Pinetop-Lakeside building permits

Verified

Pinetop-Lakeside, Arizona — as published 2026-07-07.

Verified 2026-07-07 · Source

Codes adopted

Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Sections 9-462.01 and 9-463 et seq.). The Town of Pinetop-Lakeside independently adopts and administers its own Building Code (Town Code Chapter 15.04) through its Building & Safety Department (part of the Community Development Department); it does not defer permitting to Navajo County. Source: Pinetop-Lakeside Town Code Section 15.04.010/15.04.020.2024 International Building Code (IBC), together with its supplements, if any, published by the International Code Council, adopted by reference (Town Code Section 15.04.020(B)). Source: Pinetop-Lakeside Town Code Section 15.04.020, current through Ord. 25-481.2024 International Residential Code (IRC), together with its supplements, if any, published by the International Code Council, adopted by reference (Town Code Section 15.04.020(B)). Source: Pinetop-Lakeside Town Code Section 15.04.020.2024 International Mechanical Code (IMC), together with its supplements, if any, published by the International Code Council, adopted by reference (Town Code Section 15.04.020(B)). Source: Pinetop-Lakeside Town Code Section 15.04.020.2024 International Plumbing Code (IPC), together with its supplements, if any, published by the International Code Council, adopted by reference (Town Code Section 15.04.020(B)). Source: Pinetop-Lakeside Town Code Section 15.04.020.2023 National Electrical Code (NEC), together with its supplements, if any, published by the National Fire Protection Association, adopted by reference (Town Code Section 15.04.020(B)) — one edition behind the 2024 ICC family set; the Town Code specifically notes new NEC editions may be adopted from time to time by Town Council resolution. Source: Pinetop-Lakeside Town Code Section 15.04.020.The Town's own live Building Permits web page (pinetoplakesideaz.gov/173/Building-Permits) independently confirms: 'The Town of Pinetop/Lakeside has adopted the 2024 editions of the International Building Codes with the 2023 edition of the National Electrical Code' — consistent with the Municipal Code text. Source: Building Permits | Pinetop-Lakeside, AZ.No standalone International Fuel Gas Code (IFGC), International Fire Code (IFC), International Existing Building Code (IEBC), or International Energy Conservation Code (IECC) adoption citation was found in Town Code Chapter 15.04 (Building Code) or on the Town's Building Permits page as of this research; the Town's own Gas Permit (Town Fee Schedule) is administered under the Building & Safety Department's general permitting authority (Town Code Section 15.04.020 references 'addenda and additions...as apply to the Town'), but no separately cited fuel-gas-code edition was located. Fire-related plan review for multi-family, industrial, and commercial buildings is expressly routed to the applicable Fire District for stamped approval prior to Town permit issuance (Town Code Section 15.04.150), rather than the Town administering its own separately-cited Fire Code chapter. Source: Pinetop-Lakeside Town Code Chapter 15.04 (full chapter reviewed; no IFGC/IFC/IEBC/IECC section found).ADA/Accessibility: Arizonans with Disabilities Act standards and implementing rules (A.R.S. Title 41, Chapter 9, Article 8), including the 'Americans with Disabilities Act Accessibility Guidelines for Buildings and Facilities,' declared a public record by Town Resolution No. 96-426, are adopted and incorporated as an amendment to the International Building Code for both public entities and public accommodations/commercial facilities, applying to new construction and alterations commenced after September 3, 1996. Source: Pinetop-Lakeside Town Code Section 15.04.320 (Addendum and Additions).Manufactured/mobile/modular homes: regulated jointly by the State of Arizona (Arizona Department of Building and Fire Safety, Office of Manufactured Housing) for HUD compliance and installation standards, and by the Town for placement/location permits. As of April 16, 1995, the Building Official may not issue a building/location permit for a mobile/manufactured home unless it bears a HUD compliance decal dated no earlier than June 15, 1976 (or successor HUD standard) and complies with Arizona Department of Building and Fire Safety installation standards (ground-level installation, fully-skirted installation, or installation on a permanent visible foundation). Source: Pinetop-Lakeside Town Code Section 15.04.220 (Mobile and Manufactured Homes).Fire District plan review: all plans and specifications for multi-family dwellings, industrial and commercial buildings (or alterations/additions/conversions thereto) requiring a Town building permit must first be submitted to and stamped approved by the respective Fire District before the Town's Planning and Zoning Department will issue the permit; the Town reserves the right to issue a permit without prior Fire District approval subject to Town Attorney review and Town Council approval. Source: Pinetop-Lakeside Town Code Section 15.04.150.

Permit types & fees

Residential Building Permit (New Construction / Addition / Remodel)

Verified

Required for new single-family residential construction, additions, and remodels within the Town of Pinetop-Lakeside. Reviewed against the 2024 IBC/IRC and Town of Pinetop-Lakeside amendments (Town Code Chapter 15.04). Applications are submitted via the online Civic Review portal (preferred), in person at Town Offices, or by mail.

Verified 2026-07-07 · Source

Requirements

  • Building permit required for new residential construction, additions, and remodels within Town limits, except for the narrow Town Code Section 15.04.130 exemptions (fences/walls, curbs/retaining/planter walls, accessory buildings up to 145 sq ft not used for human occupancy, roof-mounted antennas, and like-for-like maintenance repairs)
  • Two (2) copies of plans and specifications required with every building permit application, including a site or plot plan; one approved copy is returned to the owner (Town Code Section 15.04.140)
  • Approval from the Sanitary District (sewer hook-up) or a Navajo County Health Department permit (septic tank) required as applicable
  • Contractor's statement of Arizona Registrar of Contractors license required
  • Tree Plan required per Town Code Section 17.96.010
  • Projects over $75,000 in valuation require a licensed engineer's or architect's seal on plans; projects $50,000 and over require contractor bonding
  • Undeveloped sites may require a culvert inspection
  • Multi-family, industrial, and commercial buildings (or alterations/additions/conversions) must have plans stamped approved by the applicable Fire District before the Town issues a building permit (Town Code Section 15.04.150)
  • A single blanket building permit is issued per construction project; a nonrefundable Plan Check Fee is charged at plan submittal (Town Code Section 15.04.190)
  • Submit via the online Civic Review portal (app.civicreview.com), in person at Town Offices (325 W White Mountain Boulevard), or by mail to the Community Development Department

Required documents

  • RequiredBuilding Permit ApplicationTown of Pinetop-Lakeside Building Permit Application, submitted through the online Civic Review portal (app.civicreview.com/application/5cae3eb9a45b68001b84f3ec) or in person/by mail at Town Offices
  • RequiredSite/Plot PlanScaled drawing showing lot dimensions and all existing/proposed structures, distances to property lines and between structures, north arrow, street name/address, legal description, water/gas/electric/sewer locations, easements, and topography (contour lines or spot grades). Per the Town's own FAQ definition of a site/plot plan.
  • RequiredConstruction Drawings and Specifications (2 copies)Two sets of plans and specifications per Town Code Section 15.04.140; complex projects (e.g., requiring engineering computations, public buildings) must be prepared by an Arizona-licensed engineer or architect at the Building Official's discretion
  • RequiredSanitary District Approval or County Health Department Septic PermitRequired where a sewer hook-up or septic tank is involved
  • RequiredContractor's Statement of LicenseConfirms the contractor holds a valid Arizona Registrar of Contractors license
  • RequiredTree PlanRequired per Town Code Section 17.96.010
  • OptionalFire District Stamped Plan ApprovalRequired before Town permit issuance for multi-family, industrial, and commercial buildings or qualifying alterations/additions/conversions (Town Code Section 15.04.150)

Fee schedule

Fee typeAmountNotes
Building Permit FeeBased on the Most Current International Code Council Building Valuation Data (published bi-annually), by Type of Construction, per ICC Building Fee Schedule Appendix L; calculated to the nearest $1,000 of valuationTown of Pinetop-Lakeside FY2026-2027 Consolidated Fee Schedule (Resolution 26-1815, approved June 4, 2026, effective July 4, 2026), Planning and Development section; Town Code Section 15.04.190/15.04.210
Plan Check Fee30% of the building permit fee (commercial plans reviewed by an outside consulting firm may be billed up to the Town's actual reimbursement cost instead)FY2026-2027 Consolidated Fee Schedule; nonrefundable per Town Code Section 15.04.190
Not Obtaining a Permit (surcharge)50% of the building permit feeFY2026-2027 Consolidated Fee Schedule
Re-inspection Fee$30.00FY2026-2027 Consolidated Fee Schedule (unchanged from FY2025-2026 base)
Revised Commercial Building Plans30% of the original building permit feeFY2026-2027 Consolidated Fee Schedule
Building Permit Transfer Fee$5.00FY2026-2027 Consolidated Fee Schedule
Building Permit Cancellation Fee25% of the original building permit feeFY2026-2027 Consolidated Fee Schedule
Permit Renewal (expired less than 1 year, no changes)50% of the original permit feePer the Town's own FAQ: 'How do I renew my permit? How much does it cost?'
Permit Renewal (expired more than 1 year)100% of the original permit fee (full fee)Per the Town's own FAQ: 'How do I renew my permit? How much does it cost?'

Electrical Permit

Verified

Required for electrical installation, alteration, or repair work in the Town of Pinetop-Lakeside, governed by the 2023 National Electrical Code (NEC) as adopted by the Town (Town Code Chapter 15.04). Flat-fee permit administered by the Building & Safety Department.

Verified 2026-07-07 · Source

Requirements

  • Electrical permit required for electrical installation, alteration, or repair work within Town limits, subject to the same Town Code Section 15.04.130 exemptions (e.g., like-for-like maintenance repairs not involving fixtures/equipment modification)
  • Governed by the 2023 NEC as adopted by the Town of Pinetop-Lakeside (Town Code Section 15.04.020(B))
  • Submit via the online Civic Review portal, in person at Town Offices, or by mail to the Community Development Department

Required documents

  • RequiredBuilding/Electrical Permit ApplicationSubmitted through the Civic Review online portal or in person/by mail at Town Offices, 325 W White Mountain Boulevard, Lakeside, AZ 85929

Fee schedule

Fee typeAmountNotes
Electrical Permit$40.00Town of Pinetop-Lakeside FY2026-2027 Consolidated Fee Schedule (Resolution 26-1815, effective July 4, 2026), Planning and Development section; increased from $30.00 in the FY2022-2023 schedule
Re-inspection Fee (if applicable)$30.00FY2026-2027 Consolidated Fee Schedule

Gas Permit

Verified

Required for gas piping and gas appliance installation, alteration, or repair work in the Town of Pinetop-Lakeside. Flat-fee permit administered by the Building & Safety Department.

Verified 2026-07-07 · Source

Requirements

  • Gas permit required for gas piping and gas-fired appliance installation, alteration, or repair within Town limits
  • Submit via the online Civic Review portal, in person at Town Offices, or by mail to the Community Development Department

Required documents

  • RequiredBuilding/Gas Permit ApplicationSubmitted through the Civic Review online portal or in person/by mail at Town Offices, 325 W White Mountain Boulevard, Lakeside, AZ 85929

Fee schedule

Fee typeAmountNotes
Gas Permit$40.00Town of Pinetop-Lakeside FY2026-2027 Consolidated Fee Schedule (Resolution 26-1815, effective July 4, 2026), Planning and Development section; increased from $25.00 in the FY2022-2023 schedule
Re-inspection Fee (if applicable)$30.00FY2026-2027 Consolidated Fee Schedule

Manufactured, Mobile, or Modular Home Placement Permit

Verified

Required for placement of a manufactured, mobile, or modular home within the Town of Pinetop-Lakeside. Governed by Town Code Section 15.04.220, requiring HUD compliance and Arizona Department of Building and Fire Safety installation-standard compliance in addition to the Town's own placement permit.

Verified 2026-07-07 · Source

Requirements

  • Mobile/manufactured home proposed for installation must bear a decal certifying HUD compliance dated no earlier than June 15, 1976 (or successor HUD standard)
  • As of April 16, 1995, the Building Official shall not issue a building/location permit for a mobile/manufactured home unless it is proven to comply with the HUD-decal standard; this also applies to relocation of any mobile/manufactured home unit within the Town
  • Applicant must demonstrate compliance to the Building Official
  • Must be installed per Arizona Department of Building and Fire Safety, Office of Manufactured Housing standards: ground-level installation, installation of a fully-skirted unit, or installation on a permanent visible foundation
  • A separate 'Foundation only permit' is available if only the foundation is being permitted at that stage
  • Zoning: only permitted in Town neighborhoods zoned MH-4 (10,000 sq ft/unit), MH-6 (6,600 sq ft/unit), or MHP (manufactured home park, seasonal or permanent); only Class A manufactured homes (minimum 24 ft width, minimum 40 ft length, foundation wall) are allowed
  • Fees calculated to the nearest $1,000 of valuation (Town Code Section 15.04.220(F))

Required documents

  • RequiredManufactured/Mobile/Modular Home Placement Permit ApplicationSubmitted through the Civic Review online portal or in person/by mail at Town Offices, including proof of HUD compliance decal and Arizona Department of Building and Fire Safety installation-standard documentation
  • RequiredSite/Plot PlanShowing placement location, zoning district compliance, and foundation/skirting details

Fee schedule

Fee typeAmountNotes
Manufactured, Mobile or Modular Home Placement Fee$300.00Town of Pinetop-Lakeside FY2026-2027 Consolidated Fee Schedule (Resolution 26-1815, effective July 4, 2026), Planning and Development section (unchanged from FY2022-2023 base)
Foundation Only Permit$40.00FY2026-2027 Consolidated Fee Schedule; unchanged from FY2022-2023 base

Sign Permit

Verified

Required for permanent sign installation in the Town of Pinetop-Lakeside, administered by the Community Development Department under Town Code Chapter 17.108 (Sign Regulations), with its own flat-fee table separate from the Building & Safety Department's valuation-based building permit fees.

Verified 2026-07-07 · Source

Requirements

  • Permanent Sign Permit required for sign installation within Town limits, per Town Code Chapter 17.108
  • One sign not larger than 8 square feet in area is generally allowed per site unless a larger sign is authorized by conditional use permit; unless allowed by conditional use permit, the sign must be placed only on the primary structure
  • Illuminated signs require a Permanent Sign Permit with Illumination, which includes the associated electrical permit
  • Temporary signs (banners, portable/A-frame signs) are separately fee-classified from permanent signs
  • Signs must conform to Town of Pinetop-Lakeside sign regulations, Town Code Chapter 17.108

Required documents

  • RequiredSign Permit ApplicationSubmitted through the Civic Review online portal or in person/by mail at Town Offices, 325 W White Mountain Boulevard, Lakeside, AZ 85929

Fee schedule

Fee typeAmountNotes
Permanent Sign Permit$50.00Town of Pinetop-Lakeside FY2026-2027 Consolidated Fee Schedule (Resolution 26-1815, effective July 4, 2026), Planning and Development section; unchanged from FY2022-2023 base
Permanent Sign Permit with Illumination (includes electrical permit)$80.00FY2026-2027 Consolidated Fee Schedule; unchanged from FY2022-2023 base
Temporary Sign — BannerNo ChargeFY2026-2027 Consolidated Fee Schedule
Temporary Sign — Portable (per sign)$30.00FY2026-2027 Consolidated Fee Schedule
Surcharge for Not Obtaining a Sign Permit50% of Sign Permit feeFY2026-2027 Consolidated Fee Schedule
Change of Copy50% of Sign Permit feeFY2026-2027 Consolidated Fee Schedule
Removal of Illegal Temporary Signs (per sign)$10.00FY2026-2027 Consolidated Fee Schedule
Storage Fees (per day)$1.50FY2026-2027 Consolidated Fee Schedule

Residential Solar Photovoltaic (PV) Permit

Verified

Required for installation of residential rooftop or ground-mounted solar photovoltaic systems within the Town of Pinetop-Lakeside. Unlike neighboring Show Low, Pinetop-Lakeside does not publish a dedicated Solar Permit Application — solar installations are billed under the Town's standard Building Permit Fee (valuation-based per the most current ICC Building Valuation Data and ICC Building Fee Schedule Appendix L) for the array/mounting/structural scope, plus the flat Electrical Permit fee for the wiring/interconnection scope. Reviewed against the 2024 IBC/IRC and 2023 NEC as adopted by the Town (Town Code Chapter 15.04).

Verified 2026-07-19 · Source

Requirements

  • Building Permit required for the array mounting/structural scope, submitted via the online Civic Review portal (preferred; app.civicreview.com), in person at Town Offices, or by mail to the Community Development Department
  • Electrical Permit required for the PV wiring/interconnection, under the 2023 NEC as adopted by the Town
  • Governed by the 2024 IBC/IRC as adopted and amended by the Town of Pinetop-Lakeside (Town Code Chapter 15.04)
  • No dedicated Solar Permit Application or expedited solar-specific review track is published by the Town of Pinetop-Lakeside as of 2026-07-19 — solar/PV work is processed as a standard Building + Electrical Permit combination

Required documents

  • RequiredBuilding Permit Application (Civic Review online portal)Used for the array/structural scope since there is no dedicated solar application
  • RequiredElectrical Permit ApplicationCovers the PV system wiring and utility interconnection

Fee schedule

Fee typeAmountNotes
Building Permit Fees (valuation-based)Per the most current ICC Building Valuation Data (published bi-annually) and ICC Building Fee Schedule Appendix LNo solar-specific fee line found; billed under the same valuation-based table as other construction. Town of Pinetop-Lakeside FY2026-2027 Consolidated Fee Schedule (Resolution 26-1815, effective July 4, 2026)
Electrical Permit$40.00Flat fee; no solar-specific electrical fee line found. FY2026-2027 Consolidated Fee Schedule
Plan Check Fee30% of the building permit feeThe Town may collect up to the actual reimbursement cost for commercial building plans reviewed by an outside consulting firm. FY2026-2027 Consolidated Fee Schedule
Re-inspection Fee$30.00FY2026-2027 Consolidated Fee Schedule

EV Charger / EVSE Permit

Verified

The Town of Pinetop-Lakeside has no EV-charger-specific permit type or fee line. An EV charger (EVSE) circuit is electrical installation, alteration, or repair work under the same flat-fee Electrical Permit that governs all other electrical work in Town limits, enforced under the 2023 NEC as adopted by the Town (Town Code Section 15.04.020(B)). No web search of the Town's Building Permits page, FAQ pages, or FY2026-2027 Consolidated Fee Schedule turned up an EV-charger-specific fee line item or expedited process.

Verified 2026-07-20 · Source

Requirements

  • Electrical permit required for the EV charger circuit installation within Town limits, subject to Town Code Section 15.04.130 exemptions (e.g. like-for-like maintenance repairs not involving fixture/equipment modification)
  • Governed by the 2023 NEC as adopted by the Town of Pinetop-Lakeside (Town Code Section 15.04.020(B))
  • Submit via the online Civic Review portal, in person at Town Offices, or by mail to the Community Development Department

Required documents

  • RequiredBuilding/Electrical Permit ApplicationSubmitted through the Civic Review online portal or in person/by mail at Town Offices, 325 W White Mountain Boulevard, Lakeside, AZ 85929; there is no separate EV-charger-specific application form

Fee schedule

Fee typeAmountNotes
Electrical Permit (no EV-specific line item found)$40.00Town of Pinetop-Lakeside FY2026-2027 Consolidated Fee Schedule (Resolution 26-1815, effective July 4, 2026), Planning and Development section — the same flat electrical permit fee used for any other electrical work; no dedicated EV-charger fee is published.
Re-inspection Fee (if applicable)$30.00FY2026-2027 Consolidated Fee Schedule

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Pinetop-Lakeside building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →