EV Charger / EVSE Permit in Pinetop-Lakeside, Arizona
The Town of Pinetop-Lakeside has no EV-charger-specific permit type or fee line. An EV charger (EVSE) circuit is electrical installation, alteration, or repair work under the same flat-fee Electrical Permit that governs all other electrical work in Town limits, enforced under the 2023 NEC as adopted by the Town (Town Code Section 15.04.020(B)). No web search of the Town's Building Permits page, FAQ pages, or FY2026-2027 Consolidated Fee Schedule turned up an EV-charger-specific fee line item or expedited process.
Verified 2026-07-20 · Source
When you need this permit
- Electrical permit required for the EV charger circuit installation within Town limits, subject to Town Code Section 15.04.130 exemptions (e.g. like-for-like maintenance repairs not involving fixture/equipment modification)
- Governed by the 2023 NEC as adopted by the Town of Pinetop-Lakeside (Town Code Section 15.04.020(B))
- Submit via the online Civic Review portal, in person at Town Offices, or by mail to the Community Development Department
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Rough-In
EVSE circuit wiring, box placement, and panel connections before walls are closed
- 2
Final
Charger installed and protections verified per the 2023 NEC as adopted by the Town
See the full Pinetop-Lakeside inspection guide — scheduling & re-inspection fees →
Tips
- There is no standalone EV-charger permit in Pinetop-Lakeside — apply for the standard flat-fee Electrical Permit ($40.00) the same as any other electrical work.
- Confirm the current fee directly with the Building Official if working from an older cached fee schedule; the Electrical Permit fee has changed before (it rose from $30.00 in the FY2022-2023 schedule to $40.00 in the FY2026-2027 schedule).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Pinetop-Lakeside building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Pinetop-Lakeside
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Arizona →
Look up this fee in a different city →