Codes adopted

2018 International Building Code (IBC) — adopted by Maricopa County Board of Supervisors 17 August 2022 (with AZBO/MAG amendments); Local Additions and Addenda TA2022001 dated 19 September 20222018 International Residential Code (IRC) — adopted 17 August 2022 (BOS vote, with AZBO/MAG amendments and Local Additions and Addenda)2018 International Plumbing Code (IPC) — adopted 17 August 2022 (BOS vote, with AZBO/MAG amendments)2018 International Mechanical Code (IMC) — adopted 17 August 2022 (BOS vote, with AZBO/MAG amendments)2018 International Fuel Gas Code (IFGC) — adopted 17 August 2022 (BOS vote, with AZBO/MAG amendments)2018 International Existing Building Code (IEBC) — adopted 17 August 2022 (BOS vote, with AZBO/MAG amendments)2018 International Green Construction Code (IgCC) — adopted 17 August 2022, optional use2018 International Energy Conservation Code (IECC) — adopted 17 August 2022, optional use2017 National Electrical Code (NEC) — adopted 17 August 2022 (BOS vote, with AZBO/MAG amendments)

Permit types & fees

Residential Building Permit (New Construction, Addition, Accessory Structure)

Verified

Required for new single-family dwellings, residential additions, detached garages, carports, accessory structures, and other residential construction in the unincorporated areas of Maricopa County. The Maricopa County Planning and Development Department regulates all residential development in unincorporated areas (areas outside any incorporated city or town). Applications and all required documents are submitted online through the county's Permit Center portal.

Verified 2026-06-29 · Source

Requirements

  • Required for new single-family dwellings, additions, detached garages, carports, accessory structures, and structural alterations in unincorporated Maricopa County
  • Apply online through Permit Center (https://maricopacountyaz-energovweb.tylerhost.net/apps/selfservice); create a personal or company account before applying
  • Submit site plan (view a typical site plan example at https://www.maricopa.gov/DocumentCenter/View/97767) and all required construction plan documents as PDFs
  • Know the project valuation (used to calculate fees per Local Additions and Addenda Table 1-A)
  • Know the project's lot coverage (see calculation example at https://www.maricopa.gov/DocumentCenter/View/92458)
  • All PDF submissions must be properly rotated, flattened, and optimized per the Document Preparation Tip Sheet
  • Review CC&Rs of any HOA before construction; county permit issuance does not override HOA CC&Rs

Required documents

  • RequiredConstruction Plan Checklist (PDF)Maricopa County checklist of required plan elements for residential construction; available at https://www.maricopa.gov/DocumentCenter/View/4722/Construction-Plan-Checklist-PDF
  • RequiredTypical Site Plan with ChecklistExample and checklist for the required site plan; available at https://www.maricopa.gov/DocumentCenter/View/97767/Typical-Site-Plan-with-Checklist
  • OptionalLot Coverage Calculation ExampleExample for calculating lot coverage, required as part of the application; available at https://www.maricopa.gov/DocumentCenter/View/92458
  • RequiredDocument Preparation Tip SheetRequirements for PDFs submitted to Permit Center; available at https://www.maricopa.gov/DocumentCenter/View/41876/DOCUMENT-PREPARATION-TIP-SHEET-PDF

Fee schedule

Fee typeAmountNotes
Building permit/inspection fee (Building-Inspection) — valuation-based per Table 1-A$1–$500: $23.50; $501–$2,000: $23.50 for first $500 + $3.05 per additional $100; $2,001–$25,000: $69.25 for first $2,000 + $14.00 per additional $1,000; $25,001–$50,000: $391.75 for first $25,000 + $10.10 per additional $1,000; $50,001–$100,000: $643.75 for first $50,000 + $7.00 per additional $1,000; $100,001–$500,000: $993.75 for first $100,000 + $5.60 per additional $1,000; $500,001–$1,000,000: $3,233.75 for first $500,000 + $4.75 per additional $1,000; $1,000,001+: $5,608.75 for first $1,000,000 + $3.65 per additional $1,000Local Additions and Addenda, Table 1-A (June 2024 Summary of Fee Schedule). Project valuation is based on current ICC Building Valuation Data as modified for Arizona. Alterations are valued at 20% of new construction value for the area of alteration. Non-habitable accessory buildings (other than pipe-rail horse corrals) valued as a private garage.
Plan review fee (Building-Plan Review)65% of the calculated permit feeLocal Additions and Addenda §Processing. Plan review fee is separate from the permit/inspection fee. Covers up to three submissions and reviews. No plan review fee for minor/web-issued permits. Upfront plan review payment is required before review begins.
After-hours residential inspection$150 per inspectionLocal Additions and Addenda (Building-Residential After Hours Inspection)
Reinspection/failed inspection$150 per residential reinspectionLocal Additions and Addenda (Building-Residential Failed Inspection)

Commercial Building Permit (New Construction, Tenant Improvement, Remodel)

Verified

Required for all new commercial, industrial, and multi-family buildings, tenant improvements, remodels, and change-of-use projects in the unincorporated areas of Maricopa County. The Maricopa County Planning and Development Department enforces the 2018 International Building Code (IBC) with local amendments for commercial construction in unincorporated areas. Applications are submitted online through Permit Center.

Verified 2026-06-29 · Source

Requirements

  • Required for all new commercial, industrial, and multi-family construction, tenant improvements, remodels, and change-of-occupancy projects in unincorporated Maricopa County
  • Apply online through Permit Center (https://maricopacountyaz-energovweb.tylerhost.net/apps/selfservice); company account recommended for contractor applicants
  • Submit site plan (view a typical commercial site plan at https://www.maricopa.gov/DocumentCenter/View/71170/Typical-Site-Plan-Commercial) and complete construction plans as PDFs
  • Know the project valuation; commercial shell buildings are valued at 80% of new building value per local amendments
  • PDF files must be properly rotated, flattened, and optimized per Document Preparation Tip Sheet

Required documents

  • RequiredTypical Site Plan — CommercialExample commercial site plan; available at https://www.maricopa.gov/DocumentCenter/View/71170/Typical-Site-Plan-Commercial
  • RequiredCommercial Site Plan ChecklistChecklist for commercial submittals; available at https://www.maricopa.gov/6723/Commercial-Site-Plan-Checklist
  • RequiredDocument Preparation Tip SheetRequirements for PDFs submitted to Permit Center; available at https://www.maricopa.gov/DocumentCenter/View/41876/DOCUMENT-PREPARATION-TIP-SHEET-PDF

Fee schedule

Fee typeAmountNotes
Building permit/inspection fee (Building-Inspection) — valuation-based per Table 1-A$1–$500: $23.50; $501–$2,000: $23.50 for first $500 + $3.05 per additional $100; $2,001–$25,000: $69.25 for first $2,000 + $14.00 per additional $1,000; $25,001–$50,000: $391.75 for first $25,000 + $10.10 per additional $1,000; $50,001–$100,000: $643.75 for first $50,000 + $7.00 per additional $1,000; $100,001–$500,000: $993.75 for first $100,000 + $5.60 per additional $1,000; $500,001–$1,000,000: $3,233.75 for first $500,000 + $4.75 per additional $1,000; $1,000,001+: $5,608.75 for first $1,000,000 + $3.65 per additional $1,000Local Additions and Addenda, Table 1-A (June 2024 Summary of Fee Schedule). Commercial shell buildings valued at 80% of new building value; alterations at 20% of new construction value for the area of alteration.
Plan review fee (Building-Plan Review)65% of the calculated permit feeLocal Additions and Addenda §Processing. Covers up to three submissions and reviews.
After-hours commercial inspection$250 per inspectionLocal Additions and Addenda (Building-Commercial After Hours Inspection)
Reinspection/failed inspection$250 per commercial reinspectionLocal Additions and Addenda (Building-Commercial Failed Inspection)

Electrical Permit

Verified

Required for electrical service installations, upgrades, and repairs in the unincorporated areas of Maricopa County. Maricopa County Planning and Development issues electrical permits under the 2017 National Electrical Code (NEC) with local amendments. Several categories are available: web-issued (instant, automated), non-technical (1–2 business day staff processing), and technical/standard review. Applications are submitted online through Permit Center.

Verified 2026-06-29 · Source

Requirements

  • Web-issued (instant, automated online): replacement or upgrade of electrical service up to 200 amps
  • Non-technical (1–2 business day processing): electrical clearance only ≤200 amps; electrical repair/replace like-for-like; electrical upgrade 0–200 amps; panel ≤200 amps, outlets, or fixtures
  • Technical/standard review (site plan required): electrical service upgrade or connection over 200 amps; electrical service to a shared well
  • Apply online through Permit Center at https://maricopacountyaz-energovweb.tylerhost.net/apps/selfservice
  • Virtual inspections available for: Electrical Service Replacement or Upgrade to 400A; Main Breaker Derate for PV Prep; Minor Electrical Repairs; Gas/Electrical Clearances

Required documents

  • RequiredOnline Permit Center ApplicationAll electrical permits are applied for through Permit Center online at https://maricopacountyaz-energovweb.tylerhost.net/apps/selfservice

Fee schedule

Fee typeAmountNotes
Electrical service 1–200 amps (Minor Self Service)$50 flatLocal Additions and Addenda Flat Rate Fees (June 2024 Summary of Fee Schedule)
Electrical service 201–400 amps (Electrical - 201-400 amp Service)$75 total ($50 Minor Self Service base + $25 upcharge)Local Additions and Addenda Flat Rate Fees. Fee pair: $50 Minor Self Service + $25 upcharge = $75 total.
Electrical service over 400 amps (Electrical - over 400 amp Service)$120 total ($50 Minor Self Service base + $70 upcharge)Local Additions and Addenda Flat Rate Fees. Fee pair: $50 Minor Self Service + $70 upcharge = $120 total.

Plumbing Permit

Verified

Required for plumbing installations and repairs in the unincorporated areas of Maricopa County. Maricopa County Planning and Development issues plumbing permits under the 2018 International Plumbing Code (IPC) with local amendments. Web-issued (instant) and standard-review categories apply depending on project type. Water heater replacement does not require a permit if done per manufacturer's specifications. Applications are submitted online through Permit Center.

Verified 2026-06-29 · Source

Requirements

  • Web-issued (instant, automated): plumbing repair like-for-like; solar water heater with ground-mounted tank; sewer line repair for single-family residential
  • Non-technical (1–2 business day processing): new gas line for BBQ, fireplace, pit, wok, Kiva, pool/spa heater; propane tank less than 250 gallons
  • Technical/standard review: propane tanks 250 gallons or larger
  • Apply online through Permit Center at https://maricopacountyaz-energovweb.tylerhost.net/apps/selfservice
  • Virtual inspections available for: Repair/Replace Gas Line; Sewer/Septic Lines

Required documents

  • RequiredOnline Permit Center ApplicationAll plumbing permits are applied for through Permit Center online at https://maricopacountyaz-energovweb.tylerhost.net/apps/selfservice

Fee schedule

Fee typeAmountNotes
Plumbing repair/replace like-for-like; sewer line SFR; irrigation system (Minor Self Service)$50 flat eachLocal Additions and Addenda Flat Rate Fees (June 2024 Summary of Fee Schedule)
Plumbing — install or replace equipment/fixture/devices (Minor Self Service)$50 flatLocal Additions and Addenda Flat Rate Fees
New gas line: BBQ, fireplace, pit, wok, Kiva, pool/spa heater (Minor Self Service)$50 flatLocal Additions and Addenda Flat Rate Fees

Mechanical / HVAC Permit

Verified

Required for HVAC and mechanical system installations in the unincorporated areas of Maricopa County. Maricopa County Planning and Development issues mechanical permits under the 2018 International Mechanical Code (IMC) and 2018 International Fuel Gas Code (IFGC) with local amendments. A/C, evaporative cooler, and like-for-like mechanical replacement permits are web-issued (instant). Roof-mounted HVAC units require technical/standard review. Apply through Permit Center online.

Verified 2026-06-29 · Source

Requirements

  • Web-issued (instant, automated): A/C replacement or new unit (ground-mounted); evaporative cooler; HVAC replacement; mechanical repair/replace like-for-like
  • Non-technical (1–2 business day processing): mechanical — new or upgrade ground-mounted unit, A/C, evaporative cooler, HVAC
  • Technical/standard review (site plan required): roof-mounted A/C, evaporative cooler, or HVAC
  • Apply online through Permit Center at https://maricopacountyaz-energovweb.tylerhost.net/apps/selfservice
  • Virtual inspections available for: Electrical Service Replacement or Upgrade to 400A (HVAC prep); Gas/Electrical Clearances

Required documents

  • RequiredOnline Permit Center ApplicationAll mechanical permits are applied for through Permit Center online at https://maricopacountyaz-energovweb.tylerhost.net/apps/selfservice

Fee schedule

Fee typeAmountNotes
Air conditioner / evaporative cooler / mechanical (Minor Self Service)$50 flatLocal Additions and Addenda Flat Rate Fees (June 2024 Summary of Fee Schedule)
Gas line (connect or clearance) (Minor Self Service)$50 flatLocal Additions and Addenda Flat Rate Fees

Solar PV Permit (Roof-Mounted and Ground-Mounted Photovoltaic)

Verified

Required for residential photovoltaic (solar PV) system installations in the unincorporated areas of Maricopa County. Two distinct permit types apply: roof-mounted PV systems (minor residential electrical permit, flat fee of $300) and ground-mounted PV systems under 6 feet high (minor residential permit, flat fee of $500). Ground-mounted systems over 6 feet high are treated as accessory structures and have higher upfront fees. All applications submitted through Permit Center online.

Verified 2026-06-29 · Source

Requirements

  • Roof-mounted PV: classified as a minor residential electrical permit; submit online through Permit Center using specific file naming conventions
  • Ground-mounted PV less than 6 feet high: classified as a residential accessory permit; submit 3 sets of building plans and 7 sets of site plans online
  • Ground-mounted PV over 6 feet high: treated as a residential accessory structure; upfront fees of $110 plus additional review fees during plan review
  • Required documents for roof-mounted: Application Form (APPL-FORM.pdf); Building Plan Set including cut sheets, specs, and load calculations (BLDG-PLAN.pdf); Structural Calculations only if installed on a manufactured/mobile home (STRU-CALC.pdf)
  • All roof-mounted submissions must include: project valuation on the PV application; site-specific roof design showing photovoltaic array locations; rack system details including mounting hardware; anchoring and fastening details; equipment locations; product listing information; compliance with Maricopa County's current adopted NEC edition; complete one- and three-line electrical drawings; manufacturer's product information; utility interconnection information
  • Indicate compliance with the 2017 NEC on all submitted drawings

Required documents

  • RequiredSolar Permit Application Form (PDF)Complete application form for roof-mounted solar permit; must be submitted as APPL-FORM.pdf; available at https://www.maricopa.gov/DocumentCenter/View/46333
  • RequiredBuilding Plan Set (BLDG-PLAN.pdf)Cut sheets, specs, and load calculations — must all be in a single file, not submitted separately
  • OptionalStructural Calculations (STRU-CALC.pdf)Required only if solar system is installed on a manufactured/mobile home

Fee schedule

Fee typeAmountNotes
Roof-mounted residential solar PV (all-in flat fee)$300 totalPer Section 208 of the Maricopa County Local Additions and Addenda. Includes all administrative, building plan review, and building inspection fees. Payment due upon acceptance. Source: https://www.maricopa.gov/1923/Go-Solar-for-Residential-Service and Local Additions and Addenda Section 208.
Ground-mounted residential solar PV less than 6 feet high (all-in flat fee)$500 totalPer Local Additions and Addenda Section 208 and Maricopa County Zoning Ordinance Section 1602.1. Includes all administrative, zoning, building plan review, and building upfront inspection fees. Additional drainage fees may apply depending on site-specific engineering requirements. Source: https://www.maricopa.gov/1923/Go-Solar-for-Residential-Service
Ground-mounted residential solar PV over 6 feet high (accessory structure)$110 upfront plus additional review fees assessed during plan reviewSystem over 6 feet is treated as a residential accessory structure. Source: https://www.maricopa.gov/1923/Go-Solar-for-Residential-Service

Pool / Spa Permit (In-Ground and Above-Ground)

Verified

Required for swimming pools, spas, hot tubs, and other contained bodies of water in the unincorporated areas of Maricopa County. Any body of water greater than 18 inches deep and/or wider than 8 feet at any two measured points requires both a pool permit and a barrier. In-ground pool fees are valuation-based (at $200 per perimeter foot for valuation); above-ground pools/spas are a flat $75 fee. Pool barriers must be permitted and ISSUED before the pool is plastered or filled with water. Apply through Permit Center online.

Verified 2026-06-29 · Source

Requirements

  • Pool permit required for all bodies of water greater than 18 inches in depth and/or wider than 8 feet at any two measured points (does not apply to fountains less than 12 inches deep)
  • Pool barrier permit must be ISSUED before installing the barrier, plastering the pool, or filling the pool with water
  • Pools must not be located within the required front yard of the property
  • Pools must be set back at least 3 feet from all property lines
  • Pool barrier must be 60 inches above finished grade on the exterior side
  • Access and pedestrian gates must be self-closing, self-latching, and open AWAY from the pool; latch at 54 inches or higher
  • 4-inch maximum spacing for wrought iron barrier; otherwise the barrier must not allow passage of a 1-3/4-inch sphere
  • Chain link must be 11-gauge or heavier
  • Windows facing the pool enclosure must have a mesh screen and a lock restricting opening to no more than 4 inches, or a latching device at 54 inches above the floor
  • Apply online through Permit Center at https://maricopacountyaz-energovweb.tylerhost.net/apps/selfservice

Required documents

  • RequiredPool Permit Application (Permit Center online)Apply online through Permit Center; the decision engine will guide you through required documents for pool and barrier permits
  • OptionalResidential Pool and Barrier Requirements Information SheetSummary of pool and barrier requirements per the Local Additions and Addenda; available at https://www.maricopa.gov/6408/Residential-Pool-and-Barrier-Requirement

Fee schedule

Fee typeAmountNotes
In-ground pool — valuation-based (Building-Inspection)Valuation = $200 per perimeter foot; fee calculated from Table 1-A based on that valuationLocal Additions and Addenda: in-ground pools are valued at $200 per perimeter foot. The resulting valuation is then run through Table 1-A to determine the permit fee. Plan review fee (65% of permit fee) applies separately.
Above-ground pool or spa (Building-Above Ground Pool/Spa)$75 flatLocal Additions and Addenda Flat Rate Fees (June 2024 Summary of Fee Schedule)
Hot tub or spa in or above ground$75 flatLocal Additions and Addenda Flat Rate Fees

Fence / Block Wall Permit

Verified

Required for fences and block walls in the unincorporated areas of Maricopa County. Permit fees are valuation-based using per-lineal-foot rates published in the county's Local Additions and Addenda (e.g., chain link at $6/LF, CMU 4-inch block at $14–$21/LF, wrought iron at $16/LF, wood at $11/LF). The county publishes Fence Details drawings for various block wall and fence types. Apply through Permit Center online.

Verified 2026-06-29 · Source

Requirements

  • Permit required for fences and block walls in unincorporated Maricopa County
  • Apply online through Permit Center at https://maricopacountyaz-energovweb.tylerhost.net/apps/selfservice
  • Submit site plan showing fence/wall location, property lines, and setbacks
  • Valuation determined by fence type and length using per-lineal-foot rates from the Local Additions and Addenda

Required documents

  • OptionalFence Details 2019 (PDF)Maricopa County standard fence and block wall construction detail drawings for various types; available at https://www.maricopa.gov/DocumentCenter/View/4719/Fence-Details-2019-PDF
  • OptionalFence Details for Sun City and Sun City WestBlock wall and fence construction details specific to Sun City and Sun City West; available at https://www.maricopa.gov/6407/Block-Wall-Fence-Construction-Details-fo

Fee schedule

Fee typeAmountNotes
Fence/wall permit fee — valuation-based per Table 1-AValuation per lineal foot by type: Retaining wall 0–2 ft: $15/LF; Retaining wall 2–4 ft: $25/LF; Retaining wall 4–6 ft: $42/LF; Retaining wall over 6 ft: $86/LF; Chain link (including mesh): $6/LF; CMU 4" block ≤6 ft high: $14/LF; CMU 4" block over 6 ft high: $21/LF; CMU 6" or 8" or other block: $22/LF; Wrought iron: $16/LF; Iron and wood: $18/LF; Wood: $11/LF; 3-strand barbed wire: $3/LF; Rail: $6/LF. Permit fee calculated from resulting valuation per Table 1-A.Local Additions and Addenda, Additional Value Determinations: Walls and Fences section (June 2024 Summary of Fee Schedule). Plan review fee (65% of permit fee) applies separately.

Demolition Permit

Verified

Required for demolition of structures in the unincorporated areas of Maricopa County. Demolition permits are a flat-rate fee of $50, processed as a non-technical permit. Apply through Permit Center online.

Verified 2026-06-29 · Source

Requirements

  • Required for demolition of any structure in unincorporated Maricopa County
  • Apply online through Permit Center at https://maricopacountyaz-energovweb.tylerhost.net/apps/selfservice
  • Non-technical permit: processed in approximately 1–2 business days; all correspondence via email

Required documents

  • RequiredOnline Permit Center ApplicationDemolition permits are applied for through Permit Center online at https://maricopacountyaz-energovweb.tylerhost.net/apps/selfservice

Fee schedule

Fee typeAmountNotes
Demolition Permit (Demolition) — flat rate$50Local Additions and Addenda Flat Rate Fees (June 2024 Summary of Fee Schedule)

EV Charger / EVSE Permit

Verified

Maricopa County Planning and Development does not publish a distinct EV charger/EVSE permit category or fee. Installing electric vehicle charging equipment falls under the county's existing minor electrical permit categories — "Panel of 200 Amps or Less, Outlets, Fixtures" or "Electrical Upgrade - 0 to 200 Amps" for a typical residential Level 2 charger circuit — confirmed directly against the county's Construction (Minor) Permit Information page, which lists all electrical permit categories and does not include EV charger/EVSE as a separate item. These minor electrical categories are billed the flat "Minor Self Service" fee under the 2017 NEC (with local amendments) and, for services up to 200 amps, can be issued instantly online through Permit Center.

Verified 2026-07-20 · Source

Requirements

  • Electrical Permit required for EV charger/EVSE circuit installation in unincorporated Maricopa County — typically filed as "Panel of 200 Amps or Less, Outlets, Fixtures" or "Electrical Upgrade - 0 to 200 Amps" through Permit Center (https://maricopacountyaz-energovweb.tylerhost.net/apps/selfservice)
  • Web-issued (instant, automated online) permitting is available for electrical service/panel work up to 200 amps, which covers most residential Level 2 EV charger installations
  • Electrical service upgrades or connections over 200 amps (e.g., for higher-capacity or multi-port commercial charging) require technical/standard review with a site plan
  • Installation must comply with the adopted 2017 National Electrical Code (with local amendments), which includes Article 625 (Electric Vehicle Power Transfer System)
  • No distinct EV charger/EVSE fee line, expedited timeline beyond the existing web-issued minor-permit path, or SolarAPP+-style platform specific to EVSE was found published by the county as of this review

Required documents

  • RequiredOnline Permit Center ApplicationElectrical (minor) permit application for EV charger/EVSE circuit and equipment installation

Fee schedule

Fee typeAmountNotes
Electrical service/panel 1-200 amps (Minor Self Service) — typical EV charger circuit$50 flatLocal Additions and Addenda Flat Rate Fees (June 2024 Summary of Fee Schedule) — same fee category documented on this jurisdiction's Electrical Permit entry; Maricopa County does not publish a distinct EV charger/EVSE fee line.
Electrical service 201-400 amps$75 total ($50 Minor Self Service base + $25 upcharge)Local Additions and Addenda Flat Rate Fees — applicable if an EV charger installation requires a service upgrade into this range.
Electrical service over 400 amps$120 total ($50 Minor Self Service base + $70 upcharge)Local Additions and Addenda Flat Rate Fees.

Sources & verification

Verified against official sources. Last reviewed 2026-06-29.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Maricopa County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →

Permalink: /arizona/maricopa-county/unincorporated-maricopa/as-of/2026-06-29/

Snapshot date: 2026-06-29

Commit: 9e5cbba

Reproducible from PermitBase’s version-controlled dataset, commit 9e5cbba.