Skip to main content
PermitBase

Casa Grande building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Casa Grande, Arizona.

Last verified 2026-07-06 · Source · Embed this page’s badge · Version history

Building department

Address
510 E. Florence Boulevard, Casa Grande, AZ 85122
Phone
520-421-8630
Office hours
Monday - Friday, 7:30 a.m. - 5 p.m. The Development Center is a 'one-stop shop' for building, engineering, fire, and planning plan review/permits/inspections. Building inspections are scheduled online through the WebPermits portal (rogue.casagrandeaz.gov/WebPermits); the City does not offer same-day inspections unless the request is received by 11:59 p.m. the prior business day, and inspectors run routes between 6 a.m. and 3:30 p.m.

Inspection guide

See how inspections work in Casa Grande — sequence, scheduling & re-inspection fees.

Codes adopted

Arizona has no statewide building code for non-state buildings; codes are adopted locally. According to the International Code Council, codes are adopted locally in Arizona and are predominantly the I-codes, with different cities and counties choosing their own editions and local amendments. The Arizona State Fire Code (adopting the 2018 IFC) applies only to state and county buildings, public and private schools, and non-residential occupancies in areas without a locally adopted fire code — it does not establish a statewide residential or commercial building code floor. Each city and county adopts its own code editions independently, resulting in different I-Code years and amendment sets across jurisdictions. There is no state-mandated minimum edition; enforcement is entirely local. Always confirm the adopted edition and any local amendments with the specific jurisdiction before submitting plans.

  • Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 9). The City of Casa Grande runs its own Planning & Development Department / Development Center and independently adopts and administers its own construction codes under Title 15 (Buildings and Construction) of the Casa Grande Code of Ordinances; it does not defer permitting to Pinal County. Source: City of Casa Grande Building page (casagrandeaz.gov/231/Building) and Casa Grande Code of Ordinances Title 15.
  • 2018 International Building Code (IBC), adopted by reference with City of Casa Grande amendments (Casa Grande Code of Ordinances § 15.08.010), made a public record by Resolution No. 5170. Source: City of Casa Grande Quick Codes Design Criteria Handout (Building Department, rev. 11/8/2024) and Casa Grande Code of Ordinances § 15.08.010, International Building Code.
  • 2018 International Residential Code (IRC), adopted by reference with City of Casa Grande amendments under Title 15. Climatic and geographic design criteria (IRC Table R301.2(1)) are published separately by the Building Department. Source: City of Casa Grande Quick Codes Design Criteria Handout (rev. 11/8/2024).
  • 2018 International Mechanical Code (IMC), adopted by reference with City of Casa Grande amendments under Title 15. Source: City of Casa Grande Quick Codes Design Criteria Handout (rev. 11/8/2024).
  • 2018 International Plumbing Code (IPC), adopted by reference with City of Casa Grande amendments under Title 15. Source: City of Casa Grande Quick Codes Design Criteria Handout (rev. 11/8/2024).
  • 2018 International Fuel Gas Code (IFGC), adopted by reference with City of Casa Grande amendments under Title 15. Source: City of Casa Grande Quick Codes Design Criteria Handout (rev. 11/8/2024).
  • 2018 International Fire Code (IFC), adopted by reference as the City's uniform fire code under Title 15. Source: City of Casa Grande Quick Codes Design Criteria Handout (rev. 11/8/2024).
  • 2018 International Energy Conservation Code (IECC) governs residential and commercial energy-efficiency requirements. Residential energy efficiency design minimums published by the Building Department include: new/replacement HVAC sized per ACCA Manual J & S (gas furnaces/boilers 80% AFUE minimum; air conditioners and heat pumps 14 SEER minimum); duct insulation per ACCA Manual D (R-8 within attics/exterior, R-6 within other portions); common insulation values of R-13 walls, R-38 ceilings, U-0.40 windows, R-0 crawlspace/slab-on-grade, R-3 water/refrigerant lines. Source: City of Casa Grande Quick Codes Design Criteria Handout (rev. 11/8/2024).
  • 2018 International Property Maintenance Code (IPMC), adopted by reference under Title 15. Source: City of Casa Grande Quick Codes Design Criteria Handout (rev. 11/8/2024).
  • 2018 International Swimming Pool and Spa Code (ISPSC), adopted by reference under Title 15. Source: City of Casa Grande Quick Codes Design Criteria Handout (rev. 11/8/2024).
  • 2017 National Electrical Code (NEC/NFPA 70), adopted by reference with City of Casa Grande amendments (note: electrical code cycle is one edition behind the 2018 ICC set). Arc-fault and tamper-resistant outlet protection is required at most locations per the 2017 NEC. Source: City of Casa Grande Quick Codes Design Criteria Handout (rev. 11/8/2024).
  • NFPA 99 Standards for Health Care Facilities, adopted by reference under Title 15. Source: City of Casa Grande Quick Codes Design Criteria Handout (rev. 11/8/2024).
  • 2009 ICC A117.1 Accessible and Usable Buildings and Facilities, adopted by reference under Title 15. Source: City of Casa Grande Quick Codes Design Criteria Handout (rev. 11/8/2024).
  • 2019 City of Casa Grande Building and Technical Administrative Code (CG-BTAC), made a public record by Resolution No. 5170, with a 2022 Amendment made a public record by Resolution No. 5397. This locally-authored administrative code governs permit administration, fees cross-references, and technical amendments layered on top of the adopted ICC model codes. Source: City of Casa Grande Building and Technical Administrative Code, 2019 Edition (casagrandeaz.gov/DocumentCenter, Resolution 5170) and Casa Grande Code of Ordinances § 15.04.010.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
No data reported
Trailing 12 months
299units

6 of 12 months reported · #31 in Arizona coverage by units

Year to date (2026 YTD through 2026-05)
247units

191 buildings · $51.6M valuation

4 month(s) reported to Census

Full year 2025
322units

259 buildings · $67.1M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Arizona building activity

Tips & gotchas

  • Arizona has no statewide mandatory building code — the City of Casa Grande independently adopts and amends its own construction codes under Title 15 of its Code of Ordinances and runs its own Planning & Development Department / Development Center; it does not defer to Pinal County for permitting within city limits.
  • Casa Grande's adopted code suite is one full ICC cycle behind some neighboring Arizona cities: 2018 IBC/IRC/IMC/IPC/IFGC/IFC/IECC/IPMC/ISPSC plus 2017 NEC, per the Building Department's own Quick Codes Design Criteria Handout (rev. 11/8/2024) — always confirm against the live handout in case of a subsequent code-cycle update, since AZBO directory listings (2018 IRC/2017 NEC) matched exactly at time of verification.
  • The 2019 City of Casa Grande Building and Technical Administrative Code (CG-BTAC), amended in 2022, is a locally-authored administrative code layered on top of the ICC model codes (Resolution 5170 base, Resolution 5397 amendment) — it governs permit administration and technical amendments distinct from the model code text itself.
  • Design criteria: 115 mph ultimate wind speed (Exposure C), Seismic Design Category B, 34°F winter design temperature, heavy termite potential (certificate of soil treatment required), 0-inch frost line depth, 0 psf ground snow load, negligible weathering — all site-specific per IBC Chapter 16/ASCE 7-16 for IBC-designed buildings.
  • Only three permit categories are billed as flat fees rather than ICC-valuation-based: swimming pools, electrical/mechanical/plumbing single-trade permits, and solar/battery-ESS permits. Everything else (new construction, additions, re-roofing, demolition) uses either the ICC Building Valuation Table tiers or a separately published flat fee specific to that permit type (e.g., $100 demolition, $125/$400 roofing).
  • Maximum Building Permit Fee is capped at $150,000 regardless of project valuation, per the FY 2025-2026 Consolidated Fee Schedule.
  • Casa Grande publishes a formal A.R.S. § 9-835 'Over-All Review Timeframes for Building Permits' chart (via its Regulatory Bill of Rights Directory) with a uniform structure: every permit classification gets a 2-business-day Administrative Completeness Review, followed by Substantive Review split into 'Review of Initial Submittal' and 'Review of Resubmittal and Staff Decision to Approve/Deny' stages (each ranging 10-30 business days depending on classification), summing to an Over-All Timeframe of 24-64 business days depending on project type.
  • Detached accessory structures 200 sq ft or less (residential) / 120 sq ft or less (commercial) with NO utility connections (electric, water, sewer) do not require a building permit — but Planning Department approval for size/height/setback compliance is still mandatory, a distinction easy to miss.
  • Re-roofing offers two flat-fee tracks: standard in-person inspection ($125, plan review included) or drone inspection ($400, plan review included) — maximum two layers of roof covering, no ice barrier underlayment required given the desert climate.
  • New/replacement HVAC must meet City-published minimums beyond the base IECC: 80% AFUE gas furnaces/boilers, 14 SEER air conditioners/heat pumps, sized per ACCA Manual J & S, with duct insulation per ACCA Manual D (R-8 attic/exterior, R-6 elsewhere).
  • Building inspections are scheduled through the WebPermits portal (rogue.casagrandeaz.gov/WebPermits); the City does NOT offer same-day inspections unless requested by 11:59 p.m. the prior business day, and inspectors run routes between 6 a.m. and 3:30 p.m.
  • Gas line repairs require a City permit and passed inspection BEFORE the gas utility will restore service — this is a hard prerequisite, not a parallel step.
  • This is one of PermitBase's first two Pinal County jurisdictions (alongside Florence, built in parallel) — Pinal County itself was not yet covered by any prior PermitBase jurisdiction file as of this build.

Comparable nearby cities

Coolidge
Both in Pinal County12 shared permit types~14 mi away
Compare fees →
Eloy
Both in Pinal County12 shared permit types~15 mi away
Compare fees →
Apache Junction
Both in Pinal County11 shared permit types~35 mi away
Compare fees →