Casa Grande building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Casa Grande, Arizona.
Verified 2026-07-06 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 510 E. Florence Boulevard, Casa Grande, AZ 85122
- Phone
- 520-421-8630
- Office hours
- Monday - Friday, 7:30 a.m. - 5 p.m. The Development Center is a 'one-stop shop' for building, engineering, fire, and planning plan review/permits/inspections. Building inspections are scheduled online through the WebPermits portal (rogue.casagrandeaz.gov/WebPermits); the City does not offer same-day inspections unless the request is received by 11:59 p.m. the prior business day, and inspectors run routes between 6 a.m. and 3:30 p.m.
- Website
- Official site
Published scheduling rules
- Inspections are scheduled online via the WebPermits portal (rogue.casagrandeaz.gov/WebPermits); same-day inspections are not available unless requested by 11:59 p.m. the prior business day, and inspectors run routes between 6 a.m. and 3:30 p.m. (Residential Building Permit (New Construction))
- Building inspections are scheduled through the WebPermits portal (rogue.casagrandeaz.gov/WebPermits); the City does NOT offer same-day inspections unless requested by 11:59 p.m. the prior business day, and inspectors run routes between 6 a.m. and 3:30 p.m. (General)
Inspection sequence
Applies to: Plumbing Permit
- 1
Underground/Slab
Before concrete pour — verify pipe slope, materials, cleanouts
- 2
Rough-In
After pipes installed, before walls closed
- 3
Final
Fixtures connected, water heater and gas connections verified, no leaks; required before gas utility will restore service on repaired lines
Applies to: Residential Addition / Remodel / Minor Alteration Permit
- 1
Foundation/Footing
Required before concrete pour for additions
- 2
Framing
Structural connections to existing structure
- 3
Final
Completed work verified against approved plans
Applies to: Residential Building Permit (New Construction)
- 1
Foundation/Footing
Before concrete pour
- 2
Framing
Structural framing, connections, egress, per 2018 IRC and City of Casa Grande design criteria
- 3
Building Final
For production builders, requires accompanying Planning Final and Development Center Engineering Final inspections before a Certificate of Occupancy is issued
Applies to: Certificate of Occupancy / Change of Occupancy Permit
- 1
Building Occupancy Inspection
Verifies life-safety and occupancy-classification compliance for the new use, conducted by the Building Department
- 2
Fire Occupancy Inspection
Conducted by the Fire Department, jointly with the Building Department inspection, per the City's own new-business-location guidance
Applies to: Electrical Permit
- 1
Rough-In
Wiring, box placement, and panel connections before walls are closed
- 2
Final
Devices installed, panel labeled, protections verified per 2017 NEC
Applies to: EV Charger / EVSE Permit
- 1
Rough-In
New circuit wiring, box placement, and panel connections before walls are closed, if applicable
- 2
Final
Charger unit installed, devices connected, protections verified per 2017 NEC
Applies to: Fire Sprinkler & Fire Alarm Permit
- 1
Rough-In / Underground
Underground piping, hangers, and system components before concealment; hydrostatic test performed on sprinkler/standpipe/underground piping systems
- 2
Final
System operational test verifying installation matches approved plans (sprinkler heads, alarm devices/panel, standpipes, or fire pump) per the 2018 IFC and referenced NFPA standards; one rough-in inspection, one re-inspection, and one final inspection are included with each permit fee
Applies to: Mechanical / HVAC Permit
- 1
Rough-In
Ductwork and equipment placement before walls closed
- 2
Final
Equipment operational, clearances and combustion air verified, efficiency ratings confirmed
Applies to: Residential Solar Photovoltaic (PV) / Battery ESS Permit
- 1
Rough Electrical
Conduit runs, wire sizing, disconnect placement before energizing
- 2
Final
Panel mounting, racking attachment, roof penetration sealing, electrical connections, and interconnection point verified per 2017 NEC
Final inspection only: Demolition Permit, Re-Roofing Permit, Sign Permit (Commercial/Business Signage)
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Casa Grande building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Casa Grande building permits
Get alerts for Casa Grande
We'll email you when Casa Grande's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.