You are viewing the permanent link for the record currently in effect, published 2026-07-06.
Casa Grande building permits
VerifiedCasa Grande, Arizona — as published 2026-07-06.
Verified 2026-07-06 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new single-family and two-family dwelling construction in the City of Casa Grande. Reviewed against the 2018 IRC and City of Casa Grande amendments under Title 15, plus the City's Building and Technical Administrative Code (CG-BTAC, 2019 Edition as amended 2022). Applications are submitted at the Development Center (510 E. Florence Blvd.).
Verified 2026-07-06 · Source
Requirements
- Building permit required for new single-family and two-family dwelling construction within Casa Grande city limits
- Plans must comply with the 2018 IRC and City of Casa Grande amendments, including the Quick Codes Design Criteria (115 mph ultimate wind speed, Exposure C; Seismic Design Category B; 34°F winter design temperature; heavy termite potential requiring a certificate of soil treatment; 0-inch frost line depth)
- Structural design criteria for buildings under the IBC must be performed in accordance with IBC Chapter 16, ASCE 7-16, and a project-specific geotechnical investigation (design criteria must be site-specific)
- Owner may act as their own contractor via a signed owner-builder affidavit, or must use Arizona-licensed contractors
- Building Permit Application submitted to the Development Center; review of the project does not commence until the plan review fee has been paid in full
- A City business license is required to conduct business at the permitted location
Required documents
- RequiredBuilding Permit ApplicationCity of Casa Grande Building Permit Application, submitted to the Development Center at 510 E. Florence Blvd.
- RequiredSite/Plot PlanLot dimensions, easements, setbacks, and structure locations
- RequiredConstruction Drawings and Structural CalculationsSite-specific structural design per IBC Chapter 16 / ASCE 7-16 and project geotechnical investigation
- OptionalQuick Codes Design Criteria ReferenceCity of Casa Grande Building Department reference handout (rev. 11/8/2024) listing IRC Table R301.2(1) climatic/geographic design criteria and ACCA Manual J design criteria to be referenced on plan cover sheets
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — Residential Minimum Fee ($1-$1,000 valuation) | $60.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule (effective 7/1/2025), Building Permit Fees, Residential and Commercial Construction table |
| Building Permit Fee — $1,001-$10,000 valuation | $100.00 for first $1,000, plus $10.00 for each additional $1,000 or fraction thereof to $10,000 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule |
| Building Permit Fee — $10,001-$50,000 valuation | $240.00 for first $10,000, plus $9.00 for each additional $1,000 or fraction thereof to $50,000 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule |
| Building Permit Fee — $50,001-$200,000 valuation | $600.00 for first $50,000, plus $8.00 for each additional $1,000 or fraction thereof to $200,000 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule |
| Building Permit Fee — $200,001-$1,000,000 valuation | $1,800.00 for first $200,000, plus $7.00 for each additional $1,000 or fraction thereof to $1,000,000 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule |
| Building Permit Fee — $1,000,001-$10,000,000 valuation | $7,400.00 for first $1,000,000, plus $6.00 for each additional $1,000 or fraction thereof to $10,000,000 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule |
| Building Permit Fee — over $10,000,000 valuation | $61,400.00 for first $10,000,000, plus $5.00 for each additional $1,000 on the total project valuation | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule; Maximum Building Permit Fee is capped at $150,000.00 regardless of valuation |
| Residential Standard Plan Review | 65% of the construction value per the ICC valuation table or a signed construction contract | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule, Basic Plan Review Services |
| Occupancy Permit | $100.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule |
Residential Addition / Remodel / Minor Alteration Permit
VerifiedRequired for room additions, remodels, and other alterations to existing one- and two-family dwellings in Casa Grande. Reviewed against the 2018 IRC as adopted and amended by the City. Classified as 'Addition/Alterations' on the City's A.R.S. § 9-835 review timeframe chart.
Verified 2026-07-06 · Source
Requirements
- Building permit required for room additions, remodels, and alterations to existing single- and two-family residences
- Detached accessory structures 200 sq ft or less (residential) with no utility connections (electric, water, sewer) do not require a building permit, but Planning Department approval is still required for size/height/setback compliance
- Site Plan Review fee applies for new construction and additions to Single Family and Duplex properties, and separately for Residential Accessory Structures 200 sq ft or less
- Plans must comply with City of Casa Grande Design Criteria (115 mph Vult wind, Exposure C; Seismic Design Category B)
- Owner may self-contract via signed owner-builder affidavit or must use Arizona-licensed contractors
Required documents
- RequiredBuilding Permit ApplicationSubmitted to the Development Center, 510 E. Florence Blvd.
- RequiredSite/Plot PlanShowing existing structure, addition footprint, and setbacks
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Site Plan Review — New construction and additions, Single Family and Duplex | $150.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule, Basic Plan Review Services |
| Site Plan Review — Residential Accessory Structure, 200 sq ft or less | $50.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule |
| Building Permit Fee (Addition/Remodel, Based on Valuation) | Per the Residential and Commercial Construction valuation table (Residential Minimum Fee $60.00 for $1-$1,000; scaling tiers to $150,000 maximum fee) | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule, Building Permit Fees — same valuation table as new construction, based on the value of the addition/remodel work or a signed contract, whichever is less |
| Residential Deferred Plan Review | $75.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule |
| Minor Revisions of Plans after Permit Issuance, Residential | $25.00 per page | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule |
Commercial Building Permit
VerifiedRequired for new commercial/industrial construction, major additions, minor alterations, and tenant improvements (TI) in Casa Grande. Reviewed against the 2018 IBC and City of Casa Grande amendments under Title 15, plus the City's Building and Technical Administrative Code (CG-BTAC, 2019 Edition as amended 2022). Tenant-improvement work is NOT a separate permit product -- it is folded into this same Commercial Building Permit process, using the same Building Permit Application and the same valuation-based Building Permit Fee table documented below. The only place TI is broken out at all is on the City's own A.R.S. Section 9-835 review-timeframe chart, which gives 'Change of Occupancy / Major Alteration / T.I.' its own (faster) review track than ground-up 'New Construction / Major Addition' -- see reviewTimelineNote.
Verified 2026-07-29 · Source
Requirements
- Building permit required for new commercial/industrial construction, major additions, minor alterations/accessory buildings, and tenant improvements within Casa Grande city limits
- Plans must comply with the 2018 IBC and City of Casa Grande amendments under Title 15, plus the 2019 CG-BTAC (as amended 2022, Resolution 5170/5397)
- Structural design for IBC-designed buildings must be site-specific, performed in accordance with IBC Chapter 16, ASCE 7-16, and a project-specific geotechnical investigation (Quick Codes Design Criteria Handout: 115 mph Vult wind, Exposure C; Seismic Design Category B; 0 psf ground snow load)
- Accessibility must comply with the adopted 2009 ICC A117.1 Accessible and Usable Buildings and Facilities standard
- Any new business location, change of ownership, or change of use requires a joint occupancy inspection conducted by BOTH the Building Department and the Fire Department before occupancy is authorized -- confirm the proposed use is allowed in the zoning district (email cgplanning@casagrandeaz.gov or request a Zoning Verification Letter) BEFORE signing a lease
- Fire-protection scope (sprinkler, alarm, standpipe, fire pump) is reviewed and permitted separately by the Fire Prevention Division under its own Fire Department Permit Application -- see this file's fire-sprinkler-alarm-permit entry
- Building Permit Application submitted to the Development Center (510 E. Florence Blvd.) or by email to dcpermits2@gmail.com; review of the project does not commence until the plan review fee has been paid in full
- A City business license is required to conduct business at the permitted location
Required documents
- RequiredBuilding Permit ApplicationCity of Casa Grande Building Permit Application (CDP- form). The live DocumentCenter link for this form returned a 404 at time of this review; a January 2026 Wayback Machine snapshot was previously used to confirm the form's existence for this file's certificate-of-occupancy-permit entry. Obtain the current form directly from the Development Center (520-421-8630 / dcpermits2@gmail.com) if the live link is still down.
- RequiredSite/Plot PlanLot dimensions, easements, setbacks, and structure locations. Per third-party guidance (not a City-published source), interior tenant-improvement/remodel work for Commercial, Industrial, Institutional, Utility, and Public uses may not require a new site plan if construction does not change the occupancy classification or increase parking requirements -- confirm this directly with the Development Center before assuming a TI project can skip the site plan.
- RequiredConstruction Drawings and Structural CalculationsSite-specific structural design per IBC Chapter 16 / ASCE 7-16 and project geotechnical investigation
- OptionalFire protection / life-safety plansRequired when the project scope includes fire sprinkler, fire alarm, standpipe, or fire pump work -- submitted under a separate Fire Department Permit Application to the Fire Prevention Division (see this file's fire-sprinkler-alarm-permit entry)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Commercial Base Fee ($1-$1,000 valuation) | $150.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule (effective 7/1/2025), Building Permit Fees, 'Residential and Commercial Construction' table -- the commercial base fee at this bottom tier ($150.00) is distinct from and higher than the Residential Minimum Fee ($60.00) documented in this file's residential-building-permit entry; all higher valuation tiers above $1,000 use the same shared table for both residential and commercial |
| Building Permit Fee — $1,001-$10,000 valuation | $100.00 for first $1,000, plus $10.00 for each additional $1,000 or fraction thereof to $10,000 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule, shared Residential and Commercial Construction table |
| Building Permit Fee — $10,001-$50,000 valuation | $240.00 for first $10,000, plus $9.00 for each additional $1,000 or fraction thereof to $50,000 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule |
| Building Permit Fee — $50,001-$200,000 valuation | $600.00 for first $50,000, plus $8.00 for each additional $1,000 or fraction thereof to $200,000 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule |
| Building Permit Fee — $200,001-$1,000,000 valuation | $1,800.00 for first $200,000, plus $7.00 for each additional $1,000 or fraction thereof to $1,000,000 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule |
| Building Permit Fee — $1,000,001-$10,000,000 valuation | $7,400.00 for first $1,000,000, plus $6.00 for each additional $1,000 or fraction thereof to $10,000,000 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule |
| Building Permit Fee — over $10,000,000 valuation | $61,400.00 for first $10,000,000, plus $5.00 for each additional $1,000 on the total project valuation | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule; Maximum Building Permit Fee is capped at $150,000.00 regardless of valuation |
| Building Plan Review | 65% of the building permit fee | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule, Basic Plan Review Services section -- this is the generic 'Building Plan Review' line (distinct from the separately-labeled 'Residential Standard Plan Review' line used in this file's residential-building-permit entry, though both compute to the same 65% rate) |
| Commercial Deferred Plan Review | $150.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule, Basic Plan Review Services section |
| Re-review of Denied Permit Application | 50% of original plan review fee | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule |
| Expedited Plan Review | 100% increase of plan review fee | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule |
| Minor Revisions of Plans after Permit Issuance — Commercial | $50.00 per page | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule (residential equivalent is $25.00 per page) |
| 3rd Party consulting and review of commercial/industrial plans | $0.00 as printed in the fee schedule | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule literally prints '$0.00' for this line item, which appears inconsistent with the same document's separate Fire Permits section, where an analogous 'Fire Plan Review — 3rd-party consulting and review' line is billed at 'Actual cost plus 30%' (documented in this file's fire-sprinkler-alarm-permit entry). Reported here exactly as printed rather than corrected/estimated -- confirm the actual rate with the Development Center (520-421-8630) before assuming 3rd-party commercial/industrial plan review is genuinely free. |
| Site Plan Review — Commercial Accessory Structure, 100 sq ft or less | $100.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule, Basic Plan Review Services section |
Electrical Permit
VerifiedRequired for electrical installation, alteration, or repair work in Casa Grande, governed by the 2017 National Electrical Code (NEC) as adopted and amended by the City. Billed as a flat fee per the Consolidated Fee Schedule's 'Electrical, Mechanical, Plumbing Permit' category.
Verified 2026-07-06 · Source
Requirements
- Electrical permit required for panel work, service changes, wiring, and other hard-wired electrical work
- Governed by the 2017 NEC as adopted by the City of Casa Grande
- Arc-fault and tamper-resistant outlet protection required at most locations per the 2017 NEC
- Apply at the Development Center, 510 E. Florence Blvd.
Required documents
- RequiredBuilding/Electrical Permit ApplicationSubmitted at the Development Center
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical, Mechanical, Plumbing Permit — Residential | $75.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule, 'Electrical, Mechanical, Plumbing Permit' category (flat fee, single fee line covers electrical/mechanical/plumbing residential trade permits; a prior 'Low Voltage' sub-line was struck through/removed in the FY2026 schedule) |
| Electrical, Mechanical, Plumbing Permit — Commercial | $300.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule |
| Gas and Electric Reconnect Inspection | $40.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule, Inspection Charges |
Plumbing Permit
VerifiedRequired for plumbing installation, alteration, or repair work in Casa Grande, governed by the 2018 International Plumbing Code (IPC) as adopted and amended by the City. Includes gas line repair/replacement, which requires City inspection before the gas utility restores service.
Verified 2026-07-06 · Source
Requirements
- Plumbing permit required for installation, alteration, or repair of plumbing systems, fixtures, water heaters, and gas piping
- Governed by the 2018 IPC and 2018 IFGC as adopted by the City of Casa Grande
- Gas water heaters require high/low combustion air supply at a rate of 1 sq in per 2,000 Btu (Quick Codes handout)
- Gas line repair/replacement requires a City permit and inspection before the gas company will restore service; submit a sketch showing line location, depth, pipe size, and materials
- Apply at the Development Center, 510 E. Florence Blvd.
Required documents
- RequiredBuilding/Plumbing Permit ApplicationSubmitted at the Development Center
- OptionalGas line sketchRequired for gas line repair/replacement permits: line location, depth, pipe size, and materials
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical, Mechanical, Plumbing Permit — Residential | $75.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule (consolidated flat-fee category covering residential plumbing/electrical/mechanical single-trade permits) |
| Electrical, Mechanical, Plumbing Permit — Commercial | $300.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule |
| Gas and Electric Reconnect Inspection | $40.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule, Inspection Charges |
Mechanical / HVAC Permit
VerifiedRequired for heating, ventilation, and air conditioning installations in Casa Grande, governed by the 2018 International Mechanical Code (IMC) as adopted and amended by the City. New and replacement HVAC equipment must be sized per ACCA Manual J & S with minimum efficiency thresholds published by the Building Department.
Verified 2026-07-06 · Source
Requirements
- Mechanical permit required for installation, replacement, or relocation of HVAC equipment, furnaces, and ventilation systems
- Governed by the 2018 IMC as adopted by the City of Casa Grande
- New and replacement HVAC must be sized per ACCA Manual J & S: gas furnaces and boilers minimum 80% AFUE; air conditioners and heat pumps minimum 14 SEER
- Duct sizing/insulation per ACCA Manual D: R-8 within attics or exterior of building, R-6 within other portions of the building
- Attic/crawl space venting requires 1 sq ft of vent per 150 sq ft of space served
- Apply at the Development Center, 510 E. Florence Blvd.
Required documents
- RequiredBuilding/Mechanical Permit ApplicationSubmitted at the Development Center
- RequiredACCA Manual J & S Load CalculationsRequired for sizing new or replacement HVAC equipment per the City's Residential Energy Efficiency Design Minimums
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical, Mechanical, Plumbing Permit — Residential | $75.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule (consolidated flat-fee category covering residential mechanical/electrical/plumbing single-trade permits) |
| Electrical, Mechanical, Plumbing Permit — Commercial | $300.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule |
Re-Roofing Permit
VerifiedRequired for residential and commercial re-roofing in Casa Grande, governed by the 2018 IBC/IRC roofing provisions. The City offers both an in-person-inspection track and a lower-cost drone-inspection track, each billed as a flat fee inclusive of plan review.
Verified 2026-07-06 · Source
Requirements
- Building permit required for re-roofing (Casa Grande does not publish a like-for-like no-permit exemption comparable to some other Arizona cities; confirm scope-specific exemptions directly with the Development Center)
- Maximum of two layers of roof covering permitted; no more than two total layers of any roofing material may be applied
- Ice barrier underlayment is not required per the City's adopted design criteria (consistent with Casa Grande's desert climate — no ice-shield requirement)
- Applicant chooses between an in-person building inspection track or a drone building inspection track at time of permit application; both include plan review in the flat fee
Required documents
- RequiredBuilding Permit Application (Re-Roofing)Submitted at the Development Center, 510 E. Florence Blvd.
- RequiredRoof plan/material listingExisting framing, square footage, existing material/weight, proposed material/weight, and roof slope
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Roofing permit requiring in-person building inspections (includes plan review) | $125.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule, Building Permit Fees section |
| Roofing permit requiring drone building inspections (includes plan review) | $400.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule |
Residential Solar Photovoltaic (PV) / Battery ESS Permit
VerifiedRequired for installation of rooftop residential solar photovoltaic systems (or battery energy storage systems) in Casa Grande. Solar permits are billed as a flat fee under the Solar System Permits category of the Consolidated Fee Schedule, drawn from the Building Permit Fee table. Applications are processed through the Land Use Application Processing system as 'Solar (Photovoltaic or Battery/ESS)'.
Verified 2026-07-06 · Source
Requirements
- Residential solar photovoltaic and battery/ESS systems require a building/electrical permit reviewed under the 2017 NEC and 2018 IBC/IRC as adopted by the City of Casa Grande
- Construction plans required: site plan, roof layout, racking layout, attachment details, and electrical one-line diagram
- Cut sheets required for PV panels, inverters, and racking/mounting system
- Apply via the City's online Land Use Application Processing system, listed under 'Solar (Photovoltaic or Battery/ESS)'
Required documents
- RequiredSolar Permit ApplicationCity of Casa Grande solar/battery-ESS permit application, submitted via the Land Use Application Processing system or at the Development Center
- RequiredConstruction plan setSite plan, roof layout, racking/attachment details, electrical one-line diagram, and manufacturer cut sheets for panels/inverters/racking
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar System Permit — Residential | $200.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule, 'Solar System Permits (from building permit fee table)' section — flat fee, distinct from the general valuation-based Building Permit Fee table |
| Solar System Permit — Commercial | $400.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule |
| Refund — Residential solar permit withdrawn before plan review has started | $100.00 refund amount (not the fee itself) | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule, Refunds for Solar Permits section |
Demolition Permit
VerifiedRequired for demolition of any residential or commercial structure in Casa Grande. Billed as a flat fee and classified under the Miscellaneous category on the City's A.R.S. § 9-835 review timeframe chart, alongside single-trade permits.
Verified 2026-07-06 · Source
Requirements
- Building permit required before demolishing a residential or commercial structure within Casa Grande city limits
- Site plan required showing lot dimensions and location of the building to be demolished, plus other existing structures
- Coordination with Pinal County Air Quality Control District (asbestos/NESHAP requirements) is expected prior to demolition, consistent with Arizona state and federal asbestos abatement rules for structure demolition
- Project is not legally complete until an approved final inspection has occurred
Required documents
- RequiredBuilding Permit Application (Demolition)Submitted at the Development Center, 510 E. Florence Blvd.
- RequiredSite PlanShowing the structure to be demolished and other existing structures on the parcel
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition Permit | $100.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule, Building Permit Fees section (flat fee) |
EV Charger / EVSE Permit
VerifiedCasa Grande has no standalone EV-charger/EVSE permit type or fee line item. Installing electric vehicle charging equipment (e.g., a dedicated 240V Level 2 circuit or panel/service work to support a charger) is electrical work, governed by the 2017 National Electrical Code (NEC) as adopted by the City, and is billed under the same flat 'Electrical, Mechanical, Plumbing Permit' consolidated fee category documented in this file's own electrical-permit entry -- not a distinct EV-charger line item. The City's FY 2025-2026 Consolidated Fee Schedule and Building Department page were checked directly and contain no EV-charger, EVSE, or electric-vehicle-specific fee or process, and no evidence was found that Casa Grande participates in SolarAPP+ (gosolarapp.org) or another instant/automated EV-charger permitting platform as of this review.
Verified 2026-07-20 · Source
Requirements
- EV charger circuit installation is electrical work; apply at the Development Center, 510 E. Florence Blvd., using the standard Building/Electrical Permit Application
- Governed by the 2017 NEC as adopted by the City of Casa Grande, including arc-fault and tamper-resistant outlet protection requirements at most locations
- Billed under the flat consolidated 'Electrical, Mechanical, Plumbing Permit' fee category (no distinct EV-charger tier), same as any other single-trade electrical permit
- Classified as a 'Single Trade (MPE Permit)' under the Miscellaneous category on the City's A.R.S. Section 9-835 review timeframe chart, same as general electrical permits
Required documents
- RequiredBuilding/Electrical Permit ApplicationSubmitted at the Development Center for the EV charger circuit's electrical scope
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical, Mechanical, Plumbing Permit — Residential (EV charger installation) | $75.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule, 'Electrical, Mechanical, Plumbing Permit' category -- no distinct EV-charger line item exists; billed as a flat single-trade electrical permit fee, same as documented in this file's electrical-permit entry |
| Electrical, Mechanical, Plumbing Permit — Commercial (EV charger installation) | $300.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule; applies for commercial/multi-unit EV charging station installations |
| Gas and Electric Reconnect Inspection | $40.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule, Inspection Charges; may apply if service reconnection is needed as part of the charger installation |
Sign Permit (Commercial/Business Signage)
VerifiedRequired for new building or site signage in Casa Grande, including wall signs, monument signs, and other permanent commercial signage, reviewed against the City's Sign Code (Casa Grande Code of Ordinances Title 17, Article III. Signs) by the Planning & Development Department at the Development Center. Billed per square foot of sign area with a stated minimum, per the City's own Sign Permit Application -- the FY2025-2026 Consolidated Fee Schedule itself does not print a dollar figure for this line item and instead defers to 'See Description.'
Verified 2026-07-23 · Source
Requirements
- A Sign Permit is required before installing new building or site signage (wall signs, monument signs, and other permanent signage); painted and window signs are also referenced on the City's sign guidance
- Governed by the City's Sign Code (Title 17 Zoning, Article III. Signs) and the adopted 2018 IBC as amended by the City
- Landlord approval documentation is required for signage at multi-tenant/leased sites
- A structural footing detail is required for monument signs; wall signs require horizontal/vertical dimensions of the sign band area or wall space
- A City business license is required to conduct business at the permitted location
- Temporary/promotional signs and banners are limited to 4 occurrences per year for 14-day periods each, per Sign Code Section 604, and are reviewed on a separate 'Promotional Sign / Banner' track from a permanent Sign Permit
- Planned shopping centers and other multi-tenant developments seeking a master sign program apply separately for a Comprehensive Sign Plan land-use entitlement, distinct from an individual building-level Sign Permit
Required documents
- RequiredSign Permit ApplicationCity of Casa Grande Building Permit Application family (CDP- form), Sign Permit Application variant, submitted to the Development Center at 510 E. Florence Blvd. or by email to dcpermits2@gmail.com
- RequiredSite planFor wall signs: linear footage of front elevation and building setback from right-of-way. For monument signs: location, parcel dimensions, separation from existing signs, and setback from right-of-way
- RequiredSign elevation/dimension drawingsHorizontal and vertical dimensions of the sign band area or wall/monument space, lettering details, colors, and attachment method
- RequiredColor copy of sign superimposed onto the building or monumentDigital color rendering showing the proposed sign in context
- OptionalLandlord approval documentationRequired for signage at leased/multi-tenant sites
- OptionalMonument structural footing detailsOverall dimensions of the monument and structural footing details
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Sign Permit (wall, monument, or other permanent signage) | $4.00 per square foot of sign area, $150.00 minimum | City of Casa Grande Sign Permit Application (fee panel printed on the application form itself); the FY2025-2026 Consolidated Fee Schedule's own 'Sign Permit' line item prints 'See Description' rather than a dollar figure, so the Sign Permit Application is the only document found with an actual rate |
| Kiosk Sign — Per Panel Monthly Permit | Not published as a dollar figure | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule lists this line item with no rate shown (blank); could not be recovered from the Sign Permit Application either -- confirm current rate directly with the Development Center (520-421-8630) before applying |
| Kiosk Sign — Per Panel Annual Permit | See Description | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule; no further description or rate table was located for this line item during this review |
| Comprehensive Sign Plan (Land Use Application — master sign program for planned shopping centers/multi-tenant developments) | $1,050.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule, Land Use Applications/Projects section -- this is a separate Planning entitlement application, not the standard building-level Sign Permit |
Fire Sprinkler & Fire Alarm Permit
VerifiedRequired for installation of automatic fire sprinkler systems (NFPA 13/13R), fire alarm and detection systems, standpipe systems, and related fire-suppression water-supply equipment (fire pumps, suction tanks) in Casa Grande. Reviewed directly by the City of Casa Grande Fire Department's own Fire Prevention Division (headed by a Fire Marshal) against the 2018 International Fire Code (IFC) as adopted and amended by the City -- Casa Grande does not defer fire plan review to Pinal County. Applications and plans are submitted through the 'Development Center - Fire' using a single combined Fire Department Permit Application that itemizes sprinkler, standpipe, fire pump, and fire alarm fees together, so this file uses one combined permit-type entry rather than splitting sprinkler and alarm into separate products.
Verified 2026-07-23 · Source
Requirements
- A Fire Department Permit is required before installing automatic fire sprinkler systems, fire alarm/detection systems, standpipe systems, fire pumps, or fire-suppression suction tanks
- Reviewed by the City of Casa Grande Fire Department Fire Prevention Division against the 2018 IFC as adopted and amended by the City under Title 15
- All fire permits require a Fire Site Plan showing fire department access roads/grade, hydrant locations, all buildings on the site with square footage, FDC location, tanks, utilities, gates, and any access obstructions
- Hydraulic calculations are required for sprinkler systems whenever 15 or more heads are being added (including exactly 15), per NFPA 13 Section 8.15.20.5.2, as referenced on the City's Fire Department Permit Application
- Fire alarm plans require a scaled floor plan with alarm initiating/signaling device locations, the fire alarm control panel and annunciator location(s), battery/voltage-drop calculations, manufacturer specification sheets for all devices, and an electrical riser diagram
- One set of plans and supporting documents must be submitted electronically to the Development Center - Fire (dcpermits2@gmail.com)
- Permits become void if work is not commenced within 180 days, or if suspended/abandoned for 180 days after work has commenced
Required documents
- RequiredFire Department Permit ApplicationCity of Casa Grande Fire Department Permit Application (CDP- form, 'Development Center - Fire'), submitted at 510 E. Florence Blvd. or by email to dcpermits2@gmail.com
- RequiredFire Site PlanFire department access roads/grade, hydrant locations, all buildings with square footage, FDC location, tanks, utilities, gates, and access obstructions
- OptionalSprinkler plansFull-height cross section/schematic, ceiling construction, room occupancy, sprinkler head make/model/type, manufacturer data sheets, hydraulic calculations (required for 15+ added heads), hazard classification, and system type (wet/dry/anti-freeze)
- OptionalFire alarm plansScaled floor plan with device/control panel/annunciator locations, battery/voltage-drop calculations, manufacturer spec sheets, and electrical riser diagram
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Development Center Processing Fee (Fire Permits) | $35.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule, Fire Permits section |
| Sprinkler Permit — Minimum fee, first 1,000 sq ft (includes plan review, hydrostatic test, and final inspection) | $175.00 | City of Casa Grande Fire Department Permit Application (rev. 8/2025); matches the FY2025-2026 Consolidated Fee Schedule's 'Automatic Fire Extinguishing Systems... Minimum fee (first 1,000 sq ft)' line |
| Sprinkler Permit — Each additional sq ft | $0.01 | City of Casa Grande Fire Department Permit Application (rev. 8/2025) |
| Sprinkler Permit — Each additional floor level above or below grade | $175.00 | City of Casa Grande Fire Department Permit Application (rev. 8/2025) |
| Automatic Fire Extinguishing Systems (category headline fee, Commercial/Multi-family NFPA 13 & 13R) | $250.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule prints this as a headline/category figure separate from the itemized minimum-fee-plus-increments breakdown above; the Fire Department's own current Permit Application does not carry a matching $250 line item. Both figures are reported here since the two official documents do not reconcile -- confirm which governs with Development Center - Fire before applying |
| Sprinkler Systems, Tenant Improvements — 1 to 20 heads | $150.00 | City of Casa Grande Fire Department Permit Application (rev. 8/2025). NOTE: the FY2025-2026 Consolidated Fee Schedule (effective 7/1/2025) instead prints $105.00 for this same 1-20-head tier -- the two official City documents disagree; the Permit Application is dated more recently (August 2025) and is used here, but confirm the operative rate with Development Center - Fire before applying |
| Sprinkler Systems, Tenant Improvements — 21 to 50 heads | $160.00 | City of Casa Grande Fire Department Permit Application (rev. 8/2025); matches the Consolidated Fee Schedule |
| Sprinkler Systems, Tenant Improvements — 51 to 100 heads | $185.00 | City of Casa Grande Fire Department Permit Application (rev. 8/2025); matches the Consolidated Fee Schedule |
| Sprinkler Systems, Tenant Improvements — 101 to 500 heads | $265.00 | City of Casa Grande Fire Department Permit Application (rev. 8/2025); matches the Consolidated Fee Schedule |
| Sprinkler Systems, Tenant Improvements — Each additional 500 heads or fraction thereof | $160.00 | City of Casa Grande Fire Department Permit Application (rev. 8/2025); matches the Consolidated Fee Schedule |
| Standpipe Systems — Up to 4 standpipes | $200.00 | City of Casa Grande Fire Department Permit Application (rev. 8/2025); matches the Consolidated Fee Schedule |
| Standpipe Systems — Each additional standpipe | $50.00 | City of Casa Grande Fire Department Permit Application (rev. 8/2025); matches the Consolidated Fee Schedule |
| Fire Pumps — One fire pump (includes plan review, inspection, and flow test) | $275.00 | City of Casa Grande Fire Department Permit Application (rev. 8/2025). The FY2025-2026 Consolidated Fee Schedule prints 'Removed increase' in this cell instead of a dollar figure (an FY2026 fee-freeze notation), so the Permit Application is the only document with an actual number |
| Fire Pumps — Each additional pump / Install one suction tank | $175.00 each | City of Casa Grande Fire Department Permit Application (rev. 8/2025); matches the Consolidated Fee Schedule's Tanks 'Installation' line |
| Fire Alarm Permit — 1-500 sq ft | $140.00 | City of Casa Grande Fire Department Permit Application (rev. 8/2025); matches the Consolidated Fee Schedule |
| Fire Alarm Permit — 501-9,999 sq ft | $210.00 | City of Casa Grande Fire Department Permit Application (rev. 8/2025); the Consolidated Fee Schedule's own layout splits this same $210 rate across two overlapping-looking sub-rows (500-2,000 sq ft and 2,000-10,000 sq ft), consistent with the Permit Application's single 501-9,999 sq ft tier once the duplicate row is resolved |
| Fire Alarm Permit — 10,000-51,999 sq ft | $315.00 | City of Casa Grande Fire Department Permit Application (rev. 8/2025); matches the Consolidated Fee Schedule |
| Fire Alarm Permit — 52,000 sq ft and up | $420.00 | City of Casa Grande Fire Department Permit Application (rev. 8/2025); matches the Consolidated Fee Schedule |
| Fire Plan Review — In-house hourly rate | $100.00/hour | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule / Fire Department Permit Application |
| Fire Plan Review — 3rd-party consulting and review | Actual cost plus 30% | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule |
| Fire Plan Review — Expedited review (additional) | $400.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule |
| Fire Re-inspection Fee (work not ready/incomplete/incorrect at scheduled re-inspection) | $55.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule, Fire Inspection Fees section -- one rough-in inspection, one re-inspection, and one final inspection are included with each permit issued; this fee applies only to a further re-inspection when work is found not ready |
Certificate of Occupancy / Change of Occupancy Permit
VerifiedRequired whenever a building in Casa Grande is occupied for the first time, or when there is a change of tenancy, ownership, or use of an existing building or tenant space. Governed by Casa Grande Code of Ordinances Title 15, Article IV (Issuance of Building Permits and Certificates of Occupancy). Any new business location, change of ownership, or change of use requires an occupancy inspection conducted jointly by the Building Department and the Fire Department before occupancy is authorized. Casa Grande runs two distinct tracks: a construction-involved 'Change of Occupancy / Major Alteration / T.I.' commercial building permit, and a no-construction 'Change of Occupancy Permit' (billed as the flat-fee Occupancy Permit) for a simple tenant, ownership, or use change to an already-code-compliant space.
Verified 2026-07-23 · Source
Requirements
- A Certificate of Occupancy (or Occupancy Permit) is required for each new occupancy of a building; a change of tenancy, ownership, or use of an existing building may also require a new Certificate of Occupancy or Occupancy Permit to be issued
- Any new business location, change of ownership, or change of use requires an occupancy inspection conducted by BOTH the Building Department and the Fire Department, per the City's own 'Determining if Your New Business Location Meets Planning & Building Requirements' guidance
- A change of occupancy/use accompanied by construction, tenant-improvement work, or an occupancy-classification change is processed as the Commercial/Industrial 'Change of Occupancy / Major Alteration / T.I.' building permit, using the standard Building Permit Application and the valuation-based Building Permit Fee table documented in this file's residential-building-permit and electrical-permit entries
- A change of occupancy/use with no construction work (simple tenant, ownership, or use change verifying the existing building still meets code) is processed under the Miscellaneous 'Change of Occupancy Permit' track at the flat Occupancy Permit fee
- Confirm the proposed use is allowed in the applicable zoning district BEFORE signing a lease or applying -- email the Planning Department or request a Zoning Verification Letter
- A City business license is required to conduct business at the permitted location
- A Certificate of Occupancy issued together with a new building permit carries no separate charge; Temporary and Partial Certificates of Occupancy are billed as standalone line items
Required documents
- RequiredBuilding Permit ApplicationCity of Casa Grande Building Permit Application (CDP- form), marking 'Tenant Improvement' or the applicable purpose-of-work box, with the Building Use/Occupancy (Commercial) existing-use, new-use, and occupant-load fields completed
- OptionalSite/floor plan showing existing and proposed occupancy/useRequired when construction or a layout change accompanies the change of use
- OptionalZoning Verification Letter or Zoning Compliance LetterRecommended pre-application step confirming the proposed use is allowed in the zoning district before signing a lease
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Certificate of Occupancy issued in conjunction with a building permit | No charge, included in permit | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule |
| Temporary Certificate of Occupancy | $200.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule |
| Partial Certificate of Occupancy (each) | $200.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule |
| Occupancy Permit (standalone change of occupancy/tenancy/use, no construction) | $100.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule; this is the fee tied to the Miscellaneous 'Change of Occupancy Permit' review track |
| Zoning Verification Letter | $50.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule, Administrative Permits section -- recommended pre-application step to confirm a proposed use is allowed |
| Zoning Compliance Letter | $200.00 | City of Casa Grande FY 2025-2026 Consolidated Fee Schedule, Administrative Permits section |
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Casa Grande building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.