Pinetop-Lakeside building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Pinetop-Lakeside, Arizona.
Verified 2026-07-07 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 325 W White Mountain Boulevard, Lakeside, AZ 85929
- Phone
- 928-368-8696 ext. 2
- Office hours
- Monday - Friday, 8 a.m. - 5 p.m. Applications are submitted via the online Civic Review portal (preferred; app.civicreview.com), in person at Town Offices, or by mail to the Community Development Department. Inspections are requested by calling 928-368-8883 (a separate Inspections line from the main Building & Safety number) at least one working day in advance; requests are generally scheduled for the next working day (e.g., a Friday call-in leads to a Monday inspection). Building & Safety and Building Inspections are administered under the Community Development Department (Community Development Manager Jennifer Butterbrodt, 928-368-8696 ext. 301).
- Website
- Official site
Published scheduling rules
- Inspections are requested through a SEPARATE phone line (928-368-8883, Inspections) from the main Building & Safety Department number (928-368-8696 ext. 2) — call at least one working day ahead; a Friday call-in is typically scheduled for the following Monday. (General)
Inspection sequence
Applies to: Residential Building Permit (New Construction / Addition / Remodel)
- 1
Foundation
After trenches are excavated and forms erected
- 2
Concrete Slab or Under-Floor
Before concrete is poured
- 3
Shear Wall and Roof Sheeting
Prior to house wrap
- 4
Frame
After roof and all framing complete
- 5
Insulation
Prior to gypsum board installation
- 6
Lath and/or Gypsum Board
Before plastering is applied
- 7
Final Inspection
After completion, ready for occupancy; project must be completed per approved plans with all electrical, plumbing, mechanical, and structural installations finished. Certificate of Occupancy issued upon Building Official certification; occupancy may not occur before issuance.
Applies to: Electrical Permit
- 1
Rough-In
Wiring, box placement, and panel connections before walls are closed
- 2
Final
Devices installed and protections verified per the 2023 NEC as adopted by the Town
Applies to: EV Charger / EVSE Permit
- 1
Rough-In
EVSE circuit wiring, box placement, and panel connections before walls are closed
- 2
Final
Charger installed and protections verified per the 2023 NEC as adopted by the Town
Applies to: Gas Permit
- 1
Gas Line/Rough-In
Piping installation verified before concealment
- 2
Final
Gas connections and appliance installation verified, pressure test/leak check completed
Applies to: Manufactured, Mobile, or Modular Home Placement Permit
- 1
Foundation/Placement
Verifies ground-level, fully-skirted, or permanent-foundation installation method per Arizona Department of Building and Fire Safety standards
- 2
Final
HUD decal, skirting/foundation, and utility connections verified complete
Applies to: Residential Solar Photovoltaic (PV) Permit
- 1
Rough Electrical
Conduit runs, wire sizing, and disconnect placement before energizing
- 2
Final
Final electrical/building inspection preceding sign-off
Final inspection only: Sign Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Pinetop-Lakeside building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Pinetop-Lakeside building permits
Get alerts for Pinetop-Lakeside
We'll email you when Pinetop-Lakeside's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.