This is PermitBase’s published record for Tucson as of 2026-07-20. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Tucson building permits

Verified

Tucson, Arizona — as published 2026-07-20.

Verified 2026-07-03 · Source

Codes adopted

Arizona has no mandatory statewide building code — code adoption is entirely a local (city/county) decision. The City of Tucson adopts its own model building codes, published by the International Code Council (ICC) and the National Fire Protection Association (NFPA), on a six-year cycle, with local amendments authorized by Ordinance #12171. Source: City of Tucson Planning & Development Services, Building Codes page (tucsonaz.gov/Departments/Planning-Development-Services/Codes/Building-Codes).2024 International Building Code (IBC) — effective January 1, 2026, as adopted by the City of Tucson with local amendments2024 International Residential Code (IRC) — effective January 1, 2026, as adopted by the City of Tucson with local amendments2024 International Existing Building Code (IEBC) — effective January 1, 20262024 International Fuel Gas Code (IFGC) — effective January 1, 20262024 International Mechanical Code (IMC) — effective January 1, 20262024 International Plumbing Code (IPC) — effective January 1, 2026 (Tucson/Pima County use the International Plumbing Code, not the Uniform Plumbing Code)2024 International Swimming Pool & Spa Code (ISPSC) — effective January 1, 20262024 International Energy Conservation Code (IECC) — effective July 1, 2026 (the energy code follows the other 2024 model codes on a delayed effective date)2023 National Electrical Code (NEC) — effective January 1, 20262024 International Fire Code (IFC) — current adopted edition per City of Tucson Building Codes pageAll permit applications and related submittals received on or after July 1, 2026 must comply with the 2024 International Codes and amendments as adopted by the City of Tucson and in effect as of that date, including the 2023 NEC where applicable. Applications submitted before July 1, 2026 continue to be reviewed under the code editions in effect at the time of submittal, unless approved by the Building Official. Source: City of Tucson Building Codes page.Other adopted building regulations (updated less frequently than the six-year model code cycle): Arizona Administrative Code Title 18, Chapter 5 (Public and Semi-Public Swimming Pools); 2012 City of Tucson/Pima County Outdoor Lighting Code; ICC A117.1-2017 Accessible and Usable Buildings and Facilities (effective 1/1/26); Inclusive Home Design Ordinance. Source: City of Tucson Building Codes page.Previously adopted (superseded) editions include the 2018 International Building/Residential/Mechanical/Plumbing/Fuel Gas/Existing Building/Swimming Pool & Spa Codes, 2017 NEC, and 2012-cycle International Codes with 2011 NEC. Source: City of Tucson Building Codes page.Sustainability and related codes: City of Tucson Riparian Vegetation Preservation; Commercial Rainwater Harvesting (Engineering Code); EV Charging - Commercial and Multifamily (Zoning Code); Landfill Development Ordinance (Engineering Code); Native Plant Preservation Ordinance (Landscaping Code); Prohibition on Ornamental Turf (Zoning Code, UDC 7.6.4.D); WaterSense Plumbing Fixtures (Building Code). Source: City of Tucson Building Codes page.

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for construction of new single-family homes, duplexes, and other one- and two-family dwellings in Tucson. Reviewed against the 2024 International Residential Code (IRC) and 2024 IECC (effective 7/1/2026) as adopted and amended by the City of Tucson. Applications are submitted through Tucson Development Center (TDC) Online, PDSD's self-service permitting portal.

Verified 2026-07-03 · Source

Requirements

  • Building permit required for any new dwelling unit (a dwelling unit is defined as having a place to sleep, a bathroom, and a kitchen, regardless of whether it is rented or used by family)
  • Plans must comply with the 2024 IRC and 2024 IECC (effective 7/1/2026) as adopted by the City of Tucson, plus applicable zoning and utility review
  • All plans must use a minimum of 3/32 inch type (per commercial plan standard) and be neat, legible, and well organized; PDSD reviews plans but does not design them
  • Rental units are treated as commercial property and require a licensed contractor (A.R.S. Section 32-1121)
  • Homeowners may self-perform work under the Owner/Builder exemption (A.R.S. Section 32-1121.A) by being listed as owner on the permit and submitting a notarized Owner/Builder Affidavit, except where the Handyman Exemption is barred (permit-required work or cost over $1,000)
  • Application submitted online via Tucson Development Center (TDC) Online; the TDC Online Navigator decision-tree tool helps applicants select the correct permit type before applying
  • Falls under the Standard Lane permit review track (20-business-day performance goal)

Required documents

  • RequiredResidential Building Permit Application (New Dwelling)Submitted online through Tucson Development Center (TDC) Online
  • RequiredResidential Building Permit Application Checklist - New DwellingCity of Tucson PDSD checklist of required submittal items for new residential dwelling construction
  • RequiredConstruction DrawingsSite plan, floor plan, foundation plan, framing, elevations, and structural details consistent with the 2024 IRC as adopted by the City of Tucson
  • OptionalOwner/Builder AffidavitRequired only if the homeowner elects to self-perform work under the A.R.S. Section 32-1121.A owner/builder exemption instead of using a licensed contractor

Fee schedule

Fee typeAmountNotes
Building Permit Fee, New Construction — valuation $1 to $2,000$89.45 base feeCity of Tucson FY27 Planning and Permitting Fee Schedule (Section 4-02.4), effective 7/1/2026, per the ICC Building Valuation Table
Building Permit Fee, New Construction — valuation $2,000.01 to $25,000$89.45 base fee + $22.95 per additional $1,000City of Tucson FY27 Planning and Permitting Fee Schedule (Section 4-02.4)
Building Permit Fee, New Construction — valuation $25,000.01 to $50,000$617.30 base fee + $16.83 per additional $1,000City of Tucson FY27 Planning and Permitting Fee Schedule (Section 4-02.4)
Building Permit Fee, New Construction — valuation $50,000.01 to $100,000$1,038.05 base fee + $9.64 per additional $1,000City of Tucson FY27 Planning and Permitting Fee Schedule (Section 4-02.4)
Building Permit Fee, New Construction — valuation $100,000.01 to $500,000$1,520.05 base fee + $8.25 per additional $1,000City of Tucson FY27 Planning and Permitting Fee Schedule (Section 4-02.4)
Building Permit Fee, New Construction — valuation $500,000.01 to $1,000,000$4,800.05 base fee + $7.45 per additional $1,000City of Tucson FY27 Planning and Permitting Fee Schedule (Section 4-02.4)
Building Permit Fee, New Construction — valuation $1,000,000.01 and above$8,525.05 base fee + $5.45 per additional $1,000City of Tucson FY27 Planning and Permitting Fee Schedule (Section 4-02.4)
Building Staff Review and Deferred Submittal, per IBC as amended — Residential50% of building permit feeCity of Tucson FY27 Fee Schedule (Section 4-02.2.1)
Digital Filing Fee1% of the total fee, minimum $18.54City of Tucson FY27 Fee Schedule (Section 4-01.5.1); applies to all development applications

Residential Addition / Alteration Permit

Verified

Required for additions, remodels, and structural alterations to existing one- and two-family dwellings in Tucson, including porches, garages, room additions, and interior remodels affecting structural or life-safety elements. Reviewed against the 2024 IRC as adopted by the City of Tucson. Fee is based on a percentage of standard valuation depending on alteration level (per the International Existing Building Code).

Verified 2026-07-03 · Source

Requirements

  • Building permit required for additions, remodels, and alterations affecting structural, fire, or life-safety elements, including porches, additions, and garages
  • Applicants must provide a signed contract identifying the value of work performed as the fee basis; if unavailable, valuation is assigned per the ICC Valuation Table based on the IEBC alteration level
  • Level 1 Alteration (5% of standard valuation): removal and replacement of existing materials, equipment, or fixtures
  • Level 2 Alteration (15% of standard valuation): reconfiguration of space, addition/elimination of any door or window, reconfiguration/extension of any system, or installation of additional equipment
  • Level 3 Alteration (30% of standard valuation): alterations where the work area exceeds 50% of the building area
  • A site plan showing lot lines, setbacks, and existing/proposed structures is required
  • Interior finish work (paint, tile, carpet, cabinets, countertops) that does not affect plumbing or electrical systems does NOT require a permit
  • Falls under the Standard Lane permit review track (20-business-day performance goal)

Required documents

  • RequiredResidential Building Permit Application Checklist - Addition/AlterationCity of Tucson PDSD checklist for addition/remodel/alteration submittals
  • OptionalResidential Building Permit Application Checklist - Addition/Alteration (Interior Only)City of Tucson PDSD checklist for interior-only alterations affecting structural or life-safety elements
  • RequiredConstruction DrawingsSite plan and framing/structural details showing scope of work and connection to the existing structure
  • OptionalSigned Contractor/Client ContractIdentifies the value of work performed; used as the basis for the alteration valuation fee. If unavailable, valuation is assigned per the ICC Valuation Table using the applicable IEBC alteration level

Fee schedule

Fee typeAmountNotes
Residential Level 1 Alteration (removal/replacement of existing materials, equipment, or fixtures)5% of standard valuationCity of Tucson FY27 Fee Schedule (Section 4-02.8.2)
Residential Level 2 Alteration (reconfiguration of space, door/window changes, system extension, additional equipment)15% of standard valuationCity of Tucson FY27 Fee Schedule (Section 4-02.8.3)
Residential Level 3 Alteration (work area exceeds 50% of building area)30% of standard valuationCity of Tucson FY27 Fee Schedule (Section 4-02.8.4)
Digital Filing Fee1% of the total fee, minimum $18.54City of Tucson FY27 Fee Schedule (Section 4-01.5.1)

Electrical Permit (Trade Permit)

Verified

Required for hardwired electrical installation, alteration, or repair work in Tucson, governed by the 2023 National Electrical Code (NEC) as adopted by the City of Tucson (effective 1/1/2026). Issued as a Trade Permit under the FY27 fee schedule, priced per item rather than by valuation.

Verified 2026-07-03 · Source

Requirements

  • Electrical permit (Trade Permit) required for installation of new hardwired fixtures, outlets, ceiling fans, panel upgrades/replacements, new circuits, and electrical reconnections
  • Governed by the 2023 NEC as adopted and amended by the City of Tucson
  • Like-for-like replacement of switches, receptacles, breakers, or fuses in the same location does NOT require a permit
  • Main breaker replacement may or may not require a permit depending on Policy 2016-01 criteria (like-for-like in the same location may be exempt)
  • Low-voltage wiring (doorbells, security systems, cameras, irrigation controllers) operating under 25 volts / 50 volt-amps does NOT require a permit
  • A general contractor must be identified if multiple trade disciplines are combined on one Trade Permit application
  • Falls under the Express Lane (Residential Trade / Electrical Reconnect: 24-hour performance goal)

Required documents

  • RequiredTrade Permit ApplicationSubmitted online through Tucson Development Center (TDC) Online, specifying item category and quantity (e.g., new electrical circuit, service panel upgrade)

Fee schedule

Fee typeAmountNotes
Trade Permit — first item (e.g., new electrical circuit, panel upgrade/replacement, electric clearance)$150.00City of Tucson FY27 Fee Schedule (Section 4-02.9.1); includes up to 1/2 hour of staff review and permit processing plus 2 inspections
Trade Permit — each additional item beyond the first$50.00 per additional itemCity of Tucson FY27 Fee Schedule (Section 4-02.9.2)
Additional review/inspection time beyond Trade Permit allowanceStandard hourly rate ($100.00/hour), minimum 1/2 hourCity of Tucson FY27 Fee Schedule (Sections 4-02.9.1-2, 4-01.6.1)
Digital Filing Fee1% of the total fee, minimum $18.54City of Tucson FY27 Fee Schedule (Section 4-01.5.1)

Plumbing Permit (Trade Permit)

Verified

Required for plumbing installation, alteration, or repair work in Tucson, governed by the 2024 International Plumbing Code (IPC) as adopted by the City of Tucson (effective 1/1/2026). Issued as a Trade Permit, priced per item rather than by valuation.

Verified 2026-07-03 · Source

Requirements

  • Plumbing permit (Trade Permit) required for new fixtures, new piping, water heater installation/fuel-type change, sewer/building drain repair-replacement, and water service line repair-replacement
  • Governed by the 2024 International Plumbing Code (IPC) as adopted by the City of Tucson — not the Uniform Plumbing Code
  • Toilet REPLACEMENT in the same location does NOT require a permit; a NEW toilet location (new plumbing/increased wastewater flow) DOES require a permit
  • Fixing a leak or clearing a clog in accessible piping does NOT require a permit; repairs requiring pipe/valve replacement or rerouting (especially concealed piping) DO require a permit
  • Installing or replacing a water softener requires a plumbing permit
  • Septic system installation and sewer connections may require both a City permit (Development Package) and Pima County Wastewater approval
  • Falls under the Express Lane (Residential Trade: 24-hour performance goal) for standard trade-scope plumbing work

Required documents

  • RequiredTrade Permit ApplicationSubmitted online through Tucson Development Center (TDC) Online, specifying item category and quantity (e.g., water heater installation, sewer line repair)
  • OptionalGas Piping TemplateRequired with the application if installing or replacing gas piping; identifies size and length of all piping

Fee schedule

Fee typeAmountNotes
Trade Permit — first item (e.g., water heater installation, sewer line/building drain repair-replace, water service line repair-replace)$150.00City of Tucson FY27 Fee Schedule (Section 4-02.9.1); includes up to 1/2 hour of staff review and permit processing plus 2 inspections
Trade Permit — each additional item beyond the first$50.00 per additional itemCity of Tucson FY27 Fee Schedule (Section 4-02.9.2)
Residential electric/gas reconnect (includes plumbing/gas piping review if applicable)$135.59City of Tucson PDSD Residential Permits page; covers administrative and inspection costs for reconnecting service after 6+ months shutoff
Digital Filing Fee1% of the total fee, minimum $18.54City of Tucson FY27 Fee Schedule (Section 4-01.5.1)

Mechanical / HVAC Permit (Trade Permit)

Verified

Required for heating, ventilation, and air conditioning installations in Tucson, governed by the 2024 International Mechanical Code (IMC) and International Fuel Gas Code (IFGC) as adopted by the City of Tucson (effective 1/1/2026). Issued as a Trade Permit, priced per item.

Verified 2026-07-03 · Source

Requirements

  • Mechanical permit (Trade Permit) required for central HVAC installation/replacement, mini-split (distributed) HVAC systems, ductwork installation/replacement/modification, and non-portable evaporative coolers in most cases
  • Governed by the 2024 IMC and IFGC as adopted by the City of Tucson
  • Load and sizing calculations are required for BOTH new and replacement HVAC equipment
  • Evaporative cooler replaced with the same type/size does NOT require a permit unless the property is in a Historic Preservation Zone or Neighborhood Preservation Zone
  • Portable heating/cooling equipment plugged into a standard outlet with its original factory cord does NOT require a permit
  • Trade Permit categories include Air Conditioner/Heater Repair/Replace (max 2 units per item) and Fixed Appliance
  • Falls under the Express Lane (Residential Trade: 24-hour performance goal)

Required documents

  • RequiredTrade Permit ApplicationSubmitted online through Tucson Development Center (TDC) Online
  • OptionalMechanical Upgrade TemplateCity of Tucson PDSD template documenting mechanical equipment upgrade/replacement details, load and sizing calculations

Fee schedule

Fee typeAmountNotes
Trade Permit — first item (e.g., Air Conditioner/Heater Repair/Replace, max 2 units)$150.00City of Tucson FY27 Fee Schedule (Section 4-02.9.1); includes up to 1/2 hour of staff review and permit processing plus 2 inspections
Trade Permit — each additional item beyond the first$50.00 per additional itemCity of Tucson FY27 Fee Schedule (Section 4-02.9.2)
Digital Filing Fee1% of the total fee, minimum $18.54City of Tucson FY27 Fee Schedule (Section 4-01.5.1)

Roofing Permit (Structural Roof Work)

Verified

Required for structural roof work and new roof installations in Tucson; routine like-for-like roof-surface repair/replacement is generally exempt unless the property is in a Historic Preservation Zone or Neighborhood Preservation Zone. Governed by the 2024 IRC/IBC as adopted by the City of Tucson.

Verified 2026-07-03 · Source

Requirements

  • A permit IS required for structural roof work, including replacement of sheathing, decking, joists, or trusses
  • A permit IS required for new roof penetrations (skylights, light tubes, new vents for plumbing/kitchen/attic exhaust)
  • A permit is NOT required for roof surface repair/replacement using the same material type (e.g., shingle-for-shingle, tile-for-tile) with no structural work involved AND the property is not in a Historic Preservation Zone or Neighborhood Preservation Zone
  • Special District Review is required for any roofing work if the property is located in a Historic Preservation Zone (HPZ) or Neighborhood Preservation Zone (NPZ), regardless of scope
  • Reviewed under the applicable permit type (Addition/Alteration) rather than as its own dedicated permit category

Required documents

  • RequiredBuilding Permit Application (Addition/Alteration)Submitted online through Tucson Development Center (TDC) Online for structural roof work or new roof penetrations
  • RequiredConstruction DrawingsFraming/structural details for sheathing, decking, joist, or truss replacement

Fee schedule

Fee typeAmountNotes
Residential Alteration (structural roof work), Level 1-3 depending on scope5%, 15%, or 30% of standard valuation depending on alteration level
GOVERNING fee: Tucson has no separate roofing-specific fee line — structural roof work (sheathing/decking/joist/truss replacement, new roof penetrations) is billed under the same Residential… Show full citation

GOVERNING fee: Tucson has no separate roofing-specific fee line — structural roof work (sheathing/decking/joist/truss replacement, new roof penetrations) is billed under the same Residential Alteration valuation-percentage fee already verified for the residential-addition-remodel permit type above (5% Level 1 / 15% Level 2 / 30% Level 3 of standard valuation, per IEBC alteration level). City of Tucson FY27 Fee Schedule (Section 4-02.8), effective 7/1/2026

Digital Filing Fee1% of the total fee, minimum $18.54City of Tucson FY27 Fee Schedule (Section 4-01.5.1)

Residential Solar Photovoltaic (PV) Permit

Verified

Required for installation of rooftop solar photovoltaic systems in Tucson. Licensed solar contractors can use SolarApp+ for eligible residential projects for same-day (24-hour) automated review; ineligible projects use the standard 20-business-day Tucson Development Center Online review. Governed by the 2023 NEC (Article 705 interconnection) as adopted by the City of Tucson.

Verified 2026-07-03 · Source

Requirements

  • SolarApp+ eligibility: roof-mounted on the main dwelling, NOT ballasted, NOT in a special district or Historic/Neighborhood Preservation Zone, NOT in an environmentally sensitive area or hillside development zone, NOT in a County Flood Hazard/floodplain area (unless leased system), NOT adding to an existing PV system, located within Tucson city limits, and installed by a licensed contractor
  • The mounted structure must already be legal and permitted before a solar permit can move forward
  • Non-SolarApp+ eligible projects (e.g., in HPZ/NPZ, ballasted systems, additions to existing PV) must apply through Tucson Development Center Online under the standard 20-business-day Standard Lane review
  • SolarApp+ submittal requires the contractor's license information and an approved SolarApp+ approval number to be included with the Tucson Development Center Online application
  • Project description must begin with the word 'SolarApp+' when applying through Tucson Development Center Online for a SolarApp+-eligible project
  • Solar permit issued within 24 hours of SolarApp+ approval and TDC Online fee payment; virtual/remote inspection is then scheduled through TDC Online

Required documents

  • RequiredSolarApp+ Automated Review SubmittalDesign submitted directly to the SolarApp+ website; contractor registers/logs in with license information
  • RequiredBuilding/Electrical Permit Application (TDC Online)Submitted via Tucson Development Center Online with the SolarApp+ approval number and approved documents/drawings attached

Fee schedule

Fee typeAmountNotes
SolarApp+ PV permit processing fee (charged by the SolarApp+ website)$35.00City of Tucson PDSD Residential Solar Permits page
SolarApp+ PV + Storage permit processing fee (charged by the SolarApp+ website)$25.00City of Tucson PDSD Residential Solar Permits page
Solar Permit — Photovoltaic Electrical Systems, 1 to 30 PV panels$122.46City of Tucson FY27 Fee Schedule (Section 4-02.9.3); includes inverter and panel racking; additional equipment billed as Supplementary Equipment
Solar Permit — Photovoltaic Electrical Systems, 31 to 100 PV panels$199.98City of Tucson FY27 Fee Schedule (Section 4-02.9.4)
Solar Permit — Photovoltaic Electrical Systems, 101 or more PV panels$199.98 + $1.12 per panel over 100City of Tucson FY27 Fee Schedule (Section 4-02.9.5)
Supplementary Equipment for Photovoltaic Electrical Systems (service upgrades, panel relocations, EV chargers, similar)$28.09 per additional itemCity of Tucson FY27 Fee Schedule (Section 4-02.9.7)
Shade structures and solar tracking equipmentSame as Building Permit Fees for New Construction (valuation-based)City of Tucson FY27 Fee Schedule (Section 4-02.9.6)

Electric Vehicle (EV) Charger / Charging Station Permit

Verified

The City of Tucson's Planning & Development Services Department (PDSD) FY27 Fee Schedule explicitly names 'EV chargers' by name under its Photovoltaic Electrical Systems section (Section 4-02.9.7, 'Supplementary Equipment for Photovoltaic Electrical Systems (service upgrades, panel relocations, EV chargers, similar)' — $28.09 per additional item), for an EV charger installed alongside a solar PV system. A standalone EV charger installed on its own (not paired with solar) is billed under the City's general Trade Permit fee, the same mechanism documented in this file's Electrical Permit entry ($150.00 for the first item, $50.00 for each additional item). Tucson also has its own EV-Ready parking ordinance (Unified Development Code §§ 7.4.5 and 7.4.11) requiring new one-to-two family dwellings/townhouses to provide EVSE-ready circuits and setting EV-readiness percentages for new multi-family/commercial parking, which is a design-code requirement enforced at building-permit stage rather than a separate EV charger permit fee itself.

Verified 2026-07-20 · Source

Requirements

  • Trade Permit Application submitted online through Tucson Development Center (TDC) Online, specifying 'EV charger' or the applicable electrical item category and quantity, per the same process documented in this file's Electrical Permit entry
  • Governed by the 2023 NEC (including NEC Article 625, Electric Vehicle Power Transfer System) as adopted by the City
  • If the EV charger is installed as part of a solar PV/storage system permit application (via SolarApp+ or the standard PV permit path), it is billed as Supplementary Equipment under the City's Photovoltaic Electrical Systems fee category rather than as a standalone Trade Permit item
  • New one-to-two family dwellings, townhouses, and qualifying multi-family/commercial developments must independently comply with the City's EV-Ready parking requirements (UDC §§ 7.4.5, 7.4.11) at the building-permit/plan-review stage, regardless of whether a charger is installed immediately

Required documents

  • RequiredTrade Permit ApplicationSubmitted online through Tucson Development Center (TDC) Online, specifying item category ('EV charger' or equivalent electrical item) and quantity

Fee schedule

Fee typeAmountNotes
Trade Permit — first item (standalone EV charger, not paired with solar)$150.00City of Tucson FY27 Fee Schedule (Section 4-02.9.1); includes up to 1/2 hour of staff review and permit processing plus 2 inspections — same general Trade Permit mechanism documented in this file's Electrical Permit entry.
Trade Permit — each additional item beyond the first$50.00 per additional itemCity of Tucson FY27 Fee Schedule (Section 4-02.9.2)
Supplementary Equipment for Photovoltaic Electrical Systems (service upgrades, panel relocations, EV chargers, similar)$28.09 per additional itemCity of Tucson FY27 Fee Schedule (Section 4-02.9.7) — explicitly names 'EV chargers' as a qualifying item, applicable when an EV charger is added to an existing or concurrent solar PV permit rather than filed as its own standalone Trade Permit.
Digital Filing Fee1% of the total fee, minimum $18.54City of Tucson FY27 Fee Schedule (Section 4-01.5.1)

Demolition Permit

Verified

Required for interior and/or exterior demolition of any building, structure, or exterior wall in Tucson, including removal of unpermitted structures and swimming pool demolition. Fee is based on square footage of area demolished. Falls under the Fast Lane (10-business-day) review track.

Verified 2026-07-03 · Source

Requirements

  • A permit is required to partially or fully demolish a building, structure, or exterior wall, including removal of previously unpermitted structures
  • A permit is required for interior demolition affecting structural elements, load-bearing walls, or fire-rated assemblies (cosmetic removal of cabinets/flooring does not require a permit)
  • A permit is required to demolish, fill in (bury), or otherwise remove an existing swimming pool or spa; a site plan showing the location of the buried structure is required for the permanent record, and any pool fill must include structural modification for positive drainage
  • Any building, structure, site, or object 50+ years old located within a local or national register historic district, or individually listed/eligible as historic, requires a Historic Review in addition to the demolition permit
  • Special District Review is required for exterior or pool demolition if the property is in a Historic Preservation Zone or Neighborhood Preservation Zone
  • Billboard demolition is billed separately from general interior/exterior demolition
  • Falls under the Fast Lane (10-business-day performance goal) for Residential Demolition, Residential/Commercial Interior-Only Demo, Commercial Demo, and Swimming Pool Demolition

Required documents

  • RequiredDemolition Permit ApplicationCity of Tucson PDSD demolition permit application submitted via Tucson Development Center Online
  • RequiredDemolition Confirmation Notice StatementCity of Tucson PDSD form confirming demolition scope and utility disconnection
  • OptionalSite Plan (Pool Demolition only)Shows the location of a buried/filled pool or spa for the permanent property record

Fee schedule

Fee typeAmountNotes
Interior and/or Exterior Demolition$84.26 per 5,000 sq ft of area to be demolished, per floorCity of Tucson FY27 Fee Schedule (Section 4-02.11.2); additional Historic Review fees apply if the structure/site is 50+ years old and in/eligible for a historic register
Billboard Demolition$185.38City of Tucson FY27 Fee Schedule (Section 4-02.11.1); covers structural review and inspections. Additional sign-review fees apply separately per the Sign Permit Fees section
Digital Filing Fee1% of the total fee, minimum $18.54City of Tucson FY27 Fee Schedule (Section 4-01.5.1)

Fence and Wall Permit

Verified

All fences and walls in Tucson require a permit for zoning review of location, height, and distance from structures, regardless of height. Engineered structural plans are required for taller fences/walls or any wall functioning as a retaining wall. Fee is based on wall type, surface area, and linear footage. Falls under the Fast Lane (10-business-day) review track.

Verified 2026-07-03 · Source

Requirements

  • ALL fences and walls require a permit for zoning review of location, height, and distance from structures, regardless of height (unlike jurisdictions that exempt short fences entirely)
  • Engineered plans are required if the fence or wall is over 6 feet tall, or if it functions as a retaining wall by holding back soil or changing ground level
  • Special District Review is required if the property is in a Historic Preservation Zone or Neighborhood Preservation Zone
  • Shorter fences/walls may not need a full building permit or inspection, but zoning review is always required
  • Masonry (block/brick) walls and wood/metal fences are billed under separate fee line items based on different unit measures (surface area vs. linear footage)
  • Falls under the Fast Lane (10-business-day performance goal) for Residential/Commercial Fence/Wall permits

Required documents

  • RequiredFence/Wall Permit ApplicationSubmitted online through Tucson Development Center Online for zoning review of location, height, and setback
  • RequiredSite PlanShows fence/wall location, height, and distance from structures and property lines
  • OptionalEngineer-Stamped Structural DesignRequired for walls/fences over 6 feet tall or any wall functioning as a retaining wall (holding back soil or changing ground level)

Fee schedule

Fee typeAmountNotes
Masonry Walls$16.85 + $33.70 per 500 square feet of surface area, plus plan review fee at standard hourly rate (minimum 1/2 hour)City of Tucson FY27 Fee Schedule (Section 4-02.10.11)
Wood and Metal Fences$28.08 + $5.62 per 100 linear feet, plus plan review fee at standard hourly rate (minimum 1/2 hour)City of Tucson FY27 Fee Schedule (Section 4-02.10.12)
Neighborhood Preservation Zone (NPZ) fence/wall modifications and improvements, up to 400 sq ft gross floor area equivalent$33.44 staff review feeCity of Tucson FY27 Fee Schedule (Section 4-03.6.4); applies to improvements such as fences that do not have square footage in the traditional sense
Digital Filing Fee1% of the total fee, minimum $18.54City of Tucson FY27 Fee Schedule (Section 4-01.5.1)

Accessory Dwelling Unit (Casita) Permit

Verified

Accessory Dwelling Units (ADUs), locally called 'casitas,' are allowed by right in Tucson, one per residential lot. The permit includes zoning, building, and utility review and must meet applicable Accessory Dwelling Unit standards for both attached and detached units. Falls under the Fast Lane (10-business-day) review track.

Verified 2026-07-03 · Source

Requirements

  • A permit is required for any ADU/casita — defined, like any dwelling unit, as having a place to sleep, a bathroom, and a kitchen
  • Two accessory dwelling units are permitted per parcel developed with a Family Dwelling (single-family home); a parcel developed with a duplex is permitted one accessory dwelling unit. A third ADU is allowed on a lot/parcel over one acre if at least one of the ADUs on that lot is a deed-restricted affordable unit (80% of area median income or less)
  • Size: an ADU/casita is limited to 75% of the principal dwelling's gross floor area, not to exceed 1,000 sq ft of gross floor area OR up to 650 sq ft of gross floor area regardless of the principal dwelling's size, whichever is more permissive
  • Height: except as otherwise specified, an ADU/casita follows the dimensional standards of the principal (single-family) land use in the same zone — commonly a 25-foot height limit — rather than the lower 12-foot cap that applies to other accessory structures (accessory dwelling units are explicitly excepted from that 12-foot cap)
  • Setback: minimum side and rear yard setback for an ADU/casita is 5 feet
  • A cool roof (high albedo level >60 SRI, or other cool roof technology per the ICC Green Construction Code) is required if the ADU/casita is built as a new structure
  • No vehicular parking is required to be provided for ADUs/casitas
  • ADUs are not required to match the exterior design, roof pitch, or finishing materials of the primary single-family dwelling on the same lot
  • ADUs/casitas are not subject to maximum residential density standards, and are exempt from being classified as a multifamily development or requiring a commercial site plan/commercial development standards when added to an established, occupied family dwelling
  • Both attached and detached ADUs must follow these Accessory Dwelling Unit standards (Tucson Unified Development Code (UDC) Section 6.6.3.B, as amended through Ordinance 12219, 12/16/2025)
  • Permit includes zoning, building, and utility review as a bundled 'New Building/Dwelling, Development Package, Accessory Dwelling Unit' permit type
  • A dedicated Accessory Dwelling Unit checklist is published separately from the general New Dwelling and Addition/Alteration checklists
  • Falls under the Fast Lane (10-business-day performance goal) as 'Residential ADU / Casita'

Required documents

  • RequiredResidential Building Permit Application Checklist - Accessory Dwelling UnitCity of Tucson PDSD checklist specific to ADU/casita submittals, separate from the New Dwelling and Addition/Alteration checklists
  • RequiredConstruction DrawingsSite plan and floor/framing plans showing the ADU's compliance with size, height, and setback standards

Fee schedule

Fee typeAmountNotes
Building Permit Fee (valuation-based, same Construction Valuation Table as new construction)$89.45 minimum ($1-$2,000 valuation), scaling per the Building Permit Fees for New Construction tableCity of Tucson FY27 Fee Schedule (Section 4-02.4); ADUs are billed as new dwelling construction, not under a separate ADU-specific fee line
Digital Filing Fee1% of the total fee, minimum $18.54City of Tucson FY27 Fee Schedule (Section 4-01.5.1)

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tucson building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-03)Later version (2026-08-01) →View current record →All versions →