Code Council. Source: City of Tolleson Permits & Construction page (tolleson.az.gov/739/Permits-Construction), directly fetched July 2026, listing currently adopted codes.; 2024 International Residential Code (IRC), as published by the International Code Council. Source: City of Tolleson Permits & Construction page.; 2024 International Mechanical Code (IMC), as published by the International Code Council. Source: City of Tolleson Permits & Construction page.; 2024 International Plumbing Code (IPC), as published by the International Code Council. Source: City of Tolleson Permits & Construction page.; 2023 National Electrical Code (NEC), as published by the National Fire Protection Association (one edition behind the 2024 ICC set, consistent with the standard NFPA/ICC publication cycle offset seen across Maricopa County cities). Source: City of Tolleson Permits & Construction page.; 2024 International Fuel Gas Code (IFGC). Source: City of Tolleson Permits & Construction page.; 2024 International Existing Building Code (IEBC). Source: City of Tolleson Permits & Construction page.; 2024 International Fire Code (IFC). Source: City of Tolleson Permits & Construction page.; 2024 International Energy Conservation Code (IECC). Source: City of Tolleson Permits & Construction page.; 2024 International Property Maintenance Code (IPMC). Source: City of Tolleson Permits & Construction page.; 2010 ADA Standards for Accessible Design. Source: City of Tolleson Permits & Construction page.; NOTE ON SUPERSEDED SOURCE: The City's own 'DEVELOPMENT PROCEDURES for Building Permits, Plan Review, Zoning Site Plan Review, Re-Zoning, Variances and Diminution of Value Waiver' handbook (rev. 01/22/24) states an older code set ('International Building Code 2018, International Residential Code 2018, International Plumbing Code 2018, International Mechanical Code 2018, National Electrical Code 2017, International Property Maintenance Code 2018, International Fire Code 2018, with no amendments'). This handbook predates the City's current live Permits & Construction webpage, which lists the full 2024 ICC suite (plus 2023 NEC) as currently adopted — the 2024-suite listing on the live official page is treated as authoritative/current since it is the most recently published statement of adopted codes. Source: City of Tolleson Development Handbook (rev. 01/22/24), tolleson.az.gov/DocumentCenter/View/2456/Development-Handbook, cross-referenced against the live Permits & Construction page.; Manufactured homes, mobile homes, and factory-built buildings are regulated directly by the State of Arizona (A.R.S. § 41-4001 et seq., Arizona Department of Fire, Building and Life Safety / Office of Manufactured Housing) for construction/installation standards; cities issue a separate on-site permit for placement, foundation/tie-down, zoning compliance, and site improvements consistent with standard Arizona practice. Source: City of Tolleson Building Permit Flow description (Development Handbook, rev. 01/22/24) describing the City's general permitting authority over placement/site work.. Local amendments apply — see the Tolleson overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tolleson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.