Lake Havasu City building permits
VerifiedLake Havasu City, Arizona — as published 2026-08-01.
Verified 2026-07-06 · Source
Codes adopted
Permit types & fees
Residential Building Permit (Single-Family Dwelling / New Construction)
VerifiedRequired for new single-family dwelling and duplex construction in Lake Havasu City. Reviewed against the 2024 IRC and City local amendments (Exhibit B, Ordinance No. 25-1370), effective for submittals on/after February 1, 2026. Applications are submitted through the MaintStar Customer Self Service online portal or in person at the Development Services Department.
Verified 2026-07-06 · Source
Requirements
- Building permit required for new single-family dwelling and duplex construction within Lake Havasu City limits
- Plans must comply with the 2024 IRC and City amendments, including the replaced Climatic and Geographic Design Criteria (99 mph ultimate wind design speed / 78 mph ASD, no topographic effects; negligible weathering/frost/termite; 39°F winter design temperature) and Seismic Design Category D per ASCE 7-22 as identified in the City's 2024 Code Letter to Contractors
- Site plan required showing house location, setbacks, accessory structures, septic tank/leach line locations (if applicable), retaining/block walls, driveway location and dimensions, finish floor elevations, and utility easements
- Full plan set required per the Residential Single Family Dwelling Unit checklist: foundation plan, floor plan, typical wall cross-section, electrical plan, roof framing plan (with Arizona-registrant-sealed truss calculations, seal dated within 1 year of submittal), and a minimum of 4 exterior elevation views
- Completeness review (verifying the submittal is complete before plan review begins) takes 7-10 business days; the formal plan-review clock does not start until the submittal is verified complete
- Submittal via the MaintStar Customer Self Service online portal (h2.maintstar.co/lakehavasu/Portal) or at the Development Services Department front counter, 2330 McCulloch Blvd N
Required documents
- RequiredBuilding/Driveway/Grading/Fire/Water Meter Permit ApplicationLake Havasu City combined permit application form, submitted via the MaintStar portal or in person
- RequiredResidential Single Family Dwelling Unit Plan Requirements Checklist (rev. 01-14-2021)City of Lake Havasu City submittal checklist covering site plan, foundation plan, floor plan, wall cross-section, electrical plan, roof framing plan, and exterior elevations
- RequiredSite/Plot PlanLot dimensions, easements, setbacks, septic (if applicable), and structure locations
- RequiredTruss CalculationsStamped by an Arizona-registered design professional and licensed truss manufacturer, seal dated within 1 year of submittal
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (new single-family dwelling/duplex) — Based on Valuation | Valuation-based per the fee schedule referenced in the Uniform Building Code (standard ICC/Building Standards construction-cost valuation table); no separate City-specific flat dollar table is published | City of Lake Havasu City Master Fee Schedule (effective 02-01-2026, Rev. Show full citationHideCity of Lake Havasu City Master Fee Schedule (effective 02-01-2026, Rev. 12/10/2025), Service No. S-034, Building Permitting and Inspection Process: 'Permit fees for new buildings, additions, pools, and retaining walls are based on the valuation (total construction costs) of the buildings or structures... See Fee Schedule in Uniform Building Code' |
| Building Plan Check/Retainer Fee (deposit) | Deposit of 5% of valuation, applied toward the actual plan-check cost | City of Lake Havasu City Master Fee Schedule, Service No. S-033, Building Plan Check/Retainer Fees |
| Single Family Dwelling Plan-Review Retainer, by dwelling area | $450 (up to 1,200 sq ft); $500 (1,201-1,400 sq ft); $550 (1,401-1,600 sq ft); $650 or as determined by the Building Official (over 1,600 sq ft) | City of Lake Havasu City Building Permit Retainers/Fees handout (Development Services Department, rev. 01/03/22); retainer fees are non-refundable unless the application is withdrawn prior to commencement of plan check |
| Subsequent Standard Plan Submittal (Single Family Dwelling) | $100 | City of Lake Havasu City Building Permit Retainers/Fees handout |
| Duplex Plan-Review Retainer | $750 (all duplexes); $200 for subsequent standard plan submittal | City of Lake Havasu City Building Permit Retainers/Fees handout |
Residential Addition / Remodel / Garage / Patio Cover Permit
VerifiedRequired for room additions, remodels, garages/sheds, and patio covers/carports on existing one- and two-family dwellings in Lake Havasu City. Reviewed against the 2024 IRC as adopted and amended (Exhibit B, Ordinance No. 25-1370).
Verified 2026-07-06 · Source
Requirements
- Building permit required for room additions, remodels, garages/sheds, and patio covers/carports
- One-story detached accessory structures up to 200 sq ft do not require a permit (IRC R105.2(1) amendment), but zoning/setback rules still apply
- Residential Additions, Room Additions and Detached Structures Checklist applies; separate handouts exist for Garage/Additions, Garage/RV, Ledger Design, Outdoor Seasonal Room, and Patio (Attached Covered Patio / Patio Conversion to Living Area)
- Plans must comply with City Climatic and Geographic Design Criteria (99 mph ultimate wind design, Seismic Design Category D) and the City's Brace Wall Policy for wall bracing
Required documents
- RequiredBuilding Permit ApplicationSubmitted via the MaintStar Customer Self Service portal or in person at the Development Services Department front counter
- RequiredResidential Additions, Room Additions and Detached Structures ChecklistCity of Lake Havasu City submittal checklist for additions, room additions, and detached structures
- RequiredSite/Plot PlanShowing existing structure, addition/accessory-structure footprint, and setbacks
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Addition Plan-Review Retainer, by added dwelling area | $100 (up to 1,200 sq ft); $500 (1,201-1,400 sq ft); $550 (1,401-1,600 sq ft); $650 or as determined by the Building Official (over 1,600 sq ft); $50 for subsequent standard plan submittal | City of Lake Havasu City Building Permit Retainers/Fees handout (rev. 01/03/22) |
| Garages / Sheds Plan-Review Retainer, by area | $50 (up to 600 sq ft); $180 (601-1,000 sq ft); $270 (1,001-1,400 sq ft); $340 (over 1,400 sq ft); $75 for subsequent standard plan submittal | City of Lake Havasu City Building Permit Retainers/Fees handout |
| Patio Covers / Carports Plan-Review Retainer, by area | $60 (up to 500 sq ft); $120 (over 500 sq ft); $50 for subsequent standard plan submittal | City of Lake Havasu City Building Permit Retainers/Fees handout |
| Garage/Patio Conversion or Patio Enclosure — Miscellaneous Plan-Review Retainer | $50 | City of Lake Havasu City Building Permit Retainers/Fees handout, Miscellaneous section |
| Building Permit Fee — Based on Valuation | Valuation-based per the fee schedule referenced in the Uniform Building Code | City of Lake Havasu City Master Fee Schedule, Service No. S-034 (additions are explicitly listed as valuation-based, alongside new buildings, pools, and retaining walls) |
Electrical Permit
VerifiedRequired for electrical installation, alteration, or repair work in Lake Havasu City, governed by the 2023 National Electrical Code (NEC) as adopted and amended (Exhibit F, Ordinance No. 25-1370). All buildings are classified Residential or Commercial for code-application purposes.
Verified 2026-07-06 · Source
Requirements
- Electrical permit required for panel work, service changes, new circuits, and other hard-wired electrical work in buildings classified Residential (one- and two-family dwellings, and multi-family Types III/IV/V construction) or Commercial (all other buildings, including hotels/motels/inns) per NEC Article 90.10/100 amendment
- Governed by the 2023 NEC as adopted by Lake Havasu City; service disconnecting means must be installed outside the building at a readily accessible location nearest the point of entrance of service conductors, with specific exceptions for electrical equipment rooms in commercial/industrial buildings (2-hour fire barrier, dedicated exterior access door, lock box) per NEC 225.31/230.70(A)(1) amendments
- All services supplying one- and two-family dwellings require a surge-protection device (SPD) per NEC Section E3606.5
- GFCI protection required up to 250 volts (extended from 125 volts) and tamper-resistant receptacle requirements apply broadly across residential and specified commercial/institutional occupancies
- Apply via the MaintStar Customer Self Service online portal or Development Services Department front counter
Required documents
- RequiredBuilding/Electrical Permit ApplicationSubmitted via the MaintStar CSS portal or in person
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit — Based on Valuation / Fee Schedule | Valuation-based or per applicable flat retainer, consistent with the City's Uniform Building Code fee-schedule reference (Master Fee Schedule, Service Nos. S-033/S-034) | No dedicated, separately itemized electrical-only flat fee table was found published on lhcaz.gov distinct from the general building valuation fee structure; Show full citationHideNo dedicated, separately itemized electrical-only flat fee table was found published on lhcaz.gov distinct from the general building valuation fee structure; electrical work performed as part of a larger permitted project (e.g., new dwelling, addition) is covered under that project's valuation-based building permit fee. A stand-alone electrical-only permit (e.g., panel upgrade) is billed via the same Development Services fee structure referenced in Service No. S-034. |
Plumbing Permit
VerifiedRequired for plumbing installation, alteration, or repair work in Lake Havasu City, governed by the 2024 International Plumbing Code (IPC) as adopted and amended (Exhibit E, Ordinance No. 25-1370).
Verified 2026-07-06 · Source
Requirements
- Plumbing permit required for installation, alteration, or repair of plumbing systems, fixtures, water heaters, and building sewers
- Governed by the 2024 IPC as adopted by Lake Havasu City; building sewers must be tested by plugging the sewer at its connection points and filling with water to a minimum 10-foot head (IPC 312.7 amendment)
- Replacement of an existing water heater that does not change location, increase ampacity, or convert to fuel gas is exempt from a permit (IRC R105.2 Plumbing(3) amendment) — any water heater replacement that does change these factors requires a permit
- Backwater valves must be flapper type complying with ASME A112.14.1, CSA B181.1, or CSA B181.2 (IPC 714.2 amendment)
- Apply via the MaintStar Customer Self Service online portal or Development Services Department front counter
Required documents
- RequiredBuilding/Plumbing Permit ApplicationSubmitted via the MaintStar CSS portal or in person
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing Permit — Based on Valuation / Fee Schedule | Valuation-based or per applicable flat retainer, consistent with the City's Uniform Building Code fee-schedule reference (Master Fee Schedule, Service Nos. S-033/S-034) | No dedicated, separately itemized plumbing-only flat fee table (e.g., a specific per-water-heater dollar figure) was found published on lhcaz.gov; Show full citationHideNo dedicated, separately itemized plumbing-only flat fee table (e.g., a specific per-water-heater dollar figure) was found published on lhcaz.gov; plumbing work is billed via the same Development Services fee structure referenced in Service No. S-034, or is exempt from permitting entirely for like-for-like water heater replacement per the IRC R105.2 Plumbing(3) amendment. |
Mechanical / HVAC Permit
VerifiedRequired for heating, ventilation, and air conditioning installations in Lake Havasu City, governed by the 2024 International Mechanical Code (IMC) as adopted and amended (Exhibit C, Ordinance No. 25-1370).
Verified 2026-07-06 · Source
Requirements
- Mechanical permit required for installation, replacement, or relocation of HVAC equipment and ventilation systems
- Governed by the 2024 IMC as adopted by Lake Havasu City
- Replacement of an existing HVAC unit that does not increase unit size, capacity, location, or ampacity is exempt from a permit (IRC R105.2 Mechanical(9) amendment) — any replacement that increases these factors requires a permit
- Equipment/appliances on roofs or elevated structures require a roof-hatch ladder with a compliant top landing (IMC 306.5 amendment, new in the 2024 cycle)
- Apply via the MaintStar Customer Self Service online portal or Development Services Department front counter
Required documents
- RequiredBuilding/Mechanical Permit ApplicationSubmitted via the MaintStar CSS portal or in person
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical/HVAC Permit — Based on Valuation / Fee Schedule | Valuation-based or per applicable flat retainer, consistent with the City's Uniform Building Code fee-schedule reference (Master Fee Schedule, Service Nos. S-033/S-034) | No dedicated, separately itemized flat AC/HVAC-unit-replacement fee (of the kind some other Arizona cities publish) was found on lhcaz.gov; Show full citationHideNo dedicated, separately itemized flat AC/HVAC-unit-replacement fee (of the kind some other Arizona cities publish) was found on lhcaz.gov; mechanical work is billed via the same Development Services fee structure referenced in Service No. S-034, or is exempt entirely for a qualifying like-for-like HVAC unit replacement per the IRC R105.2 Mechanical(9) amendment. |
Re-Roofing Permit
VerifiedRequired for residential and commercial re-roofing in Lake Havasu City when not covered by the City's percentage-based in-kind-reroof exemption. Governed by the 2024 IRC/IBC roofing provisions as locally amended.
Verified 2026-07-06 · Source
Requirements
- Building permit required for re-roofing except the narrow exemption: in-kind reroofing where the roof sheathing removed and replaced does not exceed 25% of the total roof area (IRC R105.2(11) amendment) — a percentage-of-sheathing-area test, not a material-match test
- Roof sheathing fastening must comply with the amended Table 602.3(1), which the City's 2024 Code Letter to Contractors flags as a new requirement: roof sheathing must be fastened 6 inches on-center at intermediate supports
- Re-roofs exceeding the 25% in-kind threshold, or involving a material/system change, require a full building permit and plan submittal
Required documents
- RequiredBuilding Permit Application (Re-Roofing)Submitted via the MaintStar CSS portal or in person
- RequiredRoof plan/material listingExisting framing, square footage, existing/proposed material and weight, sheathing fastening schedule, flashing, underlayment, and roof slope classification
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Re-Roofing Permit — Based on Valuation / Fee Schedule | Valuation-based, consistent with the City's Uniform Building Code fee-schedule reference (Master Fee Schedule, Service Nos. S-033/S-034) | No dedicated, separately itemized flat re-roofing fee was found published on lhcaz.gov distinct from the general building valuation fee structure referenced in Service No. Show full citationHideNo dedicated, separately itemized flat re-roofing fee was found published on lhcaz.gov distinct from the general building valuation fee structure referenced in Service No. S-034; a qualifying in-kind reroof at or under the 25%-of-sheathing-area threshold is exempt from permitting entirely. |
Residential Solar Photovoltaic (PV) Permit
VerifiedRequired for installation of rooftop residential solar photovoltaic systems in Lake Havasu City. Governed by the City's dedicated PV Utility-Interactive Systems Plan Submittal Checklist (rev. 05-04-2022) and the 2023 NEC as adopted and amended (Exhibit F, Ordinance No. 25-1370).
Verified 2026-07-06 · Source
Requirements
- Photovoltaic disconnecting means must be installed at a readily accessible location outside the building or structure, nearest the point of entrance of the system conductors (NEC 690.13(A)(1) amendment)
- Roof plan showing panel locations and existing roof height required (most zoning classifications cap roof-mounted additions at 15 ft max height)
- Structural calculations and drawings sealed by an Arizona-licensed engineer required, showing connection of pre-manufactured module frames to the existing roof structure
- Manufacturer specifications required for modules (short-circuit current Isc, open-circuit voltage Voc, maximum power Pmax) and inverter (maximum AC power output, disconnect info, ground-fault protection device)
- Complete wiring diagram required: number of modules/strings, conductor/conduit sizing at each stage (string to combiner, combiner to inverter, inverter to back-feed breaker), DC system grounding per NEC 250.166 and 690.47(c), and location of main service/inverter/PV output meter
- A Unisource Electric Letter of Approval is required at time of permit submittal
- Electrical load calculations for the dwelling are required when de-rating the main service panel
Required documents
- RequiredPV Utility-Interactive Systems Plan Submittal Checklist (rev. 05-04-2022)City of Lake Havasu City checklist covering mounting, module/inverter specifications, wiring diagram, and general sizing requirements
- RequiredPV System (Solar) Plan Submittal RequirementsAdditional City reference document for PV plan submittals
- RequiredUnisource Electric Letter of ApprovalRequired at time of permit submittal
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Photovoltaic System Permit — Based on Valuation / Fee Schedule | Valuation-based, consistent with the City's Uniform Building Code fee-schedule reference (Master Fee Schedule, Service Nos. S-033/S-034) | No dedicated, separately itemized flat PV permit fee (distinct from the general building valuation structure) was found published on lhcaz.gov; PV permits are billed via the same Development Services fee structure referenced in Service No. S-034. |
Demolition Permit
VerifiedRequired for demolition of any residential or commercial structure in Lake Havasu City, billed as a flat miscellaneous permit fee (with surcharge) under the City's Building Permit Retainers/Fees schedule.
Verified 2026-07-06 · Source
Requirements
- Building permit required before demolishing a residential or commercial structure within Lake Havasu City limits
- Owner authorization and site information required identifying the structure(s) to be demolished
- All utilities must be terminated/capped before demolition
- Asbestos survey/ADEQ notification (Arizona Department of Environmental Quality Asbestos Form) required prior to demolition where applicable — Lake Havasu City's Building Division publishes an 'ADEQ Asbestos Form' as part of its standard forms library
- Project is not legally complete until an approved final inspection has occurred
Required documents
- RequiredBuilding Permit Application (Demolition)Submitted via the MaintStar CSS portal or in person
- RequiredADEQ Asbestos FormArizona Department of Environmental Quality asbestos notification form, published in the City's Building Division forms library
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition Permit (flat fee, includes 1.25% surcharge) | $75.94 | City of Lake Havasu City Building Permit Retainers/Fees handout (Development Services Department, rev. 01/03/22), Miscellaneous section, marked with a 1.25% surcharge asterisk |
EV Charger / EVSE Permit
Electric vehicle charging equipment (EVSE) installation in Lake Havasu City is permitted as an electrical permit under the 2023 NEC as adopted and locally amended (Exhibit F, Ordinance No. 25-1370) — the City has no dedicated EVSE checklist or application analogous to its PV Utility-Interactive Systems Plan Submittal Checklist for solar. No separately itemized EV-charger/EVSE flat fee is published; billing follows the same valuation-based Development Services fee structure (Master Fee Schedule Service Nos. S-033/S-034) used for the City's general Electrical Permit.
Reviewed 2026-07-20 · Source
Requirements
- Electrical permit required for EVSE/EV charger circuit installation, alteration, or repair, per the 2023 NEC as adopted and amended by the City
- Governed by NEC Article 625 (Electric Vehicle Power Transfer System) as incorporated through the City's 2023 NEC adoption; buildings are classified Residential or Commercial per the City's NEC Article 90.10/100 amendment for code-application purposes
- No dedicated EVSE plan-submittal checklist is published by the City (unlike the dedicated PV Utility-Interactive Systems checklist for solar) — submit via the standard Building/Electrical Permit Application
- A licensed Arizona electrical contractor is required unless the work qualifies for an owner-builder exemption on a personal owner-occupied residence
Required documents
- RequiredBuilding/Electrical Permit ApplicationStandard City application used for electrical work, including EVSE circuit installation; no EVSE-specific form is published
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| EV Charger / EVSE Permit — Based on Valuation / Fee Schedule | Valuation-based or per applicable flat retainer, consistent with the City's Uniform Building Code fee-schedule reference (Master Fee Schedule, Service Nos. S-033/S-034) | No dedicated, separately itemized EV charger fee distinct from the general building valuation structure is published on lhcaz.gov. Show full citationHideNo dedicated, separately itemized EV charger fee distinct from the general building valuation structure is published on lhcaz.gov. EVSE work performed as part of a larger permitted project, such as a new dwelling or addition, is covered under that project's valuation-based building permit fee, and a stand-alone EVSE-only permit is billed via the same Development Services fee structure referenced in Service No. S-034, as with the general Electrical Permit. In the current Master Fee Schedule, effective 02-01-2026, Service No. S-033 (Building Plan Check/Retainer Fees) and S-034 (Building Permitting and Inspection Process) both read '100% / See Fee Schedule in Uniform Building Code' with no dollar figure embedded, the City's own Master Fee Schedule PDF link is currently broken, and no standalone UBC valuation table is published separately. This is a genuinely valuation-dependent fee — no single number governs, so ask for a project-specific estimate. |
Residential Pool and Spa Permit
VerifiedRequired for construction of residential swimming pools and spas 18 inches or greater in depth in Lake Havasu City. Governed by the City's Requirements for Residential Pool and Spa Submittal (rev. 01-14-2021) and the amended IBC/IRC pool provisions.
Verified 2026-07-06 · Source
Requirements
- A swimming pool, spa, or other contained body of water 18 inches or greater in depth requires a building permit; those under 18 inches are exempt (IRC R105.2(7) / IBC 105.2(9) amendment)
- Site plan required showing lot shape, property lines, easements, pool/spa location, width and depth, and estimated project value; Mohave County Health Department approval required if applicable
- Setback rules: pool/spa must be set back from a building footing a distance equal to the pool's depth (or engineered for footing surcharge if closer); minimum 10 ft horizontal separation from overhead electrical service, 5 ft from underground service; minimum 10 ft from the outside face of a retaining wall supporting fill (or engineered self-supporting design if closer); pools within 7 ft of the top of a slope must be engineered self-supporting
- Structural reinforcing steel bonding required for pool/spa/hot tub shells per NEC 680.26(B)(2) amendment (24 in. o.c. each way, connected at four equal points along the perimeter for conductive shells)
- If a gas heater is installed, plans must specify heater BTU rating and gas line size/length from meter to heater (propane gas lines permitted by the Fire Marshal's office)
Required documents
- RequiredRequirements for Residential Pool and Spa Submittal (rev. 01-14-2021)City of Lake Havasu City checklist for site plan and design requirements
- RequiredPool Enclosure PamphletCity reference document on pool barrier/enclosure requirements
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Swimming Pool (with or without Spa) — Miscellaneous Plan-Review Retainer (flat fee) | $50.00 | City of Lake Havasu City Building Permit Retainers/Fees handout (rev. 01/03/22), Miscellaneous section |
| Building Permit Fee — Based on Valuation | Valuation-based per the fee schedule referenced in the Uniform Building Code | City of Lake Havasu City Master Fee Schedule, Service No. S-034 (pools explicitly listed alongside new buildings, additions, and retaining walls as valuation-based) |
Commercial Building Permit (New Construction / Multi-Family)
VerifiedRequired for new commercial structures and new multi-family residential projects in Lake Havasu City. Reviewed under the City's unified 'New Commercial Structures, Tenant Improvements, and Multi-Family Projects' development-review process, using the current commercial code suite (2024 IBC/IMC/IPC/IFGC/IFC, 2023 NEC, ANSI A117.1-2017, 2010 ADA) as adopted and locally amended. See the separate Commercial Tenant Improvement (TI) Permit entry for the City's distinct, faster TI review track.
Verified 2026-08-01 · Source
Requirements
- Building permit required for new commercial structures and new multi-family residential projects within Lake Havasu City limits, processed through the City's Development Review / Permit Process for 'New Commercial Structures, Tenant Improvements, and Multi-Family Projects'
- Step 1 - Pre-Application Meeting: applicant submits a Pre-Application - Commercial & Multi-Family form plus a conceptual site plan; City staff schedule a meeting where the project owner, architect, and contractor meet with the Development Review Committee (one representative each from Planning, Building, Engineering, Fire Prevention, and Stormwater Management) to discuss design review requirements, Building Division requirements, off-site improvements, utility connections, and Fire Department requirements; staff issue the discipline-specific submittal checklists at this meeting
- Step 2 - Completeness Verification: plan review does not begin until City staff verify the submittal package is complete against the checklists issued at the pre-application meeting; incomplete packages are returned to the applicant; once complete, the applicant pays the planning and building review fees and plan review begins
- Step 3 - Plan Review: construction plans are reviewed concurrently by Planning, Building, Engineering, Fire Prevention, and Stormwater Management for code compliance; all review comments are provided to the applicant together with the redlined plans
- Step 4 - Corrections: the applicant is responsible for responding to all comments and required corrections; the review process may repeat as many times as necessary for the applicant to address code requirements
- Step 5 - Permit Issuance: requires payment of all permit and plan-check fees, any off-site improvement guarantees, and Mohave County Health Department approval when required (food establishments; public/semi-public pools or spas, including those in an apartment/condominium/townhouse/motel/hotel and any residential housing unit with 4 or more units; pet shops/kennels/grooming establishments except veterinary clinics; public accommodations such as hotels/motels/inns; RV parks, mobile home parks, campgrounds; and school buildings). No permit is issued until the general contractor's City business license number and State contractor's license number are on file, and, for projects with an estimated value over $50,000, an Arizona Department of Revenue bond exemption certificate has been provided
- Registrant requirement: every plan sheet must be stamped by an Arizona registrant, except projects exempt under A.R.S. § 32-144
- Current commercial code suite: 2024 IBC, 2024 IMC, 2023 NEC, 2024 IPC, 2024 IFGC, 2024 IFC, ANSI A117.1-2017, and the 2010 ADA Standards, plus Lake Havasu City local amendments; automatic fire sprinklers are required on ALL multi-family and commercial occupancies -- a stricter rule than the City's residential track, where the base IRC automatic-sprinkler section (R309) is deleted by City amendment
- Design parameters per the Building Division's Plan Acceptance Criteria: wind design by IBC Table 1604.5 Risk Category -- 93 mph (Risk Category I), 99 mph (Risk Category II), 106 mph (Risk Category III), 110 mph (Risk Category IV); wind exposure B or C as determined by the project engineer; design rainfall 1.5 inches/hour; seismic zone calculated by the project engineer (no single fixed seismic design category is pre-published for commercial, unlike the City's residential Seismic Design Category D)
Required documents
- RequiredPre-Application - Commercial & Multi-FamilyCity of Lake Havasu City form (Rev. 01/07/2021) submitted with a conceptual 8.5x11 site plan (property dimensions, building location(s), parking, driveways, landscape/screen walls) to initiate the mandatory pre-application conference at City Hall, 2330 McCulloch Blvd N
- RequiredPermit and Zoning Clearance ApplicationCity of Lake Havasu City Development Services Department / Building Division combined Building Permit / Utility Service / Off-Site Improvement / Fire Permit application (Rev. 08/05/2025); captures owner/applicant/architect/general contractor contacts, license numbers, and estimated valuation used to calculate the plan-check and building fees
- RequiredPlan Acceptance Criteria - Building (New Construction)City checklist (Rev. 02-09-2026) that must be attached to the Building submittal: title sheet, site plan, site accessible route plan (IBC 1104 / ADA 206), civil drawings, survey, grading plans, means of egress plan (IBC 107.2.3 / Ch. 10), floor/foundation/roof-framing plans, architectural elevations, cross-sections, structural details, plumbing and mechanical plans, full-size manufacturer stock sheets for Type 1/2 kitchen exhaust systems, electrical plan, ADA specifications sheet, two sealed sets of truss calculations, two sealed sets of structural calculations, an addressing plan, and a soils report or design to 1,500 psf
- RequiredPlan Acceptance Criteria - Planning (New Construction)City checklist (Rev. 03-15-2023) covering formal design review determination and required site/landscape/elevation/addressing/grading plan sets for Planning Division review
- RequiredPlan Acceptance Criteria - Engineering (New Construction)City checklist covering right-of-way improvement plans, sealed engineer cost estimates, water/sewer/fire-line site plans, plumbing fixture-unit plans, and an industrial waste questionnaire, plus conditional items (water/sewer capacity study, traffic impact study, offsite improvement agreement, grease interceptor, drainage study) when checked as applicable
- RequiredPlan Acceptance Criteria - Fire (New Construction)City checklist (Rev. 02-09-2026) covering building plans, fire line/underground supply plans, fire sprinkler plans with hydraulic calculations, fire alarm/monitor plans, and fire suppression/hood/SPL system plans; sprinkler plans require a minimum NICET III or Fire Protection Engineer stamp (13D systems may be designed by a non-registrant); hazardous-materials disclosure and MSDS sheets required when applicable
- RequiredPlan Acceptance Criteria - Stormwater (New Development)City checklist requiring civil engineered drainage design and calculations retaining 100% of the 100-year, 2-hour storm event onsite (Low Impact Development and Green Infrastructure required), a drainage study, percolation test, ADEQ Notice of Intent/SWPPP where disturbance is one acre or more, sediment erosion control plan, building drainage plans, a facilities maintenance agreement, and post-construction BMP O&M/SOPs
- OptionalMohave County Health Department Notification FormCity form requiring the applicant to certify whether the project WILL or WILL NOT require Mohave County Department of Health, Environmental Health Division approval (food establishments, public/semi-public pools/spas, pet shops/kennels/grooming except vet clinics, public accommodations, RV/mobile home parks, school buildings); building permits cannot be issued until Health Department approval is obtained where required
- OptionalArizona Department of Revenue Bond Exemption CertificateRequired prior to permit issuance only for projects with an estimated project value over $50,000, per the Building Division's Plan Acceptance Criteria checklist
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Based on Valuation | Valuation-based per the fee schedule referenced in the Uniform Building Code (standard ICC/Building Standards construction-cost valuation table); no separate City-specific flat dollar table is published | City of Lake Havasu City Master Fee Schedule (effective 02-01-2026), Service No. S-034, Building Permitting and Inspection Process -- the same valuation-based mechanism used for new buildings, additions, and pools applies to commercial/multi-family new construction |
| Building Plan Check/Retainer Fee (deposit) | Deposit of 5% of valuation, applied toward the actual plan-check cost | City of Lake Havasu City Master Fee Schedule, Service No. S-033, Building Plan Check/Retainer Fees |
Commercial Tenant Improvement (TI) Permit
VerifiedRequired for build-out or renovation of an existing commercial tenant space in Lake Havasu City. Uses the SAME 'New Commercial Structures, Tenant Improvements, and Multi-Family Projects' development-review process and the same five discipline plan-acceptance checklists as new commercial construction (checking 'Tenant Improvement' instead of 'New Construction'), but the City's own published plan-review timeframes process Tenant Improvements on a distinct, faster 25-business-day track (vs. 35 business days for new Multi-Family and Commercial construction), and the Stormwater checklist substitutes a materially lighter requirements set for TI projects with no land disturbance.
Verified 2026-08-01 · Source
Requirements
- Same 5-step Development Review / Permit Process as new commercial construction (Pre-Application Meeting, Completeness Verification, concurrent Plan Review by Planning/Building/Engineering/Fire/Stormwater, Corrections, Permit Issuance) -- there is no separate, stand-alone TI process or TI-specific application form; the applicant checks 'Tenant Improvement' rather than 'New Construction' on each discipline's Plan Acceptance Criteria checklist
- The Pre-Application - Commercial & Multi-Family form's Site Specifics section captures 'Tenant Space Sq. Ft.' as a distinct field from 'Total Building Sq. Ft.', 'Proposed use', and 'Prior use'
- Where the TI scope involves NO land disturbance, the Stormwater Plan Acceptance Criteria substitutes a dedicated, lighter requirements set in place of the full New Development stormwater package: a Solid Waste Management Plan (trash/debris/construction material management/storage), Storm Drain Inlet Protection (streets, alleys, parking lots, drainage grates, washes), a Spill Response Plan & Emergency Contact Information (oils, grease, fuels, chemicals), and a Slurry Containment plan (cement, tile/stone cutting, stucco, plaster, paint washout containment)
- Automatic fire sprinklers are required on all commercial occupancies, including TI scope; sprinkler and fire-alarm plans require a minimum NICET III (or Fire Protection Engineer) stamp, except a 13D system, which may be designed by a non-registrant
- Mohave County Health Department approval is required if the tenant's proposed use trips a Health-regulated category (food establishment; public/semi-public pool or spa; pet shop/kennel/grooming except veterinary clinics; public accommodation; RV/mobile home park; school building)
- Registrant requirement: every plan sheet must be stamped by an Arizona registrant, except projects exempt under A.R.S. § 32-144
- No permit is issued until the general contractor's City business license number and State contractor's license number are on file
Required documents
- RequiredPre-Application - Commercial & Multi-FamilySame City form (Rev. 01/07/2021) used for new commercial construction; captures Tenant Space Sq. Ft. as a distinct field for TI projects
- RequiredPermit and Zoning Clearance ApplicationSame combined Building Permit / Utility Service / Off-Site Improvement / Fire Permit application (Rev. 08/05/2025) used for new commercial construction
- RequiredPlan Acceptance Criteria - Building (Tenant Improvement)Same Building checklist as new construction (Rev. 02-09-2026), with the 'Tenant Improvement' box checked; items not applicable to the tenant scope (e.g., grading plans, survey) are marked not required by the reviewer
- RequiredPlan Acceptance Criteria - Planning (Tenant Improvement)Same Planning checklist as new construction, with the 'Tenant Improvement' box checked
- RequiredPlan Acceptance Criteria - Fire (Tenant Improvement)Same Fire checklist as new construction, with the 'Tenant Improvement' box checked; covers fire sprinkler/alarm modification plans where the TI scope relocates or adds devices
- RequiredPlan Acceptance Criteria - Stormwater (Tenant Improvements with No Land Disturbance)Distinct, lighter Stormwater requirements set specifically for TI projects with no land disturbance: Solid Waste Management Plan, Storm Drain Inlet Protection, Spill Response Plan & Emergency Contact Information, and Slurry Containment plan (cement, tile/stone cutting, stucco, plaster, paint washout)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Based on Valuation | Valuation-based per the fee schedule referenced in the Uniform Building Code; the same mechanism applies whether the project is new commercial construction or a tenant improvement | City of Lake Havasu City Master Fee Schedule (effective 02-01-2026), Service No. S-034, Building Permitting and Inspection Process |
| Building Plan Check/Retainer Fee (deposit) | Deposit of 5% of valuation, applied toward the actual plan-check cost | City of Lake Havasu City Master Fee Schedule, Service No. S-033, Building Plan Check/Retainer Fees |
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fee schedules
Applications & forms
Checklists & handouts
Online permit portal
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lake Havasu City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.