Pinetop-Lakeside building permits
VerifiedDepartment contacts, adopted codes, permit types, fees, and gotchas for Pinetop-Lakeside, Arizona.
Last verified 2026-07-07 · Source · Embed this page’s badge · Version history
Building department
- Address
- 325 W White Mountain Boulevard, Lakeside, AZ 85929
- Phone
- 928-368-8696 ext. 2
- Office hours
- Monday - Friday, 8 a.m. - 5 p.m. Applications are submitted via the online Civic Review portal (preferred; app.civicreview.com), in person at Town Offices, or by mail to the Community Development Department. Inspections are requested by calling 928-368-8883 (a separate Inspections line from the main Building & Safety number) at least one working day in advance; requests are generally scheduled for the next working day (e.g., a Friday call-in leads to a Monday inspection). Building & Safety and Building Inspections are administered under the Community Development Department (Community Development Manager Jennifer Butterbrodt, 928-368-8696 ext. 301).
- Website
- Official site
- Permit portal
- Apply online at Pinetop-Lakeside's portal
Inspection guide
See how inspections work in Pinetop-Lakeside — sequence, scheduling & re-inspection fees.
Codes adopted
Arizona has no statewide building code for non-state buildings; codes are adopted locally. According to the International Code Council, codes are adopted locally in Arizona and are predominantly the I-codes, with different cities and counties choosing their own editions and local amendments. The Arizona State Fire Code (adopting the 2018 IFC) applies only to state and county buildings, public and private schools, and non-residential occupancies in areas without a locally adopted fire code — it does not establish a statewide residential or commercial building code floor. Each city and county adopts its own code editions independently, resulting in different I-Code years and amendment sets across jurisdictions. There is no state-mandated minimum edition; enforcement is entirely local. Always confirm the adopted edition and any local amendments with the specific jurisdiction before submitting plans.
Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Show full textShow less
Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Sections 9-462.01 and 9-463 et seq.). The Town of Pinetop-Lakeside independently adopts and administers its own Building Code (Town Code Chapter 15.04) through its Building & Safety Department (part of the Community Development Department); it does not defer permitting to Navajo County. Source: Pinetop-Lakeside Town Code Section 15.04.010/15.04.020.
- 2024 International Building Code (IBC), together with its supplements, if any, published by the International Code Council, adopted by reference (Town Code Section 15.04.020(B)). Source: Pinetop-Lakeside Town Code Section 15.04.020, current through Ord. 25-481.
- 2024 International Residential Code (IRC), together with its supplements, if any, published by the International Code Council, adopted by reference (Town Code Section 15.04.020(B)). Source: Pinetop-Lakeside Town Code Section 15.04.020.
- 2024 International Mechanical Code (IMC), together with its supplements, if any, published by the International Code Council, adopted by reference (Town Code Section 15.04.020(B)). Source: Pinetop-Lakeside Town Code Section 15.04.020.
- 2024 International Plumbing Code (IPC), together with its supplements, if any, published by the International Code Council, adopted by reference (Town Code Section 15.04.020(B)). Source: Pinetop-Lakeside Town Code Section 15.04.020.
- 2023 National Electrical Code (NEC), together with its supplements, if any, published by the National Fire Protection Association, adopted by reference (Town Code Section 15.04.020(B)) — one edition behind the 2024 ICC family set; the Town Code specifically notes new NEC editions may be adopted from time to time by Town Council resolution. Source: Pinetop-Lakeside Town Code Section 15.04.020.
- The Town's own live Building Permits web page (pinetoplakesideaz.gov/173/Building-Permits) independently confirms: 'The Town of Pinetop/Lakeside has adopted the 2024 editions of the International Building Codes with the 2023 edition of the National Electrical Code' — consistent with the Municipal Code text. Source: Building Permits | Pinetop-Lakeside, AZ.
Town Code Chapter 15.04 (Building Code) and the Town's Building Permits page carry no standalone adoption citation for the International Fuel Gas Code (IFGC), International Fire Code (IFC), International Existing… Show full textShow less
Town Code Chapter 15.04 (Building Code) and the Town's Building Permits page carry no standalone adoption citation for the International Fuel Gas Code (IFGC), International Fire Code (IFC), International Existing Building Code (IEBC), or International Energy Conservation Code (IECC). The Town's own Gas Permit (Town Fee Schedule) is administered under the Building & Safety Department's general permitting authority (Town Code Section 15.04.020 references 'addenda and additions...as apply to the Town'), but no separately cited fuel-gas-code edition is given. Fire-related plan review for multi-family, industrial, and commercial buildings is expressly routed to the applicable Fire District for stamped approval prior to Town permit issuance (Town Code Section 15.04.150), rather than the Town administering its own separately cited Fire Code chapter. Source: Pinetop-Lakeside Town Code Chapter 15.04.
ADA/Accessibility: Arizonans with Disabilities Act standards and implementing rules (A.R.S. Show full textShow less
ADA/Accessibility: Arizonans with Disabilities Act standards and implementing rules (A.R.S. Title 41, Chapter 9, Article 8), including the 'Americans with Disabilities Act Accessibility Guidelines for Buildings and Facilities,' declared a public record by Town Resolution No. 96-426, are adopted and incorporated as an amendment to the International Building Code for both public entities and public accommodations/commercial facilities, applying to new construction and alterations commenced after September 3, 1996. Source: Pinetop-Lakeside Town Code Section 15.04.320 (Addendum and Additions).
Manufactured/mobile/modular homes: regulated jointly by the State of Arizona (Arizona Department of Building and Fire Safety, Office of Manufactured Housing) for HUD compliance and installation standards, and by the Town for placement/location permits. Show full textShow less
Manufactured/mobile/modular homes: regulated jointly by the State of Arizona (Arizona Department of Building and Fire Safety, Office of Manufactured Housing) for HUD compliance and installation standards, and by the Town for placement/location permits. As of April 16, 1995, the Building Official may not issue a building/location permit for a mobile/manufactured home unless it bears a HUD compliance decal dated no earlier than June 15, 1976 (or successor HUD standard) and complies with Arizona Department of Building and Fire Safety installation standards (ground-level installation, fully-skirted installation, or installation on a permanent visible foundation). Source: Pinetop-Lakeside Town Code Section 15.04.220 (Mobile and Manufactured Homes).
Fire District plan review: all plans and specifications for multi-family dwellings, industrial and commercial buildings (or alterations/additions/conversions thereto) requiring a Town building permit must first be… Show full textShow less
Fire District plan review: all plans and specifications for multi-family dwellings, industrial and commercial buildings (or alterations/additions/conversions thereto) requiring a Town building permit must first be submitted to and stamped approved by the respective Fire District before the Town's Planning and Zoning Department will issue the permit; the Town reserves the right to issue a permit without prior Fire District approval subject to Town Attorney review and Town Council approval. Source: Pinetop-Lakeside Town Code Section 15.04.150.
Permit types & fees
Residential Building Permit (New Construction / Addition / Remodel)
Required for new single-family residential construction, additions, and remodels within the Town of Pinetop-Lakeside. Reviewed against the 2024 IBC/IRC and Town of Pinetop-Lakeside amendments (Town Code Chapter 15.04). Applications are submitted via the online Civic Review portal (preferred), in person at Town Offices, or by mail.
From$1,000valuation-basedElectrical Permit
Required for electrical installation, alteration, or repair work in the Town of Pinetop-Lakeside, governed by the 2023 National Electrical Code (NEC) as adopted by the Town (Town Code Chapter 15.04). Flat-fee permit administered by the Building & Safety Department.
From$40.00Gas Permit
Required for gas piping and gas appliance installation, alteration, or repair work in the Town of Pinetop-Lakeside. Flat-fee permit administered by the Building & Safety Department.
From$40.00Manufactured, Mobile, or Modular Home Placement Permit
Required for placement of a manufactured, mobile, or modular home within the Town of Pinetop-Lakeside. Governed by Town Code Section 15.04.220, requiring HUD compliance and Arizona Department of Building and Fire Safety installation-standard compliance in addition to the Town's own placement permit.
From$300.00Sign Permit
Required for permanent sign installation in the Town of Pinetop-Lakeside, administered by the Community Development Department under Town Code Chapter 17.108 (Sign Regulations), with its own flat-fee table separate from the Building & Safety Department's valuation-based building permit fees.
From$50.00Residential Solar Photovoltaic (PV) Permit
Required for installation of residential rooftop or ground-mounted solar photovoltaic systems within the Town of Pinetop-Lakeside. Unlike neighboring Show Low, Pinetop-Lakeside does not publish a dedicated Solar Permit Application — solar installations are billed under the Town's standard Building Permit Fee (valuation-based per the most current ICC Building Valuation Data and ICC Building Fee Schedule Appendix L) for the array/mounting/structural scope, plus the flat Electrical Permit fee for the wiring/interconnection scope. Reviewed against the 2024 IBC/IRC and 2023 NEC as adopted by the Town (Town Code Chapter 15.04).
See fee scheduleEV Charger / EVSE Permit
The Town of Pinetop-Lakeside has no EV-charger-specific permit type or fee line. An EV charger (EVSE) circuit is electrical installation, alteration, or repair work under the same flat-fee Electrical Permit that governs all other electrical work in Town limits, enforced under the 2023 NEC as adopted by the Town (Town Code Section 15.04.020(B)). No web search of the Town's Building Permits page, FAQ pages, or FY2026-2027 Consolidated Fee Schedule turned up an EV-charger-specific fee line item or expedited process.
From$40.00Commercial Building Permit (New Construction / Alteration / Tenant Improvement)
Required for new commercial building construction and for alterations, additions, or conversions of existing commercial buildings within the Town of Pinetop-Lakeside, reviewed against the 2024 IBC and Town of Pinetop-Lakeside amendments (Town Code Chapter 15.04). The Town uses the same Building Permit Application and Civic Review portal for commercial as for residential work — no separate commercial-specific application form was found. There is no separate Tenant Improvement (TI) permit type, application, or fee line: interior tenant-improvement/remodel work in an existing commercial space is processed as a standard (valuation-based) Building Permit, the same as new commercial construction. Confirmed by direct review of the Town's Building Permit Application/Civic Review portal, the FY2026-2027 Consolidated Fee Schedule (all fee lines reviewed), the Forms & Documents page, and Town Code Chapter 15.04 (full chapter text reviewed) — none reference a distinct TI process, application, or fee.
From$1,000valuation-basedFire Sprinkler and Fire Alarm System Permit
The Town of Pinetop-Lakeside adopts no fire code and issues no fire sprinkler or fire alarm permit of its own. Town Code Sec. 15.04.020 adopts the 2024 International Building Code, 2024 International Mechanical Code, 2024 International Residential Code, 2024 International Plumbing Code and 2023 National Electrical Code - with no International Fire Code among them - and the Town's FY2026-2027 Consolidated Fee Schedule carries no fire permit fee line. Fire code enforcement, fire protection system plan review and fire permitting inside Town limits are performed by two independent fire districts depending on where the property sits: the Pinetop Fire District (1845 S. Pine Lake Rd., Pinetop; 928-367-2199) and the Timber Mesa Fire and Medical District, formerly the Lakeside Fire District (3561 E. Deuce of Clubs, Show Low; 928-537-5100). Town Code Sec. 15.04.100.A makes the district's stamped approval a precondition of the Town issuing a construction permit for multi-family, industrial and commercial work.
From$350
Pinetop-Lakeside's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Pinetop-Lakeside yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Pinetop-Lakeside lands. Privacy.
New residential construction activity
New privately-owned residential construction onlyHousing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).
- Latest month (2026-07)
- 1units
1 buildings · $651,000 valuation
- Trailing 12 months
- 16units
11 of 12 months reported · #59 in Arizona coverage by units
- Year to date (2026 YTD through 2026-07)
- 12units
12 buildings · $4.7M valuation
7 month(s) reported to Census
- Full year 2025
- 22units
22 buildings · $7.3M valuation
Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-07 vintage. Census survey data — separate from the permit-requirements verification above. All Arizona building activity
Tips & gotchas
- Arizona has no statewide mandatory building code — the Town of Pinetop-Lakeside independently adopts and amends its own Building Code (Town Code Chapter 15.04: 2024 IBC/IRC/IMC/IPC, 2023 NEC) through its Building & Safety Department (part of the Community Development Department) and does not defer to Navajo County for permitting within Town limits.
- Pinetop-Lakeside publishes an unusually direct, plain-language answer to its own plan review timeline on its live FAQ page: a 3-day administrative review followed by building plan review 'usually' completed within 18 working business days — a verified combined figure of approximately 21 business days, used as reviewTimelineDays across every permit type in this record where no more specific timeline is separately published.
- Fences and freestanding masonry walls do NOT require a building permit at all in Pinetop-Lakeside (Town Code Section 15.04.130(A), confirmed independently by the Town's own FAQ) — this is a genuine no-permit-required rule, not a missing permit type, so no fence permit entry was built for this record. Height/placement zoning limits (3'6" street-side view-obscuring maximum, 5' for open fencing, up to 6' in rear yards subject to Community Development Director approval) still apply even without a permit.
- The Town's accessory-structure no-permit threshold is 145 square feet (Town Code Section 15.04.130(C)). It is an unusual figure — Buckeye and Show Low, for example, both use 200 sq ft — so size a shed to Pinetop-Lakeside's number rather than a familiar 120 sq ft or 200 sq ft rule of thumb.
- Multi-family, industrial, and commercial building plans (and qualifying alterations/additions/conversions) must be stamped approved by the applicable Fire District BEFORE the Town's Planning and Zoning Department will issue a building permit (Town Code Section 15.04.150) — this is an external pre-approval gate distinct from the Town's own review clock.
- Roof design snow/live loads are notably elevation-driven: 45 lb PSF for roof pitches from 0 to 3-in-12, and 40 lb PSF for pitches 4-in-12 and steeper (Town Code Section 15.04.320) — reflecting the Town's White Mountains location, much higher than desert-floor AZ cities like Buckeye (0 snow load).
- The Town's FY2026-2027 Consolidated Fee Schedule (Resolution 26-1815, approved June 4, 2026, effective July 4, 2026) supersedes the FY2022-2023 schedule (Resolution 22-1621) that is still cited on some cached/archived pages; several core Building & Safety fees increased between these two schedules (Electrical Permit $30 to $40; Gas Permit $25 to $40) — this record cites the current FY2026-2027 figures as authoritative, with the prior figures noted for context where relevant.
- Town Code Chapter 15.04 and the Town's Building Permits page contain no standalone International Fuel Gas Code (IFGC), International Fire Code (IFC), International Existing Building Code (IEBC), or International Energy Conservation Code (IECC) adoption section, so no adopted edition or year is stated here for those codes. Call the Building Official (928-368-8696 ext. 2) to confirm current practice for fuel-gas or energy-code compliance specifically.
- Building permits are valid 180 days from issuance if work hasn't started (or 180 days of abandonment after an inspection), with one 180-day extension available on written request; renewal of an expired permit costs half the original fee within 1 year of expiration, or the full fee if expired more than 1 year — all figures directly from the Town's own FAQ page.
- Inspections are requested through a SEPARATE phone line (928-368-8883, Inspections) from the main Building & Safety Department number (928-368-8696 ext. 2) — call at least one working day ahead; a Friday call-in is typically scheduled for the following Monday.
- No separately published, sign-specific plan review turnaround time was found for the Sign Permit (administered under Town Code Chapter 17.108 by Community Development/Planning rather than the Building & Safety Department's Chapter 15.04 process); this is documented as a confirmed gap in that permit type's own tips rather than assumed to follow the general building-permit timeline, since sign review is a distinct zoning/Planning function.